|
Resume alert |
Resumes 31 - 40 of 52 |
Herriman, UT
... GMP, MRP, MPS Training ? QSR Training REFERENCES: Available upon request
- 2013 Dec 22
Salt Lake City, UT
... • Support the implementation of organizational tools such as Scrap Track System, TPM, Kanban and MRP - Visual Manufacturing. • Implemented "First piece inspection” and "Corrective Action Plan" - decreased the scrap by 3%. • Developed two new ...
- 2013 Dec 11
Salt Lake City, UT
... Ordered all raw materials necessary for the manufacturing of axles using the Material Requirement Planning (MRP) System. . Developed and delivered production schedules to machining and assembly. . Developed and maintained positive relationships with ...
- 2013 Oct 04
Salt Lake City, UT
... Meeting strict deadlines and ordering packaging material using an MRP purchasing system. • Coordinated the return of parts, material exchanges or credit notes, obtained corrective action report from supplier and ensured follow up. • Provided support ...
- 2013 Aug 20
Sandy, UT
... Presented and sold custom enterprise solutions of manufacturing (MRP), Call Center, and e-Commerce to Baxter Pharmaceutical division. Managed pre-sales activities and coordinate implementation of concurrent projects. Each project included staff of 3 ...
- 2013 Feb 28
Sandy, UT
... Knowledgeable in data warehouse design, BI and OLAP tools, ETL methods, ERP, MRP II and CRM software, strategic planning, project and personnel management, product evaluation, CASE/relational/QA/OO methodologies, business systems analysis, OLTP ...
- 2012 Dec 02
Layton, UT, 84041
... I have extensive experience using several different ERP/MRP systems, included but not limited to, Dynamics AX, Fleet Focus, Costpoint, Syteline, ToolTracker, Cribmaster Data Max and others. I was considered a Microsoft Enterprise Business ...
- 2012 Aug 27
Highland, UT
... (Company Worldwide leader on Food Services) Challenges of the job: -Define the Material Requirement plan (MRP) for direct material -Manage purchase order (PO) for direct material -Manage daily relationship with vendor (contracts and claims) - ...
- 2012 Jul 11
Layton, UT, 84041
... Scheduling, process control, inventory control and machine maintenance with strong background in receiving, receiving induction, warehousing, uses of material requirement and planning system(MRP, Topics), Wave solder, test, repair, assembly. ...
- 2011 Aug 28
Magna, UT, 84044
... * Experienced with most MRP and ERP systems, Zero Inventory, JIT, Theory of Constraints, Bottleneck Management and Flow Management. ACCOMPLISHMENTS * Documented record of success and achievement in Safety, Quality, On- Time and, Cost of ...
- 2010 Oct 27