|
Resume alert |
Resumes 41 - 50 of 70 |
Dayton, OH
... Tools utilized: Run at Rate, Root Cause Analysis using PFMEA (Potential Failure Mode and Effects Analysis), Control Plans, PPAP, Drawing Reviews, Quality Boundary Samples, Process Parameters, Design of Manufacturing, Mistake Proofing LEAN ADVISOR. ...
- 2010 Sep 14
Dayton, OH, 45431
... Working knowledge of SPC, APQP, and PPAP . Understanding of ISO16979, ISO9000 and ISO14001 systems . Developed more than 40 laboratory procedures . Successful in learning and comprehending new systems and methods . Proven ability to work as part of ...
- 2010 Aug 05
Dayton, OH, 45403
... osilloscopes, DVM's, spectrum analyzers, loop calibrators) Team oriented in a fast paced environment Experience with QS9000 Completed introductory training in FMEA, APQP, PPAP, SPC, MSA and TS-16949 Intermediate experience with Windows and Microsoft ...
- 2010 Jun 18
Springboro, OH, 45066
... Faurecia Exhaust Systems (Franklin, Ohio) 2005 - 2008 Program Quality Engineer Prepared qualification documentation for "Big Three" automakers utilizing the Production Parts Approval Process (PPAP). Developed corrective action responses for customer ...
- 2010 Jun 01
Troy, OH, 45373
... Delivery of hands-on quality improvement and process control technical training including PDCA, PFMEA, PPAP, Process Mapping (SIPOC), SPC, COQ, GD&T, PQCT, 5P, and other tools necessary to make continual improvements part of the organizations ...
- 2010 May 18
Springfield, OH, 45504
... ISO 9002 requirements (achieved certification December, 1996) and QS 9000 (achieved certification February, 1998) Developed PPAP planning system including Control Plans, FMEAs, APQP Responsibilities: Managed metallurgical lab and Process Engineering ...
- 2010 May 11
West Milton, OH, 45383
... -Implemented Central Measurement Unit supporting PPAP submissions for six plants. -Tracked new product implementation to assure on time PPAP submissions to customer. -Advised and approved design of injection molded plastic parts. -Supervised tool ...
- 2010 Apr 18
Dayton, OH, 45440
... Directed all aspects of high-volume programs including the design, manufacturing, cost, timing, customer approvals/issues, PPAP (Production Part Approval Process), pre and post production issues, and material cost savings initiatives • Improved the ...
- 2010 Apr 16
New Carlisle, OH, 45344
... PPAP, PFMEA, APQP, 8D problem solving, control plans, capability studies, inspection, manufacturing and test procedures. . ANSI and Mil standards, QS/ISO9000 and Lean Manufacturing . Verbal and written communication with customers, suppliers and all ...
- 2010 Apr 10
Dayton, OH, 45459
... September 2009 - December 2009 Responsible for creating all PPAP paperwork required for part submission. This includes ballooning prints, PFMEA, Flow Charts, Gauging requirements, and Control Plans. The manufacturing environment is CNC machining of ...
- 2010 Apr 09