Post Job Free

Resume

Sign in

Ras Al Khair RC Site Hse m

Location:
Qatif governorate, Eastern, Saudi Arabia
Salary:
standard
Posted:
November 04, 2023

Contact this candidate

Resume:

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com

Mobile # 053*******

1

CURRICULUM VITAE

(EHSS Environment as Health Safety superintendent, Manager.)work with Aramco

,Sabic,Farabi, Royal commission,

1. Candidate’s Name : Abdul Sattar Pir khan

2. Total Work Experience: +20Years

3. Confirmation of Candidate’s capability in written and spoken English: Good 4. Educational qualifications: Bachelor Of Commerce & Diploma of Associate Engineering (Mechanical) and NEBOSH IGC

5. Current work location: Ras Al Khair /Jubail Cooling water supply and return pipe line 3.300 Dia . Water channel, valve chamber . EB electrical buildings. Water out fall siphons. coffer dam. 6. Project Position : Site HSE Manager / shutdown/ construction works 7. Employer: Petroleum, Chemicals & Mining Company Jubail Saudi Arabia 8. Current work location: Royal Commission Ras Al Khair /Jubail October 2021 to continue 9. SASREF Saudi Aramco jubail shall company October 2020 September 2021 10. Project: Farabi yanbu 21st Oct,2017- to date August 2020 11. Lubref,Samsung, expansion project yanbu Nov 2017 12. RC Royal commission Jubail, Ras al khair MADEEN October 2016 13. Aramco yanbu pipe line, expansion project work,IBN,Rushid, YENPET,YNGL, pipe line.2012- Aug 2016 HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

2

14. Jubail united project new construction project. 2008 -2011 15. Samad Jubail expansion project changing heater tubes,and catalyst column internal replacement. 2006 to 2007 16. SASREF oil refinery Jubail . Furness tubes replacement and pipe line defect portion and new pipe line fabrication installation, testing, commissioning. And same plant several shutdowns. 200*-****-**. IBN-ZAHR COMMON FACILITY UPGRADE PROJECT pipe line, new equipment installation,structural installation. 2001-2003

18. SHARQ expansion project .piping structure new equipment installation water pound construction .cooling water tank.

Sr. No University College Degrees Discipline emphasis Professional Certifications Year 1

Karachi

University

Karachi University Finance & Administration B.Com 1992 2

Karachi

University

Karachi Ship Yard

College

Mechanical engineering Diploma 1996

3 NEBOSH Saudi Arabia NEBOSH IGC

Nebosh International General

Certificate

2013

Site HSE

Manager

Royal Commission

Yanbu /Jubail

R.C

Same as following

July 2022

continue

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

3

1

2

Site HSE

Manager

Site HSE

Manager

RC Royal

commission Ras Al

Khair

Sasref oil refinery

Jubail

Role and Responsibility

Monitors the

implementation of the

requirements of Safety

Management Plan and

arrange continuous and

formal daily safety

monitoring to ensure

compliance and

effectiveness.

To liaise with and support

Area

Engineers/Superintenden

ts/Supervisors to promote

safety awareness in their

area of responsibility.

To detect, identify,

Hazards analyze, control,

eliminate and recognized

hazardous condition,

behavior and violation.

To investigate and report

immediately in writing all

accidents, unsafe acts,

Oct 2017 to

Jun 2020

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

4

3 Site HSE

Manager

Normal Paraffin and

Derivatives Complex

near misses occurred at

work site and the report

shall be submitted

immediately to the

concerned personnel.

Monitoring the

implementation of

compliance

Monitors the

implementation of the

requirements of Safety

Management Plan and

arrange continuous and

formal daily safety

monitoring to ensure

compliance and

effectiveness.

To liaise with and support

Area

Engineers/Superintendents

/Supervisors to promote

safety awareness in their

area of responsibility.

To detect, identify,

analyze, control, eliminate

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

5

and recognized hazardous

acts, condition, behavior

and violation.

To investigate and report

immediately in writing all

accidents, unsafe acts,

near misses occurred at

work site and the report

shall be submitted

immediately to the

concerned personnel.

Monitoring the

implementation of

completed Risk

Assessments.

Monitoring the correct usage

of safety barriers

Monitoring the correct

usage of safety barriers,

including timely removal.

Assists in preparing

toolbox talk subjects for

the supervisors and

monitor its compliance.

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

6

Responsible in issuing

detailed weekly/monthly

safety reports including all

accident/incident, hazards

and near-misses observed,

manpower, man-hours

worked and submit to

concerned personnel.

