Resume:

Curriculum Vitae

Personal Data

Name : Samsul Hadi

Date of Birth : Blitar, 02 December 1981

Contact number : 081*********

Address : Jl. Ubi VII no 22 Jagir

Wonokromo Surabaya

East Java Indonesia

Career Profile

As Commissioning engineer, responsible for monitoring, establishing safe condition prior to execution of DHI commissioning, reviewing commissioning procedure to ensure achieving specific purpose of each system and organizing commissioning schedule. Having a good experience in coordination and maintain good communication with all parties involved as well as verifying commissioning result and reports. Familiar with standard operational procedure for start up, shutdown and action in emergency condition. Member of Owner Commissioning team, actively involve on Pre-commissioning and commissioning on partial & integral testing of coal fired power plant. I Have experience on the operational of the power plant also power generation. Having experience on the heavy equipment services. Trained as a fire team member.

Education

Mechanical engineer, Polytechnic of Brawijaya University, Malang East Java – Indonesia

Married Status

Married at February 2010 with one daugther

Career Summary

1. Commissioning Engineer : December 2011 – 31 August 2012

PT Cirebon Electric Power, Owner of Cirebon Coal Fired Super Critical Power Plant 1 X 660 MW

Responsibility for:

• Acceptance of construction completion and establishing precondition prior to execution of commissioning activities.

• Provide support and guidance to the epc contractors in the development of project specific systems completions plan.

• Involve operations representatives in commissioning planning and execution. Ensure operations personnel are familiarized with plant equipment and systems according to the requirements the operability management plan.

• Provide guidance to epc contractors to ensure proper planning of commissioning activities and alignment of execution planning with pt and operations.

• Prepare all commissioning deliverables including turnover and completion packages (tcps), work packs, check-sheets, systems boundary drawings, systems description, minimum equipment testing matrix, commissioning procedures, preservation/de-preservation plans and procedures, completion dossiers, final systems list and priorities, commissioning spares, first fills, commissioning consumables, temporary equipment for commissioning, etc.

• Create a vendor support register for commissioning activities including timely mobilization and demobilization dates. Liaise with start-up lead to integrate commissioning and start-up vendor support requirements

• Provide onsite safety leadership to ensuring safe execution of commissioning activities and participate in pt safety initiatives

• Provide guidance and participate in commissioning activities during construction completion, static commissioning, dynamic commissioning and turnover of systems.

• Provide guidance and participate in the execution of discipline specific commissioning procedures, tcps and work packs and ensure that they are executed in accordance with the systems completion specifications. Assist with trouble-shooting of systems and processes when required.

• Provide guidance and participate in the execution of systems completion acceptance processes including walk-downs and punch list activities

• Review startup and operating manuals and provide input

• Provide support to the start-up team in the planning and execution of the facilities start-up and performance test

• Analyzing plant parameter trend/curve, event log and records to investigate the root cause of plant disturbance.

• Organizing commissioning report and reviewing according to contract specification.

• Conducting analysis and investigation in case of plant trip, find the root cause and propose the solution

• Reviewing procedure and verifying of Run back test ( FD fan and ID fan, Mill, Primary air Fan, BFPT )

• Monitoring operational DHI commissioning for achieving safety and reviewing according to contract specification.

• Reviewing procedure and verifying the result of Load Rejection from 150 KV CB

2. Mechanical commissioning Engineer : November 2010 – 30 November 2011

PT Zelan Priamanaya Tronoh Joint Operation, EPC of Rembang Coal Fired Power Plant 2 X 315 MW

Responsibility for:

• Organizing joint inspection with construction team referring to design EPC contract with PLN.

• Acceptance of construction completion and establishing precondition prior to execution of commissioning activities.

• Coordinating and verifying Individual test such as solo run and trial run of Induced and Forced draft fan, Condensate extraction and boiler feed pumps, pulverizers, ESP system and bottom/fly ash system

• Conducting combustion observation and adjusting boiler damper, winbox damper, secondary air damper for proper operation

• Conducting boiler flow test for both secondary and primary air, including orifice adjustment on each coal discharge pipe

• Conducting internal inspection of : boiler furnace, air/flue gas ducting including dampers and gates, economizer and air preheater, steam drum and pulverizer

• Supervising Boiler protection test, first oil firing, boiler tightness test up to nominal operating pressure, on load safety valve setting and checking boiler expansion

• Responsible for Steam blow activities from preparation, coordination with all parties involved, inspection prior and during steam blow, until acceptance of target plate result.

