Post Job Free

Transformer resumes in Madhya Pradesh, India

Sign in
Search for: Jobs   Resumes


Resume alert Resumes 11 - 20 of 45

Power Project

Jabalpur, MP, India
... Duration: - June 2016 Description: - Studied various types of sub-station equipments, their use in transmission of power, like potential transformer, current transformer, lightning arrestor, wave trap, transformer, bus-bar, bay, insulators, circuit ... - 2017 Nov 18

Electrical Engineer Project

MP, India
... Areas of Interest: 3 Phase Transformer. Vocational Training: Bhilai Steel Plant, Bhilai (C.G.). Chhattisgarh State Power Distribution Company Ltd.(CSPDCL) Bhilai (C.G) Experience: TOTAL WORKING EXPERIENCE:- Total 3.6 YRS. working experience. WORKING ... - 2017 Oct 11

Engineer Field

Indore, MP, India
... COMPANY LTD.INDORE REGION on 132KV / 33/11KV Sub-Station, Major Transformer Repairing Unit / H.T. Meter Lab./ LT-MT Lab Major Project (Jan 2013) 2Project report on “Solar Tracking System”. Work Experience Designation- Field Engineer DEEPAK PANCHAITY ... - 2017 Sep 27

Strategic Planning, Project / Construction Management, Budgeting And C

Jabalpur, MP, 482001, India
... erection of tower structures part & equipment, stringing, earthmat, construction of main gantry, auxiliary & transformer foundation, construction of control room building, residence building, RCC, Road, Tube Well, and Bay Control Unit Building etc. ... - 2017 Sep 05

Mechanical Engineer Electrical

MP, India
... Ltd - February 2015 to Present 015, working on CRGO - Electrical Laminations, Cut Laminations and Job Assemblies and Transformer Testing. Company Profile:- Mangal Electrical Industries Pvt. Ltd. came into force in the year 1990. Involved in the line ... - 2017 Jun 21

Engineer Design

Bhopal, MP, India
... Making of 3D drawings of different wood and glass components which have applications in Railways, Defense, Transformer industries. To taken out the weight of the particular product of the drawing on the Autodesk Inventor software. Supervision of ... - 2017 Jun 19

Project Power Plant

MP, India
... Installation and commissioning of 11KV/.433 KV Transformer Modification of overhead lines, LT Lines, HT Lines & platform Modification work. AMBUJA CEMENT, BHATAPARA (May- 2008 to Nov- 2010) (Electrical Site Engineer) Under Vishal Electrical’s M.P. ... - 2017 Apr 17

Engineer Power Plant

Indore, MP, India
... ● Erection and Commissioning of 40 MVA, 11/170 KV Transformer. ● Erection and commissioning of 120 MVAR Capacitor bank. ●Commissioning of 245 KV, 2000 Amps, 3pole, SF6 Gas Insulated Circuit Breakers. ● Installation and commissioning of 145 KV 2500 ... - 2017 Mar 21

Engineer Electrical

Burhanpur, MP, 450331, India
... SUMMARY: Dynamic professional +15-year experience in the Oil, Gas & Power field enhances with Project cum field services in Transformer up to 315MVA, 400KV class and on load tap changer. Project completion of 33KV Transmission line and sub-station, ... - 2017 Jan 29

Project Manager Engineer

MP, India
... Construction of new lines & Substation, Installation of Additional Augmentation of power Transformer at 2)Existing Sub-station & in various locations. 3) Keep in Project Management, planning & coordination. 4)Strong relationship management, ... - 2017 Jan 11
Previous 1 2 3 4 5 Next