|
Resume alert |
Resumes 11 - 16 of 16 |
Manama, Bahrain
... balancing, alignment correction and solving critical plant problems in most of the cement plant ID/FD/ESP/cement mill/ coal mill / Pre-heater fans using portable vibration analyzers like IRD 350,838,880,Datapak, FAST TRACK,IRD 890 CSI 2115 etc. ...
- 2019 Nov 25
Khobar, Eastern Province, Saudi Arabia
... Mitsubishi Corporation - (March 20, 2005~December 14, 2006) 2 x 717 MW Coal-Fired Power Plant Project Map Ta Phut, Rayong 21150, Thailand Material Control & Inventory Supervisor Mitsubishi Heavy Industries Ltd.- (July 17, 1999 ~ Dec. 31, 2002) 4 x ...
- 2019 Sep 24
Dammam, Eastern Province, Saudi Arabia
... With a strong background in the following industrial plant process unit operation and system such as: Coal Fired Lime stone Kiln for production of CaCo3 and Co2. High Pressure Gas Compression Unit (Centrifugal and Screw compressors) Distillation ...
- 2019 Jan 25
Manama, Capital Governorate, Bahrain
... system of substation-Deluge system / Over head power lines Transmission and Distribution / Oil and Gas, Thermal power plant (Coal and Gas based), Chimney construction –oil and Gas - /Electrification work inside projects / Bridge Construction project ...
- 2018 Aug 25
Manama, Capital Governorate, Bahrain
... o S2 Coal Plant Fiber Optic Terminations at Holcim – Bacnotan, La Union o AB Power Monitor 3000 at Holcim – Bacnotan, La Union TRAININGS/SEMINARS/CONFERENCE ATTENDED Project Management Trainings o Project Management and Cost Control, BIBF – Bahrain, ...
- 2017 Jun 19
AL KHOBER, Saudi Arabia
... Cold pipeline insulation by thermo coal. Hot insulation of flue gas duct by using LRB (Light Resin Bonded) Mattress of thickness 40mm, 60mm, 120mm.) G.I Sheet cladding after hot insulation. Invading the require insulation material from company. ...
- 2012 Jun 17