DEVENDRA RAJ CHAKRAVARTY
Phone: +91-769*******
E-Mail: ***********.********@*****.*** ********.***********@**********.***
Asst. Manager Civil
Exposure in driving critical assignments across the career with proven success in ensuring optimum results
Targeting assignments in Project Management with a growth-oriented organization of repute in Construction or
Power Sector
Location Preferance: Madhya Pradesh, Chhattisgarh, Maharashtra, Gujarat
P R O F I L E S U M M A R Y
Civil Engineering Professional with over 17 years of qualitative experience in formulating strategic plans of engineering projects; establishing entire operations with key focus on profitability; managing several Sub-Station, transmission lines, Building, Road etc. construction.
Recently associated with KEI Industries Ltd., New Delhi as Asst. Manager Civil and spearheading the complete spectrum of the Civil / Electrical Operations
Displayed excellence in executing the entire project right from scratch to its completion while ensuring compliance and respect for community and legal requirements
Expertise in planning and executing construction projects with a flair for adopting modern construction methodologies; complying with quality standards; closure of contracts
Expertise in managing projects of diverse domains including Power Sub-Station (765/400/220/132/33 KV),
Transmission Line (132/33/11KV), Residence Buildings (G+4 Storied), Roads (WBM & RCC), All Type RCC, Brick & Stone Foundation, Earthworks, Over Head Tank, RCC. Retaining Wall, Cable Trench, Drain & Culvert, Chainlink Fencing, Boundary Wall, Finishing Work etc.
Capable of preparing and explaining the BOQ & Work Order
Result-oriented, self-driven leader and collaborator with proven aptitude to analyze, structure, negotiate / document complex transactions, formulate / implement strategies and achieve operating goals
C O R E C O M P E T E N C I E S
Strategic Planning
Project / Construction Management
Budgeting & Cost Control
Site Engineering
Billing
EHS Implementation
MIS Preparation
Estimation (Quantity & Cost)
Project Coordination
QA/QC/Field Engineering
Inventory / Resource Management
Vendor Selection
Store /Office / Guest House Management
Client / Contractors / Team Management BBS Preparation
Sub-Station / Transmission Line Construction Tower / Equipment Erection
Stringing / Jumpring
Earthmat Laying
JMC Preparation
MB Recording
O R G A N I S A T I O N A L E X P E R I E N C E
1st Sep.’16 2nd March’17 with KEI Industries Ltd., New Delhi as Asst. Manager Civil / Pile Expert
Project:
33/11 KV. GIS S/S At Chowk Varanasi (UP) under PGCIL.
17th Oct’14 – 14th June’16 (1 Year, 7 Months & 27 Days) with Varrsana Ispat Ltd., New Delhi as Project Manager
Project:
132/33 KV. Sub -Station & Transmission Line at Umreth (Chhindwara) under MPPTCL Client: Madhya Pradesh Power Transmission Corporation Ltd., Jabalpur (MP)
Reason For Change:
Project was not available at Company.
23rd Jun’09 – 15th Sep’14 (5 Years, 2 Months & 22 Days) with Safety Plus Power Ltd., Noida as Senior Engineer Civil
Growth Path:
Projects:
220/132 KV Sub-Station at Motiram Adda (Gorakhpur) under UPRNN
220/132/33 KV Sub-Station at Behat (Saharanpur) under UPRNN 220/132 KV Sub-Station at Janshath (Muzuffarnagar) under UPRNN 220/132 KV Sub-Station at Kursi Road (Lucknow) under UPPTCl
33/11 KV Transmission Line 12 Nos Project At UP. Area Under Sumaja Electroinfra Pvt.Ltd.
Reason For Change:
Project had been end at company
17th Dec’06 – 15th May’09 (2 Years, 4 Months & 22 Days) with Jyoti Structures Ltd., Mumbai as Project Manager
Growth Path:
Dec’06 – May’07 Site Engineer
May’07 – Dec’08 Officer - QC & QA
Dec’08 – May’09 Project Manager
Projects:
220/132/33 KV Sub-Station under Power Grid at Amona, Goa
220/132/33 KV Sub-Station under Noida Authority/NPCL, at Greater Noida
33/11 KV Indoor Sub-Station & DTH Building under MIDC (Sez Mihan Project) at Nagpur (MH)
Reason For Change: Salary Growth.
Oct’98 - Jun’06 (7 Yrs. & 8 Months) with S.L. Goyal, Jabalpur as Civil Engineer
Projects:
765 KV Sub-Station Auxiliary Foundation under Seimence Ltd./Power Grid C.I.L. at District Seoni (MP) WBM/RCC Road Work under Power Grid C.I. L. at District Seoni (MP)
Residence Building under Housing Board at Jabalpur & Chhindwara (MP)
Reason For Change: Career Growth.
Key Result Areas:
Project Management
Planning, initiating, executing and monitoring projects along time, cost and quality including technical (engineering) and techno-commercial coordination with all stakeholders
Preparing the brief of projected land requirement / space requirement in specific parts of the region based on marketing inputs, viability analysis & business plans
Tracking performance measures such as productivity, workforce utilization, savings in material, labor costs, reduction in project management expenses, improvement in projects, and coordination with HO
Site & Construction Management
Supervising all construction activities including providing technical inputs for methodologies of construction & coordination with site management activities
Identifying & developing a vendor source for achieving cost effective purchase of equipment, accessories & timely delivery so as to minimize project cost and ensuring on time payment to vendors
Coordination
Networking with architects / consultants / clients / contractors to ascertain technical specifications, construction related essentials, based on the prevalent rules
Maintaining excellent relations with statutory authorities for availing mandatory sanctions, also coordinating with consultant engineer, departments & supervisors for daily work progress
Contract Management
Managing the project start-up contracts / agreements, due diligence, formulation and negotiations in co-ordination with internal and external legal / commercial teams
Executing day-to-day contracts / commercial administration during execution stages and finally claims and arbitration management towards achieving the targeted financial objectives
Highlights:
Displayed excellence in taking cost & time effective measures to conclude projects on time and within budget
Played a key role in maintaining progress schedule placing various safety measures by provisioning protective gears such as helmets that was applicable for supervisors, laborers and other officials
Successfully executed key projects such as 132/33 KV Sub-Station & Transmission Line at Umreth (Chhindwara) within given time limit and delivery schedule
Working on several projects including erection of tower structures part & equipment, stringing, earthmat, construction of main gantry, auxiliary & transformer foundation, construction of control room building, residence building, RCC, Road, Tube Well, and Bay Control Unit Building etc.
I T S K I L L S
Operating System: MS Windows
Packages: MS Office (Word, Excel & PowerPoint)
Applications:
Internet & E-Mail
Tools:
Auto-Cad
K N O W L E D G E P U R V I E W
Survey, Contour & Layout
Preparation Of BOQ /Estimation (Qty. & Cost)
Preparation Of Drawing
Preparation Of Work Order
Approval Of GTP
Construction Of Structures Foundation
Vendor / Contractor Selection
Construction Of Control Room Building
Construction Of Tube Well / Boundary Wall
Construction Of Yard Fencing / Retaining Wall
Yard Levelling / Earthworks
Construction Of Road (WBM & RCC)/Culvert,
Approval Of Drawing
Drain
Construction Of Cable Trench / Earth Pit / Yard
Construction Management
Metalling / Bay Control Unit
Meeting With Client / Cntractors
Erection of Tower / Equipment / Earth Mat Laying
Office / Guest House / Store Management
Stringing / Jumpring
MIS Preparation
Billing / JMC / MB Recording
Imprest / Cash Flow Management (For Company &
Construction Planning
Site)
A C A D E M I C D E T A I L S
Diploma in Auto-Cad from Rajeev Gandhi Computer Saksharta Mission, New Delhi in 2006
Diploma (Civil Engineering) from MP Technical Board, Bhopal in 1998; Secured 72.50%.
12th (Math & Science) from MP Board Bhopal in 1996
10th (Math & Science) from MP Board Bhopal in 1995, Secured 64.61%
Date of Birth: 25th June 1978
Languages Known: English & Hindi
Mailing Address: Ward No. 75, Patel Nagar, Maharajpur, Jabalpur – 482001 (MP)