PERSONAL DATA
NAME : ROLANDO O. ANGELES JR.
POSITION : QC INSPECTOR – PWHT
DATE OF BIRTH : 10 OCTOBER 1976
NATIONALITY : FILIPINO
LANGUAGE SPOKEN : ENGLISH / TAGALOG
SUMMARY OF BACKGROUND
With over twenty-two (22) years of professional experience in the field of Post Weld Heat Treatment (PWHT) in Electro-Mechanical Plant, Industrial, Power, Ethylene, Nickel Mining, Petrochemical, Acrylic Acid, Geothermal and Refinery Plants. Implementing, executes and ensuring that the good practice of quality system of workmanship has been met in accordance of Project Specification, Code & Standards. Promoting services by company objectives, providing quality output in all aspect of works.
Approvals and Qualifications:
- Approved Saudi Aramco PWHT QC Inspector at Jazan Refinery Project Naphtha
& Aromatics Processing Unit, Transmittal No.# TR-JF/AF-5620)
- Approved SABIC PWHT Inspector for General Construction Works (AREP) Project Transmittal No.# T-01-PR-AREP-JS-1006
- Approved PWHT Inspector for SHAYBAY IGHC Project Fabrication Pipe Spool Project Transmittal No.# P4-T-SS-SA-2881
DUTIES AND RESPONSIBILITIES
Review approved project procedure & relevant technical specification prior to conduct of PWHT Inspection.
Review and validation of heat treatment reports, charts and verification of proper implementation of work procedure through surveillance for ensuring that related steps of procedures are being followed.
Witness heat treatment using electrical resistance heating element in the form of ceramic heating pad and checks proper installation of thermocouple wire, type K. Compensating Cable Type K. thermocouple putty, secondary power cables and splitters, and ceramic fiber insulation blanket.
Perform pre-inspection meeting prior for PWHT activities.
Witness of in process and final inspection of PWHT activities.
Prepare request for inspection and testing request (RFIT) including day to day coordination with customer’s representative for the smooth execution and implementation of inspection activities.
PWHT inspection, which includes verification of each joint or component such as location, drawing, diameter wall thickness, materials, heating rate, cooling rate, soaking temperature, soaking time and number of thermocouple used. CV of RO Angeles
Page 2 of 4
Verifies and validates calibration certificates of equipment used to perform PWHT such as (e.g. Temperature Recorder, PWHT Machine, Induction Machine, Power Source, Programmer, Surface Pyrometer).
Verifies the Non-Destructive Examination (NDE) required before and after PWHT as per line class required.
Supervise and monitors PWHT and pre-heating activities and directly report to immediate superior on the status of the said activities. WORK EXPERIENCES
Company Project Name Position
AL RUSHAID
CONSTRUCTION CO. LTD.
SABIC LTA FOR FURNACE RETUBING
SHUTDOWN, JUBAIL INDUSTRIES
SUPERVISOR
PWHT
Sept 2022 – Mar 2023 JUBAIL, SAUDI ARABIA
AL RUSHAID
CONSTRUCTION CO. LTD.
SAUDI ARAMCO HAWIYAH UNAYZA GAS
RESERVIOR STORAGE PROJECT
SUPERVISOR
PWHT
MAY 2021 – JULY 2022 HAWIYAH SAUDI ARABIA
AL RUSHAID
CONSTRUCTION CO. LTD.
MAN POWER SUPPLY AT IBN SINA
(AYTB) PROJECT,
PWHT
MARCH 2021 – APRIL 2021 JUBAIL INDUSTRIES, SAUDI ARABIA INSPECTOR AL RUSHAID
CONSTRUCTION CO. LTD.
SABIC – SAUDI KAYAN EMERGENCY
SHUTDOWN PROJECT,
PWHT
OCT 2020 – FEB 2021 JUBAIL INDUSTRIES, SAUDI ARABIA INSPECTOR AL RUSHAID
CONSTRUCTION CO. LTD.
KHURAIS RESTORATION PROJECT
(SNAMPROGETTI)
PWHT
JUNE 2020 – JULY 2020 KHURAIS SAUDI ARABIA INSPECTOR AL RUSHAID
CONSTRUCTION CO. LTD.
