*.
IN
INDI
A
MORE THAN ** YEARS IN VARIOUS LIMITED COMPANY & PRIVATEORGANISATIONIN
INDIA FOR EXECUTION/QC DEPARTMENT AS A PIPING & WELDING SUPERVISOR. 2.
IN
GUL
F
01. 10 MONTHS SINCE 26TH MARCH, 2016 AS A PIPING CHARGE-HAND IN PENTAGLOBAL, IMPROVEMENT PROJECT UNDER DALIEM PETROFAC, IN SOHAR REFINERY ATOMAN,
02. AS A PIPING FOREMAN IN SHUTDOWN PROJECT ATQATARPETROLEUMREFINERY UNDER OVERSEAS CONSTRUCTION COMPANY w.e.f 30.01.2018 to 22.03.2018. 03. AS A GENERAL FOREMAN/SUPERVISOR IN DOPET FOR OFFSHORE/ ONSHORE PROJECT, SHUTDOWN, MAINTENANCE & FABRICATION WORKSHOP w.e.f 22.03.2018 to 04.11.2018.
04. AS A GENERAL FOREMAN/SUPERVISOR IN DOPET FOR OFFSHORE/ ONSHORE PROJECT, SHUTDOWN JOB FROM 20.02.2019 TO 20.05.2019. 05. AS A MECHANICAL SUPERVISOR IN OCC FOR SHUTDOWN JOB ATADNOC,ABU DHABI FROM 08.02.2020 TO 08.06.2020.
CURRICULAM VITAE
UJJAL SARKAR
FROM INDIA.
Contact No: What’s IN INDIA: app/ imo no: ++91-947*******, 91-947*******. E-Skype Mail: user ujjwalqc@name: - gmail.ujjwalqc com Objective: Willing to work in a competitive & challenging atmosphere to achieve the Organizational growth, environment & development of the company. Proficiency in monitoring the systems and follow up the procedures to maintain quality, standard of the project and overall discipline within the department.
POSITION APPLIED FOR : MECHANICAL or PIPING SUPERVISOR NET EXPERIENCE : MORE THAN 10 YEARS
WILLING TO WORK : ANY WHERE IN THE WORLD.
LANGUAGE READ WRITE & SPEAK FLUENTLY : ENGLISH, HINDI, and BENGALI. EDUCATION : GRADUATE DIPLOMA IN MECHANICAL ENGG. (2012). Enrollment Number - 20096529.
TECHNICAL QUALIFICATION : A. KNOWING COMPUTER WITH M.S. OFFICE & INTERNET.
B. ASNT LEVEL II IN RT, LPT AND MPT.
OVERALL EXPERIENCE IN PETROCHEMICAL AND REFINERY:- Page 2 of 7
SL.
No. COMPANY CLIENT LOCATION FROM TO DESIGNATION
01. IOTEP IOCL IOCL, PANIPATH JUNE,
2009 FEB, 2011 SITE SUPERVISOR in
EXECUTION
02. IOTEP UHDE, PRAXAIR IOCL, PARADIP APR,
2011 NOV,2012 SITE SUPERVISOR in
EXECUTION
03. KAZSTROY (KSS) FOSTER WHEELER IOCL, PARADIP NOV, 2012 JAN, 2014 SITE SUPERVISOR in
04. PUNJLLOYD LTD TOYO ENGG IOCL, PARADIP JAN, 2014 FEB, 2016 SUPERVISOR EXECUTION in EXECUTION 05. PENTAGLOBAL
LLC
ORPIC,
DALIEM-PETROFAC
ORPIC, SRIP,
OMAN
26th
MARCH,
2016
7th Jan,
2017 PIPING CHARGE-HAND
06. KKS PVT LTDCO GUJARAT REFINERY,
IOCL VADODARA,
GUJARAT APRIL,
2017 16th 2017 OCT,
SUPERVISOR
07. MAHALAXMI & CONST ENGG
COMPANY
PETRON RELIANCE ENGG J3 AT
JAMNAGAR, GUJARAT
18 2017 th OCT,
26 2018 TH JAN,
SUPERVISOR
08. OCC QPR, DOPET
QATAR
PETROLEUM
REFINERY,DOHA
30 TH
JAN,2018
22 ND MAR,
2018 PIPING FOREMAN
09. DOPET Q.G., OXY, QATAR
22 ND
MAR,
2018
04TH NOV,
2018
GENERAL FOREMAN/
SUPERVISOR
10. DOPET QATARGAS, QATAR
20TH
FEB,
2019
20THMAY,
2019
GENERAL FOREMAN/
SUPERVISOR
11. OCC ADNOC ABU DHABI 08TH FEB,
2020 08.06.2020
MECHANICAL
SUPERVISOR
S
L
N
COURSES PERFO
RMED
ON
CONDUCT
ED BY
VALID
UPTO
PROFILE:
Familiar with ASME B31.3, ASME B31.1 Standards, ASME IX and other job related required codes and
standards. Dynamic and Diligent Professional with career exposure and successful execution of more than 10 years in Piping & Petroleum Refinery Projects & Shutdown. Performed with Good understanding of P&ID
Drawings, Piping Layouts, GAD, Spool Sheet etc.
