|
Resume alert |
Resumes 11 - 20 of 137 |
Al Khobar, Eastern, Saudi Arabia
... project management in engineering design consultancy and construction industry with varied key projects involved and completed such as oil & gas refinery/plant/support building facilities, chemical plant, power and generating plant and warehouse. ...
- 2023 Dec 21
Qatif governorate, Eastern, Saudi Arabia
... Working as an Instrumentation & Electrical project engineers design, develop, and control the electrical systems used in Aromatics project and various refinery shut down project. The core function of the project is to loading and unloading of full ...
- 2023 Dec 01
Qatif governorate, Eastern, Saudi Arabia
... in the field of QA/QC inspection department for welding, of pipeline/piping/RTR in construction, engineering, supervision, testing, coordination, painting/coating, project management in EPC projects of petrochemicals refinery/oil & gas industries. ...
- 2023 Nov 09
Dammam, Eastern, Saudi Arabia
... With over twenty-two (22) years of professional experience in the field of Post Weld Heat Treatment (PWHT) in Electro-Mechanical Plant, Industrial, Power, Ethylene, Nickel Mining, Petrochemical, Acrylic Acid, Geothermal and Refinery Plants. ...
- 2023 Nov 05
Al Khobar, Eastern, Saudi Arabia
... TECHNICAL HIGH SCHOOL, Thrissur.] [STATE SYLLABUS] Worked as Safety Supervisor in BPCL, Kochi Refinery (C/o Basil Engineering Contractors), from February 2021 to September 2023. Worked with Safety Careers Institute (c/o NIFS), Thrissur as Safety ...
- 2023 Nov 05
Dammam, Eastern, Saudi Arabia
... (SAUDI ARAMCO TOTAL REFINERY of PETROLEUM & CHEMICALS), (Contract # 300*******) – “Jubail Export Refinery Project”. oSAUDI POLYMERS-DAELIM Plant construction, at Jubail-1, KSA. (NATIONAL CHEVERON PHILIPS), (Contract # NCP-C-007A). oSAUDI ARAMCO, ...
- 2023 Nov 04
Qatif governorate, Eastern, Saudi Arabia
... SASREF oil refinery Jubail . Furness tubes replacement and pipe line defect portion and new pipe line fabrication installation, testing, commissioning. And same plant several shutdowns. 200*-****-**. IBN-ZAHR COMMON FACILITY UPGRADE PROJECT pipe ...
- 2023 Nov 04
Al Khobar, Eastern, Saudi Arabia
... COMPANY LIMITED DOHA, QATAR DOHA METRO PHASE 1 RED LINE PROJECT 08th Aug 2017 To 28th Oct 2018 WAREHOUSE SUPERVISOR DESCON ENGINEERING LIMITED LAHORE, PAKISTAN NATIONAL REFINERY LIMITED KARACHI, PAKISTAN 01st June 2014 To 25th July 2017 SR. ...
- 2023 Oct 22
Dammam, Eastern, Saudi Arabia
... PREVIOUS EMPLOYER: Company: Yokogawa India Ltd Bangalore from contract (EXP: 2.1 Years) Duration: Oct 2008 to Nov 2010 Designation: Project Engineer (DCS) Projects Handled at Yokogawa India Ltd Bangalore: Title: Essar Refinery End User: Essar ...
- 2023 Oct 21
Dammam, Eastern, Saudi Arabia
... KSA (March 2015 – Present) Project Undertaken: Ras Al-Khair Power Plant (March 2015 – January 2016) – Jubail, KSA Jazan Refinery & Terminal Projects (Feb 2016 – May 2016) – Jazan, KSA Naphtha and Aromatics Package (July 2016 – May 2017) – Rabigh ...
- 2023 Oct 21