Post Job Free

Turbine resumes in Bakersfield, CA

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 1 - 10 of 14

Technician Iii Wind Turbine

Bakersfield, CA
PROFESSIONAL SUMMARY Seasoned Wind Turbine Technician III from Wanzek Construction with a proven track record in enhancing turbine performance and emergency response planning. Adept at schematics reading and critical thinking, I've saved over $100k ... - Mar 20

Plant Operator Mechanic 2

Bakersfield, CA, 93301
... Hp turbine changeouts. Compressor blade and hp/lp turbine changeout and balancing. Accessory gearbox swaps. Instrumentation/ pipe replacement. Canister production Tech Air Liquide - Fremont, CA January 2021 to September 2022 Canister assembly for ... - Feb 08

Gas Turbine Tech

Bakersfield, CA
... to the shafts and trained to identify and assess damages on the mid shaft forward shaft and aft shafts Reassembled turbine and involved in engine test runs Mining 01/2014 to 03/2014 United Labor Group – Cupertino, CA Work completed at Lehigh ... - 2020 Dec 02

Electrical Engineer

Bakersfield, CA
... 2013 to 02/2014 Processes Unlimited International, Inc – Bakersfield, California, USA Creating, modifying and upgrading electrical, instrumentation and control systems design for oil and gas fields and gas and steam turbine electrical power plants. ... - 2014 Dec 23

Project Manager Engineer

Bakersfield, CA
... One turbine compressor and four Motors. These compressors will supply utilities air for the whole plant. EDUCATION AND QUALIFICATIONS 2012 Master of Business Administration in Operation Management Baytown University 1989 Mechanical Engineering ... - 2014 Jul 17

Power Plant Quality Control

Bakersfield, CA
... Experienced with the design of severe service control valve in many critical applications such as: turbine bypasses, start-up and Feed water regulator, super-heater bypasses and Desuperheater . Experienced with PFD and P&ID. Experienced with food ... - 2014 May 29

Project Manager Construction

Bakersfield, CA, 93308
... Project was new construction of an 84Mw plant consisting of 2 Aero Derivative LM 6000 Gas Turbine packages complete with chilling and balance of plant located in Manaus, Brazil. This was a fast track project under emergency status declared by the ... - 2013 Jul 17

Plant Maintenance

Bakersfield, CA, 93301
... n Stewart & Stevenson turbine package includes a general electric LM 5000 aero derivative gas turbine generator with STIG applications utilizing a Brush electrical generator. Balance of plant operating equipment contains a Emerson Ovation DCS ... - 2013 May 07

Customer Service High School

Bakersfield, CA
... 93561) Temporary Associate/ Wind Turbine Technician- Tehachapi, CA 93561- Temporary position (6)mo., Company relocated back to Texas. (2004-2010) In home child care. (2011-2011) Foster= Wheeler perryville corporate park, clinton,N.J. 08809-4000 908- ... - 2013 Feb 06

Training Management

Bakersfield, CA, 93304
... • Bakersfield, CA • *3304 Home: 661-***-****, Cell: 619-***-****, abghen@r.postjobfree.com QUALIFICATIONS SUMMARY Accomplished on job training and experience in the US Navy as a Gas Turbine Systems Mechanic Technician with six years of progressively ... - 2012 Dec 04
1 2 Next