|
Resume alert |
Resumes 71 - 80 of 230 |
Pittsburgh, PA
... operation deficiencies to improve procedural compliance and safety during all aspects of reactor plant operations and maintenance evolutions Instructor – Nuclear Power Training Prototype 2011–2015 • Directly accountable for the classroom training of ...
- 2018 Feb 11
Carnegie, PA, 15106
... Bruce Mansfield Power Plant Bruce Mansfield, PA April 2010 Cut and replace boiler walls, welded with heli arc and stick. Babcock and Wilcox Stratton Power Plant Stratton, OH March 2010 Installed new duct work to boiler along with turning vanes, ...
- 2018 Feb 07
Murrysville, PA, 15668
... Developed annual detailed forecasts of stationary power tools for 5 US and 1 International plant Maintained monthly production schedules at all plants to support company sales forecast and inventory goals Professional Development Education: BS, MBA, ...
- 2018 Feb 07
Beaver, PA
... Personally responsible for marketing efforts leading to a project win with Dominion Power (Richmond Virginia) in late 2007 resulting in final design for highway/bridge improvements for VDOT facilities to support a new coal fired plant for Dominion ...
- 2018 Feb 01
Ellwood City, PA, 16117
... My role consisted of taking care of payroll, time sheets and health insurance for 74 power plant employees. During outages, I took care of travel, room accommodations, meals and communication for all employees and contractors from other countries. ...
- 2018 Jan 26
Indianola, PA, 15051
... – NRG/Homer City Power Station Inspection of weld repair on burners and installed ignitors for boiler Fluor/Daniels/Duke Energy- Masontown, PA Co-Gen Power Plant, Hydrostatic and nitrogen testing. Inspection of CT, High Energy Piping, and HRSG. ...
- 2017 Nov 27
Pittsburgh, PA
... ELECTRIC 5/13 - 3/17 Responsible for the product development and delivery of the innovative AP1000 passive plant technology. ... energy consulting firm specializing in nuclear power generation issues with an emphasis on new build development programs. ...
- 2017 Oct 15
Baden, PA
... of the Primary Equipment Project Team responsible for suppliers that manufacture Heavy Primary Equipment (Forging, Machining, Welding, Fabrication, and Assembly) for safety related ASME Section III Pressure Vessel equipment of a Nuclear Power Plant. ...
- 2017 Sep 29
Burgettstown, PA, 15021
... -Prepare and present power point presentations to upper management showing inventory totals, turnover, trends, plant excess, obsolete inventory and identified inventory that may need written-off for all locations. Accomplishments: -Responsible for ...
- 2017 Sep 14
Harmony, PA
... plant to complete any necessary software design changes in a timely manner. Minimized any potential delays or error through the comprehensive testing of plant computers. Delivered comprehensive support and recommendations throughout the initial power ...
- 2017 Aug 19