Post Job Free

Sewer resumes in Phoenix, AZ

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 51 - 60 of 108

Operator / Pipe layer

Mesa, AZ
... Theodolites Pipe Layer 8 yrs & 8 mos Sewer Lines: Clay pipe from 4” to 12” main line and services. Plastic I’m experienced in cutting, beveling, laying, slinging (if size was over 12” and we were dealing with an excavation over 14’), Services and ... - 2016 Jan 18

Engineer Mechanical

Glendale, AZ
... Scoped, specified and designed modifications to site mechanical systems for project throughout the Renton Site, including HVAC, EMCS, compressed air, waste treatment, domestic water, storm and sanitary sewer and other miscellaneous systems and ... - 2015 Oct 04

Construction Superintendent, Scheduler, Estimator

Tempe, AZ
... Exterior work included new underground sewer from the workroom and kitchen to an added 1,100 gallon concrete grease interceptor. Sewer penetrations required core drilling under floors at the workroom and new kitchen areas. The stores with back ... - 2015 Jun 16

Professional Mechanical Engineer

Phoenix, AZ
... Plumbing design included potable water and sewer design, healthcare gas and vacuum piping, and clean dry compressed air piping. Fire protection design included wet-pipe sprinkler systems, foam- water systems, and electrical centrifugal fire pumps. * ... - 2014 Apr 21

Customer Service Manufacturing

Mesa, AZ
... W Infrastructure 2011 (6 months) Sewer sonar profiling, rehabilitation and cleaning by use of high pressure water and a powerful vacuum with camera to remove any type of soil, drilling mud, rocks without damaging existing underground infrastructure. ... - 2013 Sep 12

Customer Service Mechanical Engineer

Tempe, AZ, 85281
... MAXIMIZED EFFICIENCY AND SAFETY THROUGH ONGOING MONITORING/MAINTENANCE OF SEWER BYPASS . INSPECTED PIPE AND FITTINGS FOR LEAKS, AS WELL AS FOR DAMAGE OR POTENTIAL MECHANICAL PROBLEMS . OPERATED DITCH-WITCH AND ENSURED FULL FUEL LEVELS OF PUMPS AND ... - 2013 Aug 13

Power Plant Construction

Glendale, AZ
... Thank You, Chad Whisenhunt Hunter Construction - Gilbert AZ Project Superintendent June 2010 - March 2013 Water, Sewer, Storm Drain and RWCD, Structures Piping, Private Irrigation, Dry Ups, Roadways Widening, Street Lighting, Traffic Signals, Phases ... - 2013 Jul 23

Project Manager Engineer

Chandler, AZ, 85050
... • Worked in the Pahrump Nevada master plan preparation that included land use, sewer, water, and traffic and flood control for a 400 square mile area. • In charge of infrastructure analysis and master plan layouts analysis for "Loreto Bay" a 8,280 ... - 2013 Jul 17

Customer Service Manager

Avondale, AZ
... Updated water consumption averages of 2,000 accounts in order to produce individualized sewer billings 2. Implemented the new Fire Service billing - Added 4,000 new customer records 3. Designed and implemented improvements to their current billing ... - 2013 Jul 02

Driver Professional

Phoenix, AZ, 85208
... Barns – 1-866-***-**** Cooper Sewer and Drain Occupation; Honey Wagon Driver (Single-tandem-tanker) 1256 East Baseline Rd. Apache Junction Arizona February 2010- May 2010 Contact Mr. Copper – 480-***-**** May Trucking Occupation; Professional Driver ... - 2013 Mar 04
Previous 3 4 5 6 7 8 9 Next