HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com
Mobile # 053*******
1
CURRICULUM VITAE
(EHSS Environment as Health Safety superintendent, Manager.)work with Aramco
,Sabic,Farabi, Royal commission,
1. Candidate’s Name : Abdul Sattar Pir khan
2. Total Work Experience: +20Years
3. Confirmation of Candidate’s capability in written and spoken English: Good 4. Educational qualifications: Bachelor Of Commerce & Diploma of Associate Engineering (Mechanical) and NEBOSH IGC
5. Current work location: Ras Al Khair /Jubail Cooling water supply and return pipe line 3.300 Dia . Water channel, valve chamber . EB electrical buildings. Water out fall siphons. coffer dam. 6. Project Position : Site HSE Manager / shutdown/ construction works 7. Employer: Petroleum, Chemicals & Mining Company Jubail Saudi Arabia 8. Current work location: Royal Commission Ras Al Khair /Jubail October 2021 to continue 9. SASREF Saudi Aramco jubail shall company October 2020 September 2021 10. Project: Farabi yanbu 21st Oct,2017- to date August 2020 11. Lubref,Samsung, expansion project yanbu Nov 2017 12. RC Royal commission Jubail, Ras al khair MADEEN October 2016 13. Aramco yanbu pipe line, expansion project work,IBN,Rushid, YENPET,YNGL, pipe line.2012- Aug 2016 HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
2
14. Jubail united project new construction project. 2008 -2011 15. Samad Jubail expansion project changing heater tubes,and catalyst column internal replacement. 2006 to 2007 16. SASREF oil refinery Jubail . Furness tubes replacement and pipe line defect portion and new pipe line fabrication installation, testing, commissioning. And same plant several shutdowns. 200*-****-**. IBN-ZAHR COMMON FACILITY UPGRADE PROJECT pipe line, new equipment installation,structural installation. 2001-2003
18. SHARQ expansion project .piping structure new equipment installation water pound construction .cooling water tank.
Sr. No University College Degrees Discipline emphasis Professional Certifications Year 1
Karachi
University
Karachi University Finance & Administration B.Com 1992 2
Karachi
University
Karachi Ship Yard
College
Mechanical engineering Diploma 1996
3 NEBOSH Saudi Arabia NEBOSH IGC
Nebosh International General
Certificate
2013
Site HSE
Manager
Royal Commission
Yanbu /Jubail
R.C
Same as following
July 2022
continue
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
3
1
2
Site HSE
Manager
Site HSE
Manager
RC Royal
commission Ras Al
Khair
Sasref oil refinery
Jubail
Role and Responsibility
Monitors the
implementation of the
requirements of Safety
Management Plan and
arrange continuous and
formal daily safety
monitoring to ensure
compliance and
effectiveness.
To liaise with and support
Area
Engineers/Superintenden
ts/Supervisors to promote
safety awareness in their
area of responsibility.
To detect, identify,
Hazards analyze, control,
eliminate and recognized
hazardous condition,
behavior and violation.
To investigate and report
immediately in writing all
accidents, unsafe acts,
Oct 2017 to
Jun 2020
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
4
3 Site HSE
Manager
Normal Paraffin and
Derivatives Complex
near misses occurred at
work site and the report
shall be submitted
immediately to the
concerned personnel.
Monitoring the
implementation of
compliance
Monitors the
implementation of the
requirements of Safety
Management Plan and
arrange continuous and
formal daily safety
monitoring to ensure
compliance and
effectiveness.
To liaise with and support
Area
Engineers/Superintendents
/Supervisors to promote
safety awareness in their
area of responsibility.
To detect, identify,
analyze, control, eliminate
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
5
and recognized hazardous
acts, condition, behavior
and violation.
To investigate and report
immediately in writing all
accidents, unsafe acts,
near misses occurred at
work site and the report
shall be submitted
immediately to the
concerned personnel.
Monitoring the
implementation of
completed Risk
Assessments.
Monitoring the correct usage
of safety barriers
Monitoring the correct
usage of safety barriers,
including timely removal.
Assists in preparing
toolbox talk subjects for
the supervisors and
monitor its compliance.
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
6
Responsible in issuing
detailed weekly/monthly
safety reports including all
accident/incident, hazards
and near-misses observed,
manpower, man-hours
worked and submit to
concerned personnel.
Involved in ensuring safety
discrepancy logbook is
posted in each work areas,
its location can be easily
noticed/accessed and the
supervisors review the
logbooks on regular basis
to take the necessary
corrective action.
