... Preparation of punch list for the balance activities which are not affecting hydro test completion and clear of punch list and post punch list items. Witness of RF Pad Testing / Pneumatic Test (If any). Witness of Air / Water Flushing. Witness of ...
- 2020 Aug 27
Kolkata, West Bengal, India
... PROJECTS Mini Hydro Power Project( Dummy load system):- 200 KW mini hydro power project construction of intake channels, fore-bay tank, preparing layout of power house, commissioning impeller and alternator, connection of HT cables from hydro panel ...
- 2020 Aug 04
Kolkata, West Bengal, India
... Ltd” at Punatsanchhu-1 Hydro Electric Power Project (1200MW) in Wangdue, Bhutan. Duration: October 21, 2016 to till date. 2. As a Site In-charge in “Encardio-Rite Electronics Pvt. Ltd” at And Punatsanchhu-II Hydro Electric Power Project (1020MW) in ...
- 2020 Jul 31
Kolkata, West Bengal, India
... Monitoring Hydro test activities and compliances all documents as per procedure. Recommendation of Third-Party Training and educating employees into a Safe Act. (Excavator, Side Boom operation, Wheel Loader Operation, Vacuumed Lift Operation, Dozer ...
- 2020 Jul 09
Kolkata, West Bengal, India
... Reviewing and verifying completeness of piping test packages (hydro or pneumatic) prior to testing. Reviewing welding summary and NDT report. Witnessing final piping (hydro, pneumatic, service & visual) tests. Preparation of documents required for ...
- 2020 Jun 18
Kolkata, West Bengal, India
... Working with rubber, steel, polyurethane, ceramic & Creston liner product, fabricated non pressure & pressure vessel, pipe line, valve, pump, motor, gear box, hydro cyclone mainly which are used in mines and washery, mineral handling plant, chemical ...
- 2020 Jun 12
Kolkata, West Bengal, India
... ●Fabrication, erection of pipe supports, alignments, ISO clearance, Loop file MC clearances and Hydro testing. ●Involved in pre commissioning activity like steam blowing, Rotomole, Boroscopic. ●On-site small-bore piping fabrication and erection. ...
- 2020 Jun 11
Kolkata, West Bengal, India
... Activities include: Preparation for cleaning and inspection of the pressure parts during Annual Shutdown Cleaning of pressure parts by Hydro jet system Thickness survey of the tubes in various regions of boiler Drum internal inspection Overhauling ...
- 2020 May 30
Hooghly, West Bengal, India
... Successfully completed project of Power Grid Synchronization with 400 KV at Balimela under Orissa Hydro Electric Power Corporation Ltd. With a line Transmission of 30 Km from Power House to Grid. Main equipment installed & commissioned CVT,EHV gang ...
- 2020 May 01
Kolkata, West Bengal, India
... Summer Training at NHPC Kullu (H.P.) on PHEP-II Project Learnt Hydro power Generation system, Various Electromechanical aspects at the power house like Alternator, power transmission and distribution. Industrial Automation: PLC & SCADA Computer ...