Involved in ensuring safety

discrepancy logbook is

posted in each work areas,

its location can be easily

noticed/accessed and the

supervisors review the

logbooks on regular basis

to take the necessary

corrective action.

To participate in the

weekly safety audit

inspections and to ensure

that all the unsafe

acts/conditions reported

are corrected.

Coordinates with Client

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

7

Safety management team.

Involved in preparing and

issuing Final Safety Report

for the Project.

19. PROFESSIONAL WORK EXPERIENCE IN DESCENDING ORDER: 9.1 SINCE EMPLOYMENT WITH CONTRACTOR PETROLEUM, CHEMICALS & MINING COMPANY (PCMC)

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

1

Site HSE

Manager

UMM WU’AL

PROJECT RAS

AL KHAIR

MA’ADEN

DAP/NPK

PLANT

Ma’aden

Phosphate

Company

Monitors the implementation of the

requirements of Safety Management

Plan and arrange continuous and

formal daily safety monitoring to

ensure compliance and effectiveness.

To liaise with and support Area

Engineers/Superintendents/Supervisors

to promote safety awareness in their

area of responsibility.

Jan,2016 Sep,2017

21

Months.

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

8

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

To detect, identify, analyze, control,

eliminate and recognized hazardous

acts, condition, behavior and violation.

To investigate and report immediately

in writing all accidents, unsafe acts,

near misses occurred at work site and

the report shall be submitted

immediately to the concerned

personnel.

Monitoring the implementation of

completed Risk Assessments.

Monitoring the correct usage of

safety barriers, including timely

removal.

Assists in preparing toolbox talk

subjects for the supervisors and

monitor its compliance.

Responsible in issuing detailed

weekly/monthly safety reports

including all accident/incident, hazards

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

9

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

and near-misses observed, manpower,

man-hours worked and submit to

concerned personnel.

Involved in ensuring safety

discrepancy logbook is posted in each

work areas, its location can be easily

noticed/accessed and the supervisors

review the logbooks on regular basis

to take the necessary corrective

action.

To participate in the weekly safety

audit inspections and to ensure that

all the unsafe acts/conditions

reported are corrected.

Coordinates with Client Safety

management team.

Involved in preparing and issuing Final

Safety Report for the Project.

2

Site HSE

Manager

LUBEREF

YANBU

LUBEREF As Above Mar,2013 Jan,2016

21

Months

for three

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

10

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

REFINERY

EXPANSION

PROJECT

projects.

3

Site HSE

Manager

YNGL

ARAMCO

PROJECT

YANBU

Saudi Aramco

(Under

SABIC)

As above Mar,2013 Jan,2016

4

Site HSE

Manager

IBN RUSHD

II U&O

PROJECT

(Under

CTCI)

IBN RUSHD As above Mar,2013 Jan,2016

5

Safety

Superinte

nd

/Manager

CIVIL

WORKS –

POLYETHY

LENE

PLANT -

SHARQ

3RD

EXPANSIO

N PROJECT

(SHARQ) As Above May,2011 Feb,2013

20

Months

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

11

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

6

Safety

Superinte

ndent

GULF

FARABI

PARAFFIN

AND LAB

PLANT

PROJECT

GULF FARABI

PETROCHEMI

CAL

COMPANY

(UNDER SNC

LAVALIN)

Responsible for Coordinating Activities

for the Loss Prevention of Human being

and Material Resources at Site.

The Development of Safety Plan.

Audits / Inspection with report

preparation.

Various Training with Record Keeping and

schedule preparation.

Publicity of Safety Program.

Incident Investigation and Report

Preparation.

Arranging and addressing the tool box

talk and supervisor’s meeting.

Record keeping of Inspection for Power

Tools, Heavy Equipment, Vehicles and

Lifting Gears.

Ensure that Safety Posters and Sign

Board are posted in Prominent and

Jan,2010

April,201

1

16

Months

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

12

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

Appropriate location.

Monitoring the different site Check Lists

to evaluate and measures

HSE Performance against identified

standards and to ensure compliance with

the site safety policy.

Prepare Job Safety Analysis and risk

Assessment for Critical Activities.

Ensure that waste management being

adhered to.

Ensure that necessary safety and survival

Equipment is available and vehicles are in

operational condition.

Ensure that environmental requirements

in the construction Sites are adhered.

Prepare Handouts and Booklets, News,

Letters and other information for

Distribution to Project Personnel.

