... Wieringenmeer (Sweden) SIMATIC PCS7 (V7.1, SP3) Conversion project ABB (Turbine controller logic to Siemens SIMATIC PCS7. PROFESSIONAL EXPERIENCE Tej Control System Pvt Ltd. Trainee Project Engineer –Design Division, August 2010- July 2011 Job ...
- 2020 Dec 13
Mumbai, Maharashtra, India
... One Day International Conference on ‘POWER SECTOR SUSTAINBILITY IN EMERGING RENEWABLE ENERGY ERA’ Done By ‘NATIONAL POWER TRAINING INSTITUTE’, MINISTRY OF POWER, INDIA Areas of Interest : Boiler protection Turbine protection Thermal cycle COMPUTER ...
- 2020 Dec 10
Mumbai, Maharashtra, India
... • Participate in one week training program of solar energy held by URJA SETU Bladeless wind turbine . • Attended one week training program of“AC DRIVES (SIEMENS MICROMASTER -440)” held by ADVANCED TRAINING INSTITUTE ( A.T.I ) Interpersonal • ...
- 2020 Nov 07
Mumbai, Maharashtra, India
... maintenance and calibration of the control valves(Pneumatic valve, Bleed valve,Mov,Nrv,Flowserve,Airtorque,Valtek,Masoneilan,Aumatek,Bettis) Experience in flow meters configuration (electromagnetic, orifice plate, ultra- sonic turbine, mass flow ...
- 2020 Nov 03
Purne, Maharashtra, India
... Entire Civil Works of Turbine Generator foundation i.e. excavation, making BBS, Layout of TG raft, Power House Building. B)Experience from beginning: - 1)Name of Company : - Abhi Engineering Corporation, Nagpur Post : - Site Engineer (Execution) ...
- 2020 Oct 06
Mumbai, Maharashtra, India
... ●Proficiency in streamlining the working procedures, Log sheets of Boiler, Turbine, Generator Boiler Commissioning Activities of 6X660MW: ●Lead the commissioning team of boiler rotating equipments. ●Commissioning of Axial Flow ID, PA, FD fans, APH ...
- 2020 Sep 24
Mumbai, Maharashtra, India
... Commission of Turbine supervisory instruments which includes 8 speed pick up, two expansions, two casing expansion, 3 axial pick up, 10 shaft vibration and 5 bearing vibration. Commission of DEH system, which includes 6 governing valves and four ...
- 2020 Sep 10
Mumbai, Maharashtra, India
... CLEARED DGCA MODULAR EXAMINATION • Aviation Legislation • Electrical Fundamentals • Basic Aerodynamics • Materials and Hardware • Maintenance practice • Gas Turbine Engine • Propeller • Electronic Fundamentals ACCOMPLISHMENT Got selected for ...
- 2020 Aug 21
Mumbai, Maharashtra, India
... Well versed with construction activities like oil & gas, turbine & boiler, compressor, exchanger, Column, Piping fabrication, Punch list item. Record of accomplishment in the commencement and completed of major multidiscipline projects at ...
- 2020 Aug 11
Mumbai, Maharashtra, India
... Engineering feasibility study for electrical contingency arrangements for Open Cycle Commissioning of the Gas Turbine Generator. Review of vendor submitted documents like SLD, GA, type test certificates, data sheets, ct/pt sizing calculations & ...