Demonstrated Professional Excellence in Planning, Scheduling, Monitoring, Site Supervision, and
Execution Excellent Communicator of Projects without with Loss exceptional of Time/ analytical, Cost Overruns. People Management, and Co-ordination skills and
the Track ability project to work progress in highly and diverse proactively environments identified with and people rectified from varied technical backgrounds issues thereby and level. ensuring
adherence Anchor and to coordinate delivery within on-site time-activities lines. to ensure smooth work progress and handle documentation
thereby Ensured coordinating adherence to accordingly Safety, Environment with Project and Manager/Health standards engineers, in QC all Engineers, functional and areas Clients. and developed &
implemented Proactively identify measures and for rectify enhancing problems safety to levels. ensure smooth operations and adherence to design and quality parameters.
Total Working Experience For The Last 10 Years :
TRAINED + CERTIFIED CARDS OBTAINED IN QATAR+ABU DHABI Page 3 of 7
O
0
1
.
OFFSHORE TBOSHIET COURSE- (OPITO
APPROVED) -
02-TH 04
APRIL 2018
ENERTECH QATAR
03.022 04.2
0
2
.
H2S/BA (OXY APPROVED) 04.018 04.2
ENERTECH QATAR
03.019 04.2
0
3
.
CONFINED SPACE ENTRY 04.018 04.2
ENERTECH QATAR
03.020 04.2
0
4
.
QP APPROVED- H2S/BA 31.018 01.2
ENERTECH QATAR
30.019 01.2
0
5
.
QP APPROVED- SPACE ENTRY CONFINED
11.018 02.2
ENERTECH QATAR
10.020 02.2
0
6
.
QG SAFETY APPROVED- INDUCTION PLANT
QATARGAS 20.020 05.2
0
7
.
QG APPROVED- HOOD H2S+ESCAPE
QATARGAS 20.020 05.2
0
8
.
QG APPROVED- RULE LIFE SAVING
QATARGAS 20.020 05.2
0
9
.
QG APPROVED- HEIGHT SAFETY AT
QATARGAS 15.021 03.2
1
0
.
QG APPROVED- ANALYSIS JOB (JSA) SAFETY
QATARGAS 12.021 03.2
1
1
.
QG APPROVED- HANDLING MATERIAL
QATARGAS 31.021 03.2
1
2
.
QG APPROVED- AWARNESS HEAT STRESS
QATARGAS 31.019 12.2
1
3
.
PERMIT RECEIVER ABU ADNOC, DHABI
2 YEAR
Over-all Job Activities and Responsibilities performed in EXECUTION for PIPING
& in Mechanical Construction.
GENERAL AWARNESS
Conversant with Client Job Procedure/ Method Statements, Specifications and Client requirements for the job.
Conversant with approved ITPs/QAPs, P & I Diagrams/ Isometrics/GAD/ Spool Sheet etc.
Follow method statements and procedures.
Conversant with Proposed Welding Procedure Specification (PWPS)
Able to demonstrate good organizational skills, following policies, procedures and work practices, and developing improvements where necessary.
Leads and controls the skilled & unskilled workers and work engaged in all activities Page 4 of 7
concerned with the mechanical works aspects of the project.
Abilities to optimize the resources (manpower, equipment and materials) to ensure efficient and timely completion of the works.
Commands respect of my workforce, and develop excellent working relationships with all other department personnel as well as with the client management.