Supervise the Implementation of the

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

13

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

Plans and program assigned to the Safety

Officers and supervisors in the field.

Monitor all medical and accidents cases

for the purpose of analyzing Trends and

patterns.

Ensure that fire and safety equipment are

available / serviceable and that stock for

vital parts are at hand.

Attended Co-ordination meetings

involving company, client, and sub-

contractors management.

Arranging, Conducting and reporting the

emergency mock drills at site and camp.

7

Safety

Superinten

dent

UNITED

OLEFINS

COMPLEX

PROJECT –

GENERAL

CONSTRUCT

ION & OSBL

JUBAIL UNITED

PETROCHEMIC

AL COMPANY

As above Aug,2007 Dec,2009

28

Months

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

14

S

.

N

Job Title Project name Client Brief Description

Start of

Project

Finish of

Project

No. of

Years in

each job

Month/ Year title

8

Safety

incharge

DE-BOTTLE

NECKING

PROJECT

YANPET As above Dec,2005 July,2007

20

Months

9

Safety

Superinte

ndent

ROYAL

COMMISSIO

N SWC

SIPHON

REPAIR

AND OFF

TAKE

STRUCTUR

E

Marafiq KRT

1 Same as above Dec,2003 Oct,2005

22

Months

1

0

Safety

Superviso

r

IBN-ZAHR

COMMON

FACILITY

UPGRADE

PROJECT

IBN-ZAHR Site Monitoring & Implementation of HSE

Protocols.

July,2001 Nov,2003

28

Months.

HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

15

10. MAINTENANCE / SHUTDOWN/CONSTRUCTION PROJECTS:

10.1 IBN ZAHR PP-1 AND PP-II SHUTDOWN TCTA

Overhauling of Heat Exchangers (42 No’s), Vessels (44 No’s), Columns (5 Nos.), Reactors (02 No’s), Filters (20 Nos.) at PP1

& 2 Plants during TCTA. Shutdown duration 13 days. 10.2 SADAF EDC SHUTDOWN

Shutdown duration 28 days. Worked as a safety supervisor with Sadaf for their EDC shutdown June 2004. 10.3 PETROKEMYA VCM T/A

Turnaround and inspection of 10 – Columns and replacement of 02 – Bundles, 02 – Heat Exchangers, 02 – Fin Fan Coolers. Shutdown duration 10 days

10.4 PETROKEMYA OLEFINS – 1 SHUTDOWN

Turnaround and inspection of 17 - heat exchangers and 05 – Columns. Shutdown duration 10 days 10.5 SASREF OPR SHUTDOWN

OPR Major Shutdown: Turnaround and inspection of 91 - heat exchangers, 47 - Fin fan coolers, 16 – Columns, 11 – Furnaces, 5 – Reactors 14 - Tanks, 72 – Vessels, 24 – Valves, among other stationary equipment and huge quantity of defects job in Aromatic Unit. Shutdown duration was 17 days. Peak Manpower 1300. 10.6 SHARQ 1-EG/1 & 2-UTILITY SHUTDOWN

Turnaround and inspection of 68 - heat exchangers, 15 columns, 36 Vessels, 178 Valves, and Various miscellaneous equipment in 1 EG & 1 Utility Plant (10 days S/D). Total Workforce – 374 HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

16

10.7 ARAMCO OIL REFINERY (YANBU) TURNAROUND SHUTDOWN 10.8 COLUMAN INTERNAL REPLACEMENT

10.9 PETRO RABIGH T/A – EXCHANGERS & COLUMNS

Exchangers and Columns

10.10 SAMREF OIL REFINERY T/A

Inner screen replacement, piping Line Renewal .Furness Tubes Replacement. COURSES ATTENDED

Safety Supervisors Course - Fluor Arabia Ltd. / JUPC Project First Aid Training Course - Al-Mana Hospital/ ROYAL commission hospital yanbu Basic Firefighting Course - Fluor Arabia Ltd. / JUPC Project Hot Work Safety - Fluor Arabia Ltd. / JUPC Project Confined Space Entry - Fluor Arabia Ltd. / JUPC Project HSE Supt, Manager (Mr. ABDUL SATTAR)

ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******

17

Elevated Work Safety - Fluor Arabia Ltd. / JUPC Project BLS & FIRST AID - RC HOSPITAL

Leader ship certificate - JACOBS/LUBEREF

BEYOND ZERO - JACOBS/LUBEREF

REFERENCES: Will be furnished on demand



Contact this candidate