HERMAN D. CURRY
864-***-**** adia06@r.postjobfree.com
WORK HISTORY
Senior Technician 03/2014 to 03/2020
CAMS – Bakersfield, CA
Inspecting LM5000 & LM2500 Gas turbines at various power plants in the U.S.
Rebuilding rotors (blade plotting and balancing)
Troubleshooting and boroscoping Gas turbines
Removing and installing the engine, TMF, LPC and HPC to casing
Disassembling and reassembling the engine as well as identifying all bearings and air seals
Plant startups and shutdowns including hot starts
Knowledgeable in plant maintenance (valves and motors)
Knowledgeable in control systems
Prepare daily site reports and weekly summary reports using MS Word
Traveled to New Zealand to provide extensive training on LM2500 and LM5000 gas turbines
Disassembling turbines completely to the shafts and trained to identify and assess damages on the mid shaft forward shaft and aft shafts
Reassembled turbine and involved in engine test runs Mining 01/2014 to 03/2014
United Labor Group – Cupertino, CA
Work completed at Lehigh Hilburton Cement Mine
Rigging and removing conveyors to be rebuilt
Removed and replaced shakers, layers and buckets
Removed and replaced gearboxes and valves
Heat Treater/Tracer 10/2013 to 11/2013
Trillium Construction/Superheat – Robinson, IL
Provided heat treatment to 3/4” – 20” piping
Control heat distribution using thermostat and manual controls
Heat treatment using gas furnaces
Heat treatment and heat stress welds to ensure welding leads meet customer specifications and hold pressure once applied
Installed ceramic tiles on piping and heat piping 800 - 1220 based on customers specifications
Turbine Millwright 05/2013 to 05/2013
Advantage Resourcing – Houston, TX
Inspection of hot gas section on Siemens Westinghouse 501 gas turbine
Removed and replaced pressure safety valve
Tensioned bolts using Hytorc Hydraulic Tensioners up to 3500psi
Removed and replaced turbine blades, buckets and cans
Work completed at Lyondell Bassell Refinery
Mechanic 09/2012 to 05/2013
Strom Aviation – Greenville, SC
Removed and replaced landing gears, flaps, and hydraulic lines
Removed and replaced fuel pressure safety valve
Removed and replaced engines and engine components on Customs Border Patrol P-3 Orion Aircraft
Removed and replaced ailerons, floor boards, lavatories, and cockpit seats
Assisted in rigging flight controls
Gas Turbine Mechanic 02/2000 to 04/2011
General Electric – Greenville, SC
Built gas turbines from start to finish. Including, stacking, aligning, drilling and doweