CURRICULUM VITAE
ABHAI KUMAR
Mb: 080********
Email: ************@*****.***
Objectives:
A versatile and creative Mechanical Engineering professional with 9.5 years of experience in Erection, Commissioning & maintenance of mechanical items. A determined individual with strong interpersonal and analytical skills willing to work as a key player in challenging & changing environments.
Professional Summary:
EDUCATION & QUALIFICATION
B. Tech. (Mechanical), BBD National Institute of Technology & Management Lucknow (U P Technical University, Lucknow) in 2006 with 71%
12th from U.P.Board with 72%
10th from U.P.Board with 62%
PASSPORT DETAIL
PASSPORT NO : L 5230717
DATE OF ISSUE : 17/10/2013
DATE OF ENDING : 16/10/2023
Total Work Experience (July 2006 to till date)
Experience with Beta Infratech Pvt. Ltd (Since Feb’2012 to till date)
Currently working as Asst.Manager in Beta Infratech Pvt. Ltd, 225 MW combined cycle, gas based Power plant, Kashipur, Uttarakhand since Feb.2012 to till date.
Beta Infratech Pvt. Ltd is associated with Soma Enterprises Ltd. BETA is having one solar plant in Punjab and one 225 MW combined cycle gas power plant in Kashipur, Uttarakhand.
Experience with MEGHALAYA POWER LIMITED. (From Dec’2009 to Jan’2012).
Worked as Engineer at MEGHALAYA POWER LIMITED, 43MW,coal based power plant,
since Dec’2009 to Jan’2012 it was having 2x90TPH CFBC boiler(TKIIL),1x43MW steam turbine
Meghalaya Power Ltd. is a subsidiary company of Star Cement which
is the Largest manufacturer of cement in North East of India.
Experience with Bajaj Energy Pvt. Ltd.)from july 2007 to Dec’2009)
Worked as Engineer at Bajaj Energy Pvt. Ltd.(90 MW Thermal power plant) Maqsudapur,in Sahajahanpur, U.P. India’ since July 2007 to Dec’2009.,it was having 2x180TPH CFBC boiler,2x45MW steam turbine
Worked with ‘Bhushan Steel & Strips Ltd. Mumbai India’ .(from july 2006 to June 2007)
Post: Graduate Engineer Trainee & Assistant Engineer
Project: Erection & Commissioning of annealing project.
Experience with Beta Infratech Pvt. Ltd (Since Feb’2012 to till date)
Responsibility:
Involved in Maintaining scope of work, drawings, intra department information and daily progress report of all Mechanical activities
Involved in Planning & Execution of all the project activities
Involved in erection & commissioning of 2x75 MW Gas Turbine, Model 6FA & Generator, GE Make.
Making Test reports of all the pre-commissioning and commissioning activities and compare it with standard values.
Involved in erection & commissioning of Lube oil & gas module, Load Gear & other accessories of GTG like washing skids, Fuel gas skid,SFC,CO2 fire fighting system & PEECC as per drawings.
Alignment of gas turbine & load gear with generator
Involved in Installation of structures & enclosures of turbine & generator
Involved in Pre-commissioning & commissioning activities like lube oil flushing, leak testing, Pressure Testing of piping’s of gas turbine, generator, P&ID checking as per process requirement
Exposure in material management of gas turbine and Steam turbine, checking of material as per
Packing list, stacking of material as per requirement of erection /maintenance/spare
Involved in Foundation checking of 1x75 MW STG with reference to the mechanical
erection Drawing & modification if required, installation of foundation bolts & sole Plates.
Involved in Installation of 1x75 MW Steam turbine of GE (Oil & gas),Italy.
