Post Job Free
Sign in

Project Manager Engineer

Location:
MP, India
Salary:
9.0 LPA
Posted:
January 11, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

Durgesh Kumar Sharma H.No:- RZ-153, Vikas nagar

Mob-088********, 765448324 Uttam Nagar, New Delhi-110059

er. durgeshsharma81@ gmail.com

***************@*****.***

Objective:-

To perform the best and over come the challenges that crop day in the industrial environment with a vision of my own and result oriented approach in supporting the organization to achieve a firm stable and progressive leading position.

Professional Qualification:-

B.Tech Electrical from U.P Tech, securing 67.1%

Educational Qualification:-

10th Passed from U.P Board

12th Passed from U.P Board

Computer Skill:-

Platform: - Windows XP, 98, 2000.

M.S Office

Work Experience:-

1)Worked With BHR Pvt. Ltd as a Site Engineer since Aug. 2003 to sep-2006 Engaged with BSES RAJDANI POWER LTD. a power distribution company in Delhi (HVDS Project Delhi)

2)Worked with Shyam Indus power solution pvt. Ltd as a project engineer Since Oct.2006 to july2008 (RGGVY Project Una Himachal)

3)Worked with Ubitech pvt. Ltd as a Astt project manager since Aug.2008 to Jun-2010(RGGVY Project Haryana)

4)Worked with Ubitech (P) Ltd as a Project Manager since July-2010 to Aug-2011 (RGGVY Project Seoni M.P)

5)Worked with KMG ATOZ System (P) Ltd as a Project Manager (Construction) Since Sep-2011 to July2014 (RGGVY&FSP Project Umaria M.P)

6)Presently working with Technofab Engineering Ltd as a Project Manager Since Aug-2014 to till date (RGGVY Project)

Job Profile:-

1) Electrification of unauthorized colonies & HVDS colonies.

a) Site visit including site survey GPS&GIS System

b) Observing the present electrification of the colony, if any and preparing the report.

c) Categorization of the consumers of the colony in three categories i.e. domestic, commercial showing present condition of the assets at sight industrial and estimating the total no. of consumer in the colony

A)Load assessment of the colony in order to know the no. and the capacity of the transformers

required

B)Preparing the report and informing the management about the same through MIS

2) LT estimation work of the colony

a) Material estimation of H-pole type substation

b) Material estimation of distribution system of anew colony including evolution of assets like Poles,Conductors,Insulators,Stay sets,Earthing,Clamps,Angal,Irons etc. for its new electrification work

c) Work estimation of the above mentioned

3) HVDS estimation work of the colony (basic knowledge)

4) Work management

5) HT/LT Lines &sub station execution

6) Coordinate line man, site supervisor& site engineer

7) Feeder segregation work

8) Tube well connection HVDS (basic knowledge)

Job Responsibility:

a)Handling the whole project documents handing over to our client.

b)Deal with all managements problems related with engineers & other staff.

c)Handling the large team of labour & contactors labour

d)Handling the project at least 186 crores.

e)Checking the quality of the whole work.

f)About 30 engineers’ team works under me.

1)Responsibility for timely execution of project as per given technical specifications.

Construction of new lines & Substation, Installation of Additional Augmentation of power Transformer at

2)Existing Sub-station & in various locations.

3) Keep in Project Management, planning & coordination.

4)Strong relationship management, communication skills with the ability to network with Project Members, Consultants, Contractors with consummate case.

5)To Survey, Erection, Testing & Commissioning of 33 Kv Sub-Station.

6)To Ensure regular compliance of all obligations as per Project requirement.

7)To formulate of project budgets, maintaining project margins & liaisoning with client

8)Provide narrative analysis when require

9)To insure all working documents & data are maintained to back-up estimate figures

10)To Assists in the preparation of studies, material & methods, recommendations & cost estimates.

11)To Prepare all types of bills & planning

12) Material reconciliation & consumption

13)To meet clients regularly for their requirement.

14)To Supervise & manage the sub contractors

Keywords:

Commissioning, RGGVY, Feeder Separation, RAPDRP, HVDS, Supervision, Erection, Construction, Substation, Transmission, Resident Engineer, Project Engineer, Electrical Engineer, Distribution, Power

Personal Detail:-

Father's Name : Late. Shri. Kishan Lal Sharma

Mother’s Name : Smt. Ayodhaya Devi

Date of Birth : 15th July 1981

Hobbies : Playing & Watching Cricket

Languages : English, Hindi

Status : Married

Nationality : Indian

Location : Anywhere in India

Drawing CTC : Rs.08. 5 Lacs per annum

Expected CTC : Rs.9. 5 Lacs per annum

Notice Period : 15 Days

Place:- New Delhi

Date: 2017

(Durgesh Kumar Sharma)



Contact this candidate