Brentwood, CA, 94513
... Towne Place Suites • Underground On-site and Off-Site • Footings, Foundation and Embeds • Sewer Lines, Strom and Roof Drains, Plumbing • Concrete • Framing Fire Wall, Separation Walls, Elevator Shaft, Stair Wells • City of Sacramento Inspection. ...
- Apr 14
Atlanta, GA
Dominique McGriff 347-***-**** ad4z2c@r.postjobfree.com WORK EXPERIENCE Schindler - Atl, GA Oct 2021- Present Customer service representative/emailing team Description: Receive requests for elevator and/ or escalator service from Schindler customer ...
- Apr 14
Jaipur, Rajasthan, India
... Flax,Dry Chlorine, Hydrogen Gas, Boiler10t/cm2, Chlorine,Steam Piping, Cell House, Flaking Unit, WTP, DM, Floating Tanks for Hydrogen Gas, Reactors, Brine Filtration, Belt Conveyors, Bucket Elevator, Vacuum Drum Filter, ETP, Chlorine Bottling,heavy ...
- Apr 14
Al Dafna, Qatar
... ●Column shutter fabrication Doka ●Elevator wall shutter fabricator Doka. Table form Doka slab fabrication. ●Mason work plaster and tile fixing work, interlock, paving. ●Hydraulic Doka system and concreting works. ADDITIONAL WORK EXPERIENCE: ●Masonry ...
- Apr 13
Chicago, IL
... Checking fire panel and elevator for great working service. Logging in daily reports . Buzzing in and out people who do not have access, using access-it system to make key cards and input parking passes. Homemaker Illinois Department of Human ...
- Apr 11
Rewari, Haryana, India
... Working at Carbon Continental India Pvt .LTD as Executive (Mechanical Maintenance) from 11th Nov 2017 To Till Date Responsibilities: Maintenance of all rotating & static equipment like Screw compressor, Centrifugal blower, Fan, Elevator, Screw ...
- Apr 11
Manhattan, NY, 10019
... Freight Elevator operations; Fire Safety Station procedures. EDUCATION: The Art Institutes of Portland Portland, OR A.A., Multi-Media & Web Design 2002 Lewis & Clark College Portland, OR B.A., Sociology & Anthropology 1993
- Apr 11
Carrollton, GA, 30116
... I also supervised the electrical and controls for an Elevator instillation totaling $1 million, new 4160 volt Switchgear install $1 million, a Main Transformer install $500,000 etc. Involved also were office upgrades, ARC Flash doors to existing ...
- Apr 11
Surat, Gujarat, India
... Project & Maintenance in Electrical Department.Electrical installation & project of 11 kv, Transformer1600 kva,P.C.C/ M.C.C and Crane,Elevator,Magnetic Conveyor and other Machines. From : 30 September 2023 To Till date. G.F.L -2 ( Jolva Plant ) ...
- Apr 11
Centro, Madrid, 28012, Spain
... desactivar la comunicacion toxica.pdf, Linkedin_Como desarrollar la inteligencia emocional.pdf, Linkedin_Como desarrollar tu elevator pitch.pdf, Linkedin_Como elaborar un plan de comunicacion.pdf, Linkedin_Como gestionar equipos de trabajo.pdf, ...
- Apr 11