To participate in the
weekly safety audit
inspections and to ensure
that all the unsafe
acts/conditions reported
are corrected.
Coordinates with Client
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
7
Safety management team.
Involved in preparing and
issuing Final Safety Report
for the Project.
19. PROFESSIONAL WORK EXPERIENCE IN DESCENDING ORDER: 9.1 SINCE EMPLOYMENT WITH CONTRACTOR PETROLEUM, CHEMICALS & MINING COMPANY (PCMC)
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
1
Site HSE
Manager
UMM WU’AL
PROJECT RAS
AL KHAIR
MA’ADEN
DAP/NPK
PLANT
Ma’aden
Phosphate
Company
Monitors the implementation of the
requirements of Safety Management
Plan and arrange continuous and
formal daily safety monitoring to
ensure compliance and effectiveness.
To liaise with and support Area
Engineers/Superintendents/Supervisors
to promote safety awareness in their
area of responsibility.
Jan,2016 Sep,2017
21
Months.
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
8
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
To detect, identify, analyze, control,
eliminate and recognized hazardous
acts, condition, behavior and violation.
To investigate and report immediately
in writing all accidents, unsafe acts,
near misses occurred at work site and
the report shall be submitted
immediately to the concerned
personnel.
Monitoring the implementation of
completed Risk Assessments.
Monitoring the correct usage of
safety barriers, including timely
removal.
Assists in preparing toolbox talk
subjects for the supervisors and
monitor its compliance.
Responsible in issuing detailed
weekly/monthly safety reports
including all accident/incident, hazards
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
9
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
and near-misses observed, manpower,
man-hours worked and submit to
concerned personnel.
Involved in ensuring safety
discrepancy logbook is posted in each
work areas, its location can be easily
noticed/accessed and the supervisors
review the logbooks on regular basis
to take the necessary corrective
action.
To participate in the weekly safety
audit inspections and to ensure that
all the unsafe acts/conditions
reported are corrected.
Coordinates with Client Safety
management team.
Involved in preparing and issuing Final
Safety Report for the Project.
2
Site HSE
Manager
LUBEREF
YANBU
LUBEREF As Above Mar,2013 Jan,2016
21
Months
for three
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
10
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
REFINERY
EXPANSION
PROJECT
projects.
3
Site HSE
Manager
YNGL
ARAMCO
PROJECT
YANBU
Saudi Aramco
(Under
SABIC)
As above Mar,2013 Jan,2016
4
Site HSE
Manager
IBN RUSHD
II U&O
PROJECT
(Under
CTCI)
IBN RUSHD As above Mar,2013 Jan,2016
5
Safety
Superinte
nd
/Manager
CIVIL
WORKS –
POLYETHY
LENE
PLANT -
SHARQ
3RD
EXPANSIO
N PROJECT
(SHARQ) As Above May,2011 Feb,2013
20
Months
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
11
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
6
Safety
Superinte
ndent
GULF
FARABI
PARAFFIN
AND LAB
PLANT
PROJECT
GULF FARABI
PETROCHEMI
CAL
COMPANY
(UNDER SNC
LAVALIN)
Responsible for Coordinating Activities
for the Loss Prevention of Human being
and Material Resources at Site.
The Development of Safety Plan.
Audits / Inspection with report
preparation.
Various Training with Record Keeping and
schedule preparation.
Publicity of Safety Program.
Incident Investigation and Report
Preparation.
Arranging and addressing the tool box
talk and supervisor’s meeting.
Record keeping of Inspection for Power
Tools, Heavy Equipment, Vehicles and
Lifting Gears.
Ensure that Safety Posters and Sign
Board are posted in Prominent and
Jan,2010
April,201
1
16
Months
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
12
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
Appropriate location.
Monitoring the different site Check Lists
to evaluate and measures
HSE Performance against identified
standards and to ensure compliance with
the site safety policy.
Prepare Job Safety Analysis and risk
Assessment for Critical Activities.
Ensure that waste management being
adhered to.
Ensure that necessary safety and survival
Equipment is available and vehicles are in
operational condition.
Ensure that environmental requirements
in the construction Sites are adhered.
Prepare Handouts and Booklets, News,
Letters and other information for
Distribution to Project Personnel.
Supervise the Implementation of the
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
13
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
Plans and program assigned to the Safety
Officers and supervisors in the field.