Involved in Inspection of Front, rear axial thrust & journal bearing, removal of
Preservative, modification in the centering ring of rear bearing & reassembly
Involved in erection & commissioning of turning gear and alignment of Steam turbine with generator
Involved in lube oil flushing of all pipings of STG and steam blowing
Involved in erection & commissioning of all the auxiliaries of Steam turbine including, Lube oil console,Lube oil cooler, jacking oil skid, oil clarifier, mist eliminator, gland steam
Condenser, H.P. accumulator, ESV
Involved in Installation of all interconnected piping’s of STG & GTG
Involved in the erection & commissioning of 2x113.2TPH,110kg/cm2 HRSG (Thermax make) & its accessories,BFP,drums LP,IP &,HP,circulation pump & its structures
Familiar with Air cooled condenser (GEA),Ejector system, CEP, cooling towers for auxiliary cooling water
Familiar with WTP and WWTP (Thermax make)
Familiar with Fin Fan Cooler system(ICL make) for GAS turbine
Experience with MEGHALAYA POWER LIMITED. (From Dec’2009 to Jan’2012)
Responsibility:
Involved in Planning and execution of project activities on daily, weekly & monthly basis,
Involved in preparing progress reports & balance sheets
Involved in Erection & commissioning of 2x90 TPH CFBC boiler of Thyssen Krupp Industries India Pvt. Ltd.
Involved in Preassembly of boiler pressure parts
Involved in Erection of boiler pressure parts, Boiler Drum, water pannels, Economiser Coils,evaporator coils, Super heater coil, screen tubes, headers& riser tubes
Involved in Erection of Air preheater, SA fan & P.A. fan, Boiler feed water pump
Familier with coal handling plant
Maintenance of 8MW running plant having 1x40TPH water tube Travelling Grate boiler of Veesons Energy Pvt. Ltd.
Involved in erection & commissioning of 1x43MW steam Turbine & Generator of BHEL make
Involved in erection & commissioning of all the auxiliaries of steam turbine including Lube oil tank, Jacking oil pump, Emergency oil pump, HP heaters, L.P. heater, GSC
Coordination with Vendors like BHEL & TKIIL & ensure quality execution in the field and follow up of the material with the vendors
Experience with Bajaj Energy Pvt. Ltd.)from july 2007 to Dec’2009)
Responsibility:
Involved in Planning and execution of project activities on daily, weekly & monthly basis,
Involved in preparing progress reports & balance sheets
Involved in Erection & commissioning of 2x180 TPH,110kg/cm2 CFBC boiler of Thyssen Krupp Industries India Pvt. Ltd.
Involved in Preassembly of boiler pressure parts
Involved in Erection of boiler pressure parts, Boiler Drum, water pannels, Economiser Coils,evaporator coils, Super heater coil, screen tubes, headers& riser tubes
Involved in Erection of Air preheater, SA fan & P.A. fan, Boiler feed water pump
Familier with coal handling plant
Involved in Installation of 2x45MW steam Turbine
Involved in Installation of all the auxiliaries of steam turbine including Lube oil tank, Jacking oil pump, Emergency oil pump, HP heaters, L.P. heater, GSC
Coordination with Vendors like BHEL & TKIIL & ensure quality execution in the field and follow up of the material with the vendors
Maintaining shift logbook, with the description of the events during the operation.
Do analysis of problems and take Corrective and Preventive action jointly With Quality.
Preparing reports as per system requirement.
Maintenance of C.F. pump, PA&SA FANS & their alignments with the motor couplings
Maintenance of different types material handling systems.
Managed project activities with a view to ensure timely accomplishment of project targets within the time and cost parameters.
Estimation of fabrication drawings, fabrication of coal bunkers,cyclones,structures, storage tanks, columns,beams & bracings
Worked with ‘Bhushan Steel & Strips Ltd. Mumbai India’ .(from july 2006 to June 2007)
Responsibility:
Planning & execution of different erection activities
Erection of Heating hood & cooling hood & interconnecting piping
Making work progress report of day to day erection activities
Overview of Galvanizing production line
Overview of colour coating line,
PERSONAL DETAILS
Father’s name : Mr.Harkesh Singh
Date of birth : 15th Nov.1981
Marital status : married
Languages known : Hindi & English
Sex : Male
Software skills : MS Office, AutoCAD
Expected Salary : Negotiable
PERMANENT ADDRESS
VILL. : Narawali
P.O. : Raja Ka Tajpur
Dist. : Bijnor (U.P.)
Pin : 246735
PERSONAL TRAITS
The above statements are true to the best of my knowledge and belief.
(ABHAI KUMAR)