GENERAL CONSTRUCTION WORKS
(AREP) PROJECT,
PWHT
NOV 2019 – APRIL 2020 JUBAIL INSDUSTRIES, SAUDI ARABIA INSPECTOR AL RUSHAID
CONSTRUCTION CO. LTD.
REFRACTORY LINED OUTLET HEADER
REPLACEMENT WORKS SASREF PROJECT
PWHT
SEPT 2019 – NOV 2019 JUBAIL INDUSTRIES SAUDI ARABIA INSPECTOR AL RUSHAID
CONSTRUCTION CO. LTD.
SAUDI ARAMCO JAZAN NAPHTHA &
AROMATICS PROCESSING UNIT
PWHT
JULY 2015 – FEB 2019 COMPLEX PACKAGE 12 PROJECT INSPECTOR JAZAN INDUSTRIES SAUDI ARABIA
AL RUSHAID
CONSTRUCTION CO. LTD.
NAPHTHA & AROMATICS RP2
MECHANICAL WORK PETRO RABIGH
FOREMAN PWHT
MAY 2015 – JULY 2015 RABIGH, SAUDI ARABIA TECHNICIAN AL RUSHAID
CONSTRUCTION CO. LTD.
WIDE EO RACTOR REPLACEMENT
PROJECT,
FOREMAN PWHT
JUNE 2014 – MAY 2015 SABIC AFFILIATES PROJECT TECHNICIAN CV of RO Angeles
Page 3 of 4
AL RUSHAID
CONSTRUCTION CO. LTD.
SHAYBAH IGHC PROJECT FABRICATION
PIPE SPOOL PROJECT
PWHT
DEC 2012 – NOV 2013 JUBAIL SAUDI ARABIA INSPECTOR
AL RUSHAID
CONSTRUCTION CO. LTD.
SAMCO PROJECT, JUBAIL INDUSTRIES PWHT
MARCH 2011 – NOV 2012 JUBAIL, SAUDI ARABIA INSPECTOR AL RUSHAID
CONSTRUCTION CO. LTD.
SASREF REFORMER TUBES UPGRADES PWHT
MARCH 2011 – MARCH
2012
JUBAIL, SAUDI ARABIA TECHNICIAN
AL RUSHAID
CONSTRUCTION CO. LTD.
NCP NORTH PLOT PROJECT PWHT
OCT 2009 – FEB 2010 JUBAIL, SAUDI ARABIA TECHNICIAN AL RUSHAID
CONSTRUCTION CO. LTD.
SHUQAIQ – II WPP PROJECT PWHT
JAN 2009 – SEPT 2009 SHUQAIQ, SAUDI ARABIA TECHNICIAN EEI GORO NICKEL MINING PROJECT PWHT
MARCH 2006 – SEPT 2008 NEUNAIA, NEW CALIDONIA TECHNICIAN EEI KHI, COAL POWER PLANT PROJECT PWHT
MARCH 2006 – SEPT 2008 CAGAYAN DE ORO CITY, PHILIPPINES TECHNICIAN EDUCATIONAL ATTAINMENT
A. Course
Electric Arc Welding & Lathe - TESDA Manpower
Machine Operation (Machinist) Mariveles, Bataan, Philippines
(1997 - 1998)
Auto Diesel Technology (ADT) - Samson Institute Technology
(1995 – 1997) Edsa, Cubao. Quezon City, Philippines B. Special Courses/Seminars & Training Taken:
• Post Weld Heat Treatment Training Courses
(Sponsored by ARCC-EEI)
• Advance Total Quality Management (TQM) Seminar
(Sponsored by ARCC-EEI)
• TQM Orentation Course
CV of RO Angeles
Page 4 of 4
(Sponsored by ARCC-EEI)
• Total Quality Management
(Sponsored by ARCC-EEI)
• Safety and Enviroment Course
(Sponsored by GCT)
• Non-Destructive Testing Course
(Sponsored by EEI Corp.)
• Foremanship Course
(Sponsored by ARCC-EEI)
I hereby Certify that the above information is true. ROLANDO O. ANGELES JR.