New Delhi, DL, India
... system in Diploma “Open type wind tunnel system design and fabrication” as a mini project in B.E “Vertical axis wind turbine for high ways medium” as a main project in B.E CO- CURRICULAR ACTIVITIES: Successfully coordinated the National Level ...
- 2016 May 03
New Delhi, DL, 110001, India
... Operation and maintenance of turbine generator (6 MW) and DG set. To look after all the activities of instrument workshop and implementing preventive maintenance (PM) and general maintenance (GM) schedules. Manpower handling in order to have the ...
- 2016 Apr 27
New Delhi, DL, 110001, India
... Sets, Pumps, Boilers, Turbo Boilers, Turbine L.P.G. Plant Softening plant fork lifts & pay loaders etc. M/S Shyam Century Ferrous Ltd., Meghalaya 11/01/2005 to 30/04/2005 11,000/- P.M. Sr. Engineer Mech. Erection of Turbine & Boiler INDO DANISH TOOL ...
- 2016 Apr 26
New Delhi, DL, 110001, India
... Worked as Engineer at MEGHALAYA POWER LIMITED, 43MW,coal based power plant, since Dec’2009 to Jan’2012 it was having 2x90TPH CFBC boiler(TKIIL),1x43MW steam turbine Meghalaya Power Ltd. is a subsidiary company of Star Cement which is the Largest ...
- 2016 Apr 06
New Delhi, DL, 110001, India
... BATHINDA”which included Study of working of steam turbine, heat exchanger,cooler,combustion chamber”. SOFTWARE COMPETENCIES Completed one year computer programme from “C-NIT” ( Sep 2010- Aug 2011) Microsoft Word, Excel, PowerPoint AutoCAD Solid ...
- 2016 Mar 23
New Delhi, DL, 110001, India
... POWER LIMITED from MAY 2014 To Yet.( A 2*150MW CFBC THERMAL POWERPLANT) ROLE’S & RESPONSEABLITIY : Maintenance and trouble shooting of SUPCON ECS700 DCS system for M/S HANGZHOU AND HARBIN supplied Boiler, Turbine, BOP equipment and its auxiliaries. ...
- 2016 Mar 05
New Delhi, DL, 110001, India
... Thoothukudi Year of passing : 2013 SOFT SKILLS Office tools : MS-Office Operating system : Windows 7, XP EXPERIENCE DETAILS Turbine field operator in Variety Services,(Watsila India Ltd) Site - Ind Bharat Thermal Power Plant, 2 150 MW, Thoothukudi. ...
- 2016 Feb 28
New Delhi, DL, 110001, India
... BHEL make 20.4 MW Double Extraction Condensing Turbine. Key Responsibilities: Responsible for field & DCS operation of steam turbine and boiler operations. Implemented Standard Operating Procedures, equipment lockout tag out procedures of power ...
- 2016 Feb 21
New Delhi, DL, 110001, India
... parts of the force vehicle 4 week industrial training from, Bassi Power house during Jul-Aug 2011 Understanding the basics of power generation, equipment, turbine CV Curriculum Vitae CHARANJEET SAKLANI E-Mail : acth1g@r.postjobfree.com Mobile No. ...
- 2016 Feb 11
New Delhi, DL, India
... DCS Operation of Plant Turbine Operation Boiler Field Operation Field Equipments Changeover Professional Experience: M/S Noble Tech Industries Pvt.Ltd.-Uthiramerur. From July 2012 To December 2013 Designation – Turbine Operator – Plant Operation. M ...
- 2016 Feb 10