SECONDARY VITALDUTIESANDRESPONSIBILITIES:
Complies with the highest level of safety during all stages of project execution to avoid any type of incidents, and near miss.
Conversant with Site Safety Norms and strictly follow-up the HSE policies by implementing at Site.
Take reasonable care of own health and safety and that of others in the workplace.
Identifies, formulates and implements “on the job” training programs for the workforce under my responsibility.
PRACTICAL KNOWLEDGE IN FABRICATIONANDERECTION
Inspection / Monitoring Fabrication/ Erection work quality in terms of specification, workmanship and other variables as per requirements of QC standard procedure and client’s specification.
Review of Material Test Certificates, Consumable Test Certificates.
To ensure the physical condition of material and verification for identification with Aluminum tags, hard punch, mat code, color code and for damage, if any.
Controlling / Checking Electrode Storing, Baking, Handling, Issue and proper use on Daily Basis. Checking Welders I.D., WPS copy, Portable Oven, Heating Torch, Thermo chalk etc.
Inspection / Monitoring of Fit-up as per Approved Drawing / Construction Drawing / Isometric Drawing & WPS for Correctness of materials, dimensional accuracy and joint design (root gap, root face, bevel angle, cleaning of weld zone, proper support & arrangement for distortion control etc.
Ensure that the all consumable and non-consumable material used for SS fabrication & welding shall be Storage separated and shall not contaminated.
All flange faces to be protect during stacking of spools and materials at site.
Responsible for job distribution to the contractors & Departmental Workers.
Distributed the job among the fitter groups and close monitoring the daily progress.
According to Material availability Plan to complete the job.
Preparation of Isometric Drawing as per site requirements (regarding modification).
Spool fabrication at shop. Fit up inspection & prepare the report.
Preparation of Bill of material.
Piping Support fabrication & Erection according the requirement of the Standard Support Drawings and ISO.
Erection of spools at various elevations according to co-ordinate of the ISO.
Process & utility piping execution.
Coordination with clients/consultants/subcontractors for execution of works.
Resources availability monitoring for better execution.
Making daily, weekly and monthly plan for achieving target.
Supervise the contractors for quality of work and coordination with quality issues. Ensure and submit work progress report time to time. Ensure closing of punch points and mechanical completion. Steam tracing of process piping.
Utilized man power and tools & tackles in proper planning channels.
Mechanical Clearance of the systems.
Page 5 of 7
Attend all the Punch Listed Point (P1) immediately for Mech. Clearance of the Loop.
Box up & System Clearance.
Preparation of Piping Test Loop Package.
Checking for Mechanical Clearance of Piping Test Loop.
Checking for correctness of location and orientation of branches.
Checking for provision of Instrument Tapping vents & drains.
Checking for correctness of type of supports according to support detail drawings.
Checking for correctness of gaskets, fasteners and all other fittings.
Checking for correctness of valves, Steam traps and direction of flow according to drawing.
Final system re-checking for mechanical completeness.
Regular attend and brief the Job scope, area, safety hazards in TBT with the HSE personnel’s and all workers in the presence of Clients Execution and Safety personnel’s.
Maintain Daily Meeting with planning executives for daily progress and weekly progress review meetings with all staff.
Maintain monthly HSE Meetings with HSE representative and Progress Meetings with staffs, RCM.
Responsible for preservation and contamination due to intermixing of carbon steel with stainless steel, flanges raised protection and pipe ends for damage and valves preservation.
HYDROSTATICANDPNEUMATICTESTING
To attend the hydrostatic and pneumatics testing of pipe spools/ system at site.
Ensuring NDT Clearance of Piping Test Loop before Pressure Test / Leak Test.
Checking of correctness of Test arrangements for Pressure Test / Leak Test.
Review of Calibration Certificates of Pressure Gauges.
Preparation of punch list for the balance activities which are not affecting hydro test completion and clear of punch list and post punch list items.
Witness of RF Pad Testing / Pneumatic Test (If any).
Witness of Air / Water Flushing. Witness of Proper Draining of Water & Air drying.
If repairs or modifications / additions are made after the mechanical clearance or during leak test, the affected piping shall be re-inspected and retested and format - (Jobs carried out on mechanically cleared system / sub system) to be filled and signed accordingly.
