|
Resume alert |
Resumes 21 - 30 of 196 |
Canton, MI
... Wind Turbine Blade Design Jan 2015- May 2015 Design, analyze and release statistical data of turbine blade using NX, CATIA & ANSYS. Choose accurate twist, taper and angle of attack by applying physics principles. Six sigma approach on turbine ...
- 2020 Mar 27
Farmington, MI, 48336
... Audited and reported results of 50 Major Turbine Path audits within DTE system. Acting Manager DTE Energy, Fossil Generation Performance Reporting 2007 – 2015 Administer/Manager the Power Plant Performance Management (P3M) System for DTE Energy. The ...
- 2020 Feb 13
Birmingham, MI
... 00 PROJECTS MSU Power Plant Project Project Leader February 2019 - May 2019 ● Tasked with evaluating a problem within the turbine and condensers of the MSU power plant — Required information about how much power the turbine was producing vs how much ...
- 2020 Jan 27
Westland, MI
... for Trucks/” Iveco& Daewoo” Libya branch) o Pumps (Loloat Libya for general construction) o Hydraulic systems (water and sewage company) Designing, developing, and manufacturing of many products: o A hybrid system to improve gas turbine plant using ...
- 2019 Sep 28
Windsor, ON, Canada
... Operation and maintenance of 100MW power plant turbine division. In 4 months time, complete Competency examination for Power plant engineer certificate to operate boiler, thus promoted as Plant manager for Boiler operations. PERSONAL DETAILS Date of ...
- 2019 Aug 30
Saline, MI
... Lafarge Corporation March 1987 to December 1998 Powerhouse & Turbine Maintenance Manager Managed all the production & maintenance activities of a large power generation facility. Led the implementation of TPM (Total Productive Maintenance), 5S and ...
- 2019 Jul 31
Ypsilanti, MI
... International Turbine Industries June 2014-November 2016 Ypsilanti, MI I work as a Stock Room Clerk. My responsibilities include properly executing all duties assigned to me, which include sales and purchasing. I perform the incoming review to ...
- 2019 Jun 04
Detroit, MI
... Feasibility study, Design and installation of 5KW wind turbine for Nepal Telecommunications. 6. Designed and involved in implementation of 3-phase electrical system in Nepal Polytechnique Veterinary Hospital.
- 2019 Mar 16
Farmington, MI, 48336
... Williams International, Walled Lake, MI Designer and manufacturer of small gas turbine engines for military and commercial applications. Quality Assurance Engineer Researched, implemented and reported on quality requirements for multiple military ...
- 2019 Feb 06
New Boston, MI
... Calibrated magnetic and turbine flowmeters and developed calibration procedure for continued use. Prepared graphical analysis of cylinder head, intake manifold, and air intake system benchmark data. Toyota Technical Center May - Aug 2013 Co-op, ...
- 2018 Dec 05