• Monitoring Bypass operation for water steam quality improvement (Silica purge operation)

• Organizing first coal firing by ensuring readiness/ completion of individual test of all related equipments such as coal feeder, pulveriser, primary and seal air fan, sootblower, ESP, bottom and fly ash system.

• Reviewing procedure and verifying the result of Run back test ( FD fan and ID fan, Mill, Primary air Fan, BFPT )

• Reviewing procedure and verifying the result of Load Rejection from GCB and 150 KV CB (house load operation)

• Supervising and coordinating all parties involved in operation of the plant, including construction/maintenance department to sustain continuous operations.

• Analyzing plant parameter trend/curve, event log and records to investigate the root cause of plant disturbance and to find the correct solution.

• Organizing commissioning report and reviewing according to contract specification.

3. Assistance Unit Controller Boiler and Turbine : June 2010 – September 2010

PT YTL Coal fired Power Plant 2x610 MW East Java Indonesia

• Work closely with Unit Controller, responsible for maintaining availability and safe operation of the unit.

• Supervise field operator for routine work and assist for trouble shooting

• Create daily report and defect report related to Plant operations and during plant outage.

• Monitoring plant efficiency and environmental limit

• Conducting analysis and investigation in case of plant trip or de-rating, find the root cause and propose the solution

4. Field Operator Boiler and Turbine : May 2006 – May 2010

PT YTL Power Plant 2x610 MW East Java Indonesia

• Fully responsible for monitoring field condition, conducting a routine check and reporting all abnormal condition, give valid feedback to Control room operator.

• Maintaining safety procedure as per PowerGen safety rules.

• Responsible for the operation and trouble shooting of local equipment

• Appointed as an Authorized Person (AP) to do isolation, de-isolation and safety precaution such as draining, venting, purging and releasing stored energy according to safety rules, in accordance with instruction of PTW officer (Senior Authorized Person/SAP)

5. Mechanical Technician specialist Electrician : January 2005 – April 2006

PT Trakindo Utama ( Heavy Equipment ) Rungkut Surabaya, East Java, Indonesia

• Record the data of the unit heavy equipment due to analisys the problem

• Diassambly and Assembly the unit heavy equipment according standard service manual maintenance

• Analisys and Solve trouble shooting equipment Dozer, excavator, wheel loader, generator set and another heavy equipment system engine and electric system

• Repaired Hydraulic sysem the heavy equipment

• Analisys SOS and PM heavy equipment following service manual book

Functional Experience / Achievements

• Familiar with programmable logic control

• Familiar Hydraulic & pneumatic control system

• Authorized person to provide safety the system according to Powergen Safety rules, for mechanical plant and LV apparatus

• Familiar with PF code (Pulverised fuel) to avoid fire and explosion of coal firing system

• Maintenance and repaired the heavy equipment, mechanical equipment.

• Member of Fire team in coal fired power plant

• Familiar DCS control

• Familiar mechanical and electrical drawing

• Familiar Microsoft office, excel, Auto CAD etc

• Ability to arrange Quality Control Standard Operational

• Good communication skill

• Good manpower supervision skill during boiler test & commissioning

Referees

1. Angus Baird – Commissioning Manager of PT Cirebon Electric Power, Owner of cCirebon Coal Fired Super Critical Power Plant 1 x 660 MW Kanci, west java, Indonesia

Phone :+628*********

2. James Murray – Project Site Representative of PT Cirebon Electric Power, Owner of Cirebon Coal Fired Super Critical Power Plant 1X660 MW, west java, Indonesia

Phone: +628*********

3. Mudjianto – Commissioning Leader of PT Cirebon Electric Power, Owner of Cirebon Coal Fired Super Critical Power Plant 1X660 MW, west java, Indonesia

Phone: 085********

4. Ishak Hadi Winarto – Senior Resident Engineer/Commissioning Manager of PT. ZPT, EPC of Rembang Coal Fired Power Plant 2x315 MW, Central Java, Indonesia

Phone: +62-81-252*****

5. Heru Darsanto – Shift Manager of PT. YTL East Java O&M of Paiton Coal Fired Power Station 2x610MW for Jawa Power as the owner, East Java, Indonesia