Check / ensure completion of outstanding / balance punch points.
SHUTDOWN JOB ACTIVITIES
RESPONSIBLE FOR COMPLETION OF THE PRE-PLANNED JOB AT SITE WITHIN A STIPULATED PERIOD AND WITH THE LIMITED RESOURCES AND JUSTIFIED REQUIRED MANPOWER. CLOSE MONITORING & OBSERVATION THE ONGOING JOB TO SAVE TIME, RESOURCES AND NOT PROVIDING UNNECCESSARY OVERTIME TO THE WORKERS. FINISHED THE JOB IN PERFECT WAY, WELL PLANNED MANNER WITH FOLLOWING HIGHEST SAFE WORKING ENVIRONMENT TO SAVE COMPANYS REPUTATION, LOSS OF TIME & COST CONTROL.
01. AIR FIN COOLER: - REMOVING THE PLUGS, CLEANING THE TUBES, PLUG INSTALATIONANDHYDROSTATIC TESTING COMPLETION.
02. DRUM AND VESSEL: - OPENING AND CLEANING THE INSIDE SURFACE, QC APPROVAL RECEIVING AND Page 6 of 7
Academi c
Qualifica tion
Institute/ University
Year of
Passi ng
GRA DE
DIPLOMA IN MECH.
ENGG. PUTLIBY INSTITUTE OF MANAGEMENT SCIENCE AND RESEARCH, DELHI 2012 B+ 12th WEST BENGAL COUNCIL FOR HIGHER EDUCATION 1992 P 10th WEST BENGAL BOARD OF SECONDARY EDUCATION 1990 IInd CLOSING THE SAME EQUIPMENT.
03. MECHANICAL ISOLATION: - ISOLATE ALL THE VALVES AND SUBORDINATE SPOOLS AND AFTER COMPLETION OF JOB REGULATE THE EQUIPMENT (BLINDING AND DE-BLINDING OF SPADE). 04. HEATEXCHANGER:- AFTER REMOVING OF TUBE BUNDLE CLEANING OF INSIDE SURFACE AND ALL OTHER COMPONENTS, RE ASSEMBLING OF COMPONENTS AND HYDROTESTING. 05. PIPING SPOOLS REMOVING: - REPLACEMENT OF OLD SPOOLS AND SENDING THEM FOR PROPER STORAGE. INSTALL OF NEW SPOOLS AND CONNECT WITH FITTINGS. 06. FURNACE: - REMOVING OF BURNERS, CLEANING OF RADIANT AND CONVECTION SECTION INSIDE CELL. CLEANING OF ALL TUBES IN FURNACE. HYDROSTATICTESTINGOFTUBES&PIPING. RE INSTALLATIONOF BURNERS AND COVER AFTER GETTING FINAL CLEARANCE FROM CLIENTS. 07. VALVEREMOVINGANDRE-INSTALLATION:- REMOVING OF VALVES IN UNIT BASIS WITH IDENTIFYING ITS TAGNO,SIZE & TYPE. BEFORE REMOVING SAFE MECHANICAL ISOLATION IS MANDATORY. SENDING THE VALVEWITHTHEHELPOFRIGGINGSECTIONTOWORKSHOPANDAFTERCOMPLETIONOF INSPETION & MAINTANENCE RE INSTALLING THE VALVES&SUBORDINATE EQUIPMENTS. PERSONAL DATA: UJJAL SARKAR
Date of Birth : 30th May, 1974
Permanent Address : Vill Natan C/o Mr. Manabendra Kalipur, Nabab Kumar Road, Saha, P.O Bhatjangla, Krishnanagar, PIN 741102. Dist Nadia, West Bengal.
PASSPORT New Passport Detail No. : ISSUED FROM KOLKATA. T7802332. Date Date of of Issue Expiry 01.31.08.07.2019. 2029. Old Passport No. L2035191.
Page 7 of 7
LAST OTHERS SALARY BENEFIT WITHDRAWN : : AED Over 3000. Time + Free Food + Accommodation + Medical
EXPECTED SALARY : p.m. (negotiable) DECLARATION
I hereby declare that the above information furnished is true up to the best of my knowledge and belief.
DATE : 24.08.2020. UJJAL SARKAR
PLACE : KOPARKHAIRNE,MUMBAI.