|
Resume alert |
Resumes 1 - 10 of 22 |
Paddock Lake, WI, 53168
... Review and approve all Production Part Approval Process (PPAP) documentation for readiness of new production products for all Metals, Plastics, and Optics commodities. Revise and update quality system and procedures and work instructions as ...
- Apr 19
Crystal Lake, IL
... Sinclair Community College Dayton OH 09/94-06/96 Mechanical Engineering CERTIFICATIONS: SPC, 8D, QS9000, ISO13485, FMEA, PPAP, Kaizen, Advance Plastic Injection Mold Design (at University of Wisconsin). GD&T, Stack-up Tolerance Analysis, Plastics ...
- Jan 10
Long Lake, IL, 60041
... Full implementation of APQP, including Control Plans, PFMEAs, MSA, AS9102 First Article/AS 9145 PPAP, real-time SPC, gage calibration, gage design. Extensive application of Total Quality Management (TQM) principles (six sigma, 5S+1, Kaizen, cost of ...
- 2023 Jan 23
Crystal Lake, IL
... Capability to coordinate customer quality requirements includes shipping method, PPAP, Green requirements, critical/non-critical failure analysis timely. And process it through email and/or ERP system. Strength in all internal/external business ...
- 2021 May 20
Mukwonago, WI
... • PPAP, first article, FMEA, risk assessment • Customer service • Internal and external audits Director of Quality Milwaukee Broach: New Berlin WI 2017-2018 • Director of the quality management system and QMS representative • Re wrote the ISO 2009 ...
- 2020 Oct 20
Round Lake, IL
... Fully versed in automotive/ISO/TS/AS and medical device business models and methods (APQP/PPAP/Lean), as well as active participation in supplier quality function. Keen multi-level manager and solid agent of change; high professional standards, ...
- 2020 Sep 16
Lake Villa, IL
... Knowledgeable in areas of FDA 21CFR Part 820, RoHS2/REACH, PPAP, ISO 13485, ISO 14971, ISO 9001, ISO 19011, SDLC/SDM, current Good Manufacturing Practices (cGMP), GD&T and IPC-A-610 Electronics Assembly acceptance. Educational: Massachusetts ...
- 2020 May 27
Woodstock, IL
... Initiate all automotive QS9000 PPAP and Warrant prototype builds for the factory Develop and drive plans to increase factory production capability and improve capability to build various product platforms with little to no changeover time Motorola ...
- 2020 May 26
Wonder Lake, IL
... FMEA-Failure Modes & Effects Analysis (risk assessment and actions) Authored Quality & EMS System policies, Quality Manuals, PPAP documentation, evacuation plans, supplier surveys, procedures, operation/inspection & gauging instructions, etc. ...
- 2019 Jun 23
Lake Geneva, WI, 53147
... individual process improvements needed Analyze shipping/RFID counts Analyze inventory using the RFID system Quality Control/PPAP for automotive customers Mercy Walworth Hospital and Medical Center, Lake Geneva WI February 2012 – May 2015 Emergency ...
- 2018 Sep 18