Monitor all medical and accidents cases
for the purpose of analyzing Trends and
patterns.
Ensure that fire and safety equipment are
available / serviceable and that stock for
vital parts are at hand.
Attended Co-ordination meetings
involving company, client, and sub-
contractors management.
Arranging, Conducting and reporting the
emergency mock drills at site and camp.
7
Safety
Superinten
dent
UNITED
OLEFINS
COMPLEX
PROJECT –
GENERAL
CONSTRUCT
ION & OSBL
JUBAIL UNITED
PETROCHEMIC
AL COMPANY
As above Aug,2007 Dec,2009
28
Months
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
14
S
.
N
Job Title Project name Client Brief Description
Start of
Project
Finish of
Project
No. of
Years in
each job
Month/ Year title
8
Safety
incharge
DE-BOTTLE
NECKING
PROJECT
YANPET As above Dec,2005 July,2007
20
Months
9
Safety
Superinte
ndent
ROYAL
COMMISSIO
N SWC
SIPHON
REPAIR
AND OFF
TAKE
STRUCTUR
E
Marafiq KRT
1 Same as above Dec,2003 Oct,2005
22
Months
1
0
Safety
Superviso
r
IBN-ZAHR
COMMON
FACILITY
UPGRADE
PROJECT
IBN-ZAHR Site Monitoring & Implementation of HSE
Protocols.
July,2001 Nov,2003
28
Months.
HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
15
10. MAINTENANCE / SHUTDOWN/CONSTRUCTION PROJECTS:
10.1 IBN ZAHR PP-1 AND PP-II SHUTDOWN TCTA
Overhauling of Heat Exchangers (42 No’s), Vessels (44 No’s), Columns (5 Nos.), Reactors (02 No’s), Filters (20 Nos.) at PP1
& 2 Plants during TCTA. Shutdown duration 13 days. 10.2 SADAF EDC SHUTDOWN
Shutdown duration 28 days. Worked as a safety supervisor with Sadaf for their EDC shutdown June 2004. 10.3 PETROKEMYA VCM T/A
Turnaround and inspection of 10 – Columns and replacement of 02 – Bundles, 02 – Heat Exchangers, 02 – Fin Fan Coolers. Shutdown duration 10 days
10.4 PETROKEMYA OLEFINS – 1 SHUTDOWN
Turnaround and inspection of 17 - heat exchangers and 05 – Columns. Shutdown duration 10 days 10.5 SASREF OPR SHUTDOWN
OPR Major Shutdown: Turnaround and inspection of 91 - heat exchangers, 47 - Fin fan coolers, 16 – Columns, 11 – Furnaces, 5 – Reactors 14 - Tanks, 72 – Vessels, 24 – Valves, among other stationary equipment and huge quantity of defects job in Aromatic Unit. Shutdown duration was 17 days. Peak Manpower 1300. 10.6 SHARQ 1-EG/1 & 2-UTILITY SHUTDOWN
Turnaround and inspection of 68 - heat exchangers, 15 columns, 36 Vessels, 178 Valves, and Various miscellaneous equipment in 1 EG & 1 Utility Plant (10 days S/D). Total Workforce – 374 HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
16
10.7 ARAMCO OIL REFINERY (YANBU) TURNAROUND SHUTDOWN 10.8 COLUMAN INTERNAL REPLACEMENT
10.9 PETRO RABIGH T/A – EXCHANGERS & COLUMNS
Exchangers and Columns
10.10 SAMREF OIL REFINERY T/A
Inner screen replacement, piping Line Renewal .Furness Tubes Replacement. COURSES ATTENDED
Safety Supervisors Course - Fluor Arabia Ltd. / JUPC Project First Aid Training Course - Al-Mana Hospital/ ROYAL commission hospital yanbu Basic Firefighting Course - Fluor Arabia Ltd. / JUPC Project Hot Work Safety - Fluor Arabia Ltd. / JUPC Project Confined Space Entry - Fluor Arabia Ltd. / JUPC Project HSE Supt, Manager (Mr. ABDUL SATTAR)
ad0ugp@r.postjobfree.com/ad0ugp@r.postjobfree.com Mobile # 053*******
17
Elevated Work Safety - Fluor Arabia Ltd. / JUPC Project BLS & FIRST AID - RC HOSPITAL
Leader ship certificate - JACOBS/LUBEREF
BEYOND ZERO - JACOBS/LUBEREF
REFERENCES: Will be furnished on demand