Pakistan
... 380/115/33kv Ais &Gis Substation with Over head tower line 45km Prainsa precast factory (Production precast structural elements i.e. columns, TT Slab,Hcs,beams,panels etc.) Saudi Aramco oil and gas separation plant Aramco project residencial ...
- 2022 Sep 20
Karachi, Sindh, Pakistan
... The project involved, load flow, short circuit and motor start study for 6.6 kV and 480 V networks, MG set for Ammonia-2 plant and offsites transmission line including new substation at offsites. This included custom made redesign of main busbar ...
- 2022 Aug 11
Rawalpindi, Punjab, Pakistan
... Proficiency in the application of industry standard software such as ETAP/ Dialux and preparation of detailed drawings for substation, electrical equipment & cable tray layout and preparation of Internal & External lighting layout. Decisive and ...
- 2022 Feb 28
Karachi, Sindh, Pakistan
... VISITS/TRAININGS o Industrial Visit to 132 Kv Wapda Substation Khairpur Mir’s. o Industrial Visit to Pakistan Cables, Karachi. o Industrial Visit to Pakistan Telecommunication Cables Ltd. Hub Balochistan. LANGUAGES o English: Fluent o Urdu: Fluent o ...
- 2022 Feb 20
Rawalpindi, Punjab, Pakistan
... • Lay out of pump station and water treatment plant and electrical substation. • Co-ordination with Client & PB Senior Surveyors for Checking & approval of the site activities. • Checking of as built drawings. • MS Office, Excel, Outlook etc. • ...
- 2021 Dec 26
Lahore, Punjab, Pakistan
... Engineer Electrical Design review of Tubular conductor for 500/220/132kV Rahim Yar khan Substation, earthing system for 500/220/132kV Rahim Yar Khan substation, and CT/VT Marshaling Kiosk for 500kV Rahim Yar Khan substation. Design review of ...
- 2021 Dec 23
Karachi, Sindh, Pakistan
... the construction 132/13.8 kv substation from the period of Nov-2015 to May-20-2016 • worked with ALFANAR Construction Co., at Project PE-147 for the construction of Sub Stations in New Military City Hamees from the period of May-13-2015 to Aug-2015. ...
- 2021 Dec 11
Islamabad, Islamabad Capital Territory, Pakistan
... Saudi Arabia Saudi Oger co Riyadh Civil /surveyor April 2008 to May 2011 Construction of Substation and Jamia Nora university. Mein Hadith Pakistan Ltd. Consultant company Surveyor Feb 2006 to April 2008 Defense Housing Authority Islamabad East ...
- 2021 Dec 03
Lahore, Punjab, Pakistan
... Name of project : 500 kV Rahim Yar Substation & 220 KV Kassowal Substation. Project History: Cost of both substation = 120 million USD. TBEA a Chinese group manufacturer of heavy transformer, shunt reactors and other equipments in power sector, has ...
- 2021 Nov 09
Multan, Punjab, Pakistan
... 400 kV,380kv,33 kV substation commissioning Pm,Cm of motor Lubricant and gresing Transformer testing Control cable and power cable glanding and termination Panel erection Motor maintenance Cable laying 132kv,11 kV testing commissioning Erection of ...
- 2021 Oct 18