Baghdad, Iraq
... Etihad for food industries - Hillah- Babylon- Iraq from 1-10-2018 till 30-11-2020: thermal power plant project manager: This task is additional to my work as power plant manager of the present units 20MW back pressure steam turbines, now additional ...
- 2022 May 28
Basra, Iraq
... e) GTPP (Gas Turbine Power Plant) which includes 3x42MW GTGs, HV step-up transformers 11/132kV, HV&MV&LV step-down transformers 132/33kV&33/6.6kV&6.6/0.4kV, MV&LV motors 6.6&0.4kV, MV Caterpillar EDG 6.6kV, HV OHLs 132kV, MV OHLs 33kV, GIS 132kV, ...
- 2022 May 26
Basra, Iraq
... PROFESSIONAL SUMMARY PDMS, Piping Design, Layout & Stress Analysis, Spoolgen, Navis Works, Pressure Vessel Design, Auto Plant, Pro-Engineering, Auto Desk Inventor, Auto Cad, Autodesk Revit Mechanical Draughtsman, IT Pack SKILL SET SUMMARY Piping ...
- 2022 May 19
Iraq
... Provides technical guidance and support in troubleshooting and failure analysis of a wide range of electrical equipment in the Plant such as diesel generators, motors, drives, transformers, switchgear, battery, UPS, distribution panel and utilities. ...
- 2022 Feb 28
Iraq
... Technical paper about geothermal power resources including drilling wells for heat detection for power plant project and geological nature exploration for this project in Iran, Jordan, Egypt( 2018 ). 12.Technical conference paper participation in ...
- 2022 Jan 22
Amara, Maysan, Iraq
... Machine Mark 9 (Cigarette Maker Operator) A+/97% Philip Morris International (Sahiwal Factory) 2017 Basic Engineering (About Plant and Process Operator) A/82% Philip Morris International (Sahiwal Factory) 2019 G.D.X 2 (Packer Machine Operator) A/80% ...
- 2022 Jan 19
Qatar Jiyan, Erbil, Iraq
... system and power distribution system in gas turbines power generation station in Tunisia * 4 week training on Ammounitrat plant in Chemical complex in Tunisia SYNOPSIS of EXPERIENCE Practical construction professional, with more than 15 years of ...
- 2022 Jan 08
Basra, Iraq
CURRICULUM VITAE Name: Marwan Yaqoob Khalid Marital Status: Married Date & P of B: 01-05-1978 - Basra Address: Manawe-Lejm Basra-Iraq Cell: 077******** Email: adpljc@r.postjobfree.com Skype: marwan_alghanim Education • University.of Basra - Bachelor...
- 2021 Dec 08
Basra, Iraq
... & Piping Hands on exposure to Petroleum & Petrochemical Construction Projects In-depth knowledge & Experience in oil& gas, Power Plant & Petrochemical Projects Strength of technical know –how in Mechanical, Piping, Structural Erection, operation and ...
- 2021 Nov 17
Mosul, Duhok, Iraq
... years of success fulfilling the role as Electrical and computer engineer Superintendent with foxpol energy “baadry 150 MW power plant”,1+yers with “ALTAQA ALNADHIFA” for solar energy system(install and maintenance),2+years with 6 NGO’s with deferent ...
- 2021 Sep 08