Post Job Free

Resume

Sign in

Power Plant Hydro

Location:
Lahore, Punjab, Pakistan
Posted:
December 23, 2021

Contact this candidate

Resume:

Muhammad Saleem

***-*, ***** ****, ****** +92-332-******* adpp11@r.postjobfree.com

Sr. Electrical Engineer

Highly prudent and technically sophisticated Electrical Engineer with over 12 years of hands-on working experience in project management, high voltage, extra high voltage, medium voltage and low voltage electrical designing, project and site management, procurement, electrical engineering consultancy, supervision, testing and commissioning of electrical equipment such as auto transformer, distribution transformers, medium and low voltage switchgears, ring main units, generators, motors, solar panels, and air compressors. Proven track record of leading teams of main contractor and subcontractors in the execution of complex electrical installation projects from inception through completion as well as Development & modification of electrical services design to coordinate with requirements.

Defining electrical design project requirements for developing mega infrastructure, scheduling deliverables and tasks, hiring cross-functional teams, managing project budgets, and maintaining Live substations/power plants equipment’s such as Transformers, EHV circuit breakers, Disconnectors/earthing switches, Instrument transformers, Poles, Streetlights & safety equipment, overhead conductor, and underground cables.

A technically sophisticated professional with expertise in Microsoft office (word, Excel, power point), MATLAB, Digsi, and Omicron software.

Areas of Expertise

Project Management

Strategic Planning & Analysis

Quality Assurance/Control

Electrical Engineering

Operational Manual/Reports

Preventive Maintenance

Electrical Design & Equipment

Bidding Documentation

Plant Installation & Commissioning

Equipment Testing & Maintenance

Cross-Functional Leadership

Renewable Energy Studies

Professional Experience

National Engineering Services Pakistan (Pvt.) Ltd.(NESPAK), Head Office Lahore Sep 2012 – Present

Sr. Engineer Electrical

Design review of Tubular conductor for 500/220/132kV Rahim Yar khan Substation, earthing system for 500/220/132kV Rahim Yar Khan substation, and CT/VT Marshaling Kiosk for 500kV Rahim Yar Khan substation.

Design review of hardware and connectors for 500/220/132kV Rahim Yar Khan Substation; firefighting (SERGI System) for 500kV shunt reactor and 500/220kV, 220/132kV autotransformer and 132/11kV power transformer.

Controlled and protected panels schematic drawings review of 500/220/132kV Rahim Yar Khan substation.

As a senior engineer completed the Testing & Commissioning of 132/11kV FIEDMC substation; ensured factory acceptance tests (FATS) of 250MVA(220/132kV) autotransformer and 6.3MVA (132/11kV) power transformer.

Supervised factory acceptance tests (FATs) of AC & DC system for 500/220/132kV Rahim Yar Khan Substation; factory acceptance tests (FATs) of DC system for 500/220kV New Lahore Substation.

Prepared Bidding Documents for 11/132kV, 135MW Taunsa Hydro Power Project; Bidding Documents of 500kV Substation for RLNG based 1180MW CCPP BHIKKI Power Plant.

Reviewed Bidding Documents of 500kV Substation for RLNG based 1223MW CCPP BALLOKI Power Plant and Bidding Documents of 500kV Substationfor RLNG based 1230MW CCPP HavaliBahadur Shah Power Plant.

Evaluated bidding documents of 500kV substation for RLNG based 1263MW CCPP Jhang power plant.

Witness the Testing & commissioning of 500kV BHIKKI, 500kV Balloki and 500kV HavaliBahadur Shah substations.

Directed base and detail design review of 500kV Substation for BHIKKI, BALLOKI,HavaliBahadur Shah and 1263MW Jhang RLNG based Power Plant.

Gained and utilized acute knowledge and engineering experience at RLNG based 1180MW Bhikki, 1223MW Balloki and 1230MW HavaliBahadur Shah CCPP Power plants.

1180 MW CCPP BHIKKI and 1223 MW RLNG BASED CCPP BALLOKI:

Base and detail Design Review of 500kV Switchyard

Ensured 500kV switchyard complete testing including switchyard equipment and control and protection Scheme

Testing of 550MVA GSU Transformers (Siemens Make), Auxiliary Transformer& Main Cooling Water Pump

Functional and Relay Testing of GSU & Auxiliary Transformer and Generator

Testing of 9HA.01 Generator and MV & LV panels

Installation of Generator and Rotor

Testing of Auto Transfer Scheme of Auxiliary Transformer

National Engineering Services Pakistan (Pvt.) Ltd.(NESPAK) Aug2011 to Sep 2012

Sr. Engineer Electrical, 220kV Grid station Burhan

Led civil works, erection, testing and commissioning of 160MVA, 220/132kVthree phase autotransformer; the scheme for conversion of 220kV double bus double breaker scheme into one andhalf breaker scheme.

Managed civil works, erection and testing of equipment, such as Disconnector/Earthing Switches, current transformers, voltage transformers and surge arrester, CT and CVT circuit verification.

National Engineering Services Pakistan (Pvt.) Ltd.(NESPAK) Jul 2011 to Dec 2011

Engineer Electrical- 500Kv Sheikh MuhammadiPeshawar - Pakistan

Supervised the Civil works for addition of 3x150MVA Auto transformer bank (ATB-3) at Sheikh Muhammadi Grid-station Peshawar, also managed and completed installation of 450MVA Autotransformer bank.

Led the installation of high voltage equipment including Current transformers, Capacitor voltage transformers, Circuit Breakers, Disconnector/Earthing Switches, and Surge Arrester etc.

Oversaw the complete civil work, erection, testing and commissioning of 220KV switchyard high voltage bus work for addition of transformer bay and complete erection and testing of 160MVA, 220/132kV three phase transformer

Spearheaded the complete teasing and commissioning of all above said equipment/schemes/functional testing.

National Engineering Services Pakistan (Pvt.) Ltd.(NESPAK) Jan2009 to Jun 2011

Engineer Electrical - 500kV Ghakkar Substation - Pakistan

Led construction activities of equipment foundation, control house buildings, Trench layout etc., completed Testing and Commissioning of Siemens / ABB make Relays, Control Panels and Local Control Cubical etc.

Ensured installation/erection of 500/220/132kV equipment/high voltage bus-bars; commissioning of 700KVA, 415V 3 phase Cummins Make Generator for auxiliary supply of 500/220/132kV Substation.

Installed, tested and commissioned LV& MV switchgear panels and DC system including battery banks & battery chargers for 220V, 110V and 48V. Witness the complete functional testing of substation equipment.

Supervised the complete testing of Switchyard equipment e.g., Current transformers, Capacitor voltage transformers, Circuit breakers, Disconnecting Switch, Earthing Switch, etc.

Supervised the complete erection and commissioning of 500/220KV Transformers & 220/132KV Siemens make Autotransformers and 132/11kV Siemens make power transformer.

Education& Other Credentials

2021 M.Sc. Engineering Management, University of Engineering &Technology, Lahore – Pakistan

2008 B.Sc. Electrical Engineering, University of Engineering &Technology, Lahore, Pakistan

Trainings

•2 days Training on “Basic Writing Skills

•2 days Training on “Presentation Skills”

•2 days Training on “Effective Time Management”

•2 days Training on“Information Handling”

•2 days Training on “Introduction to Project Management”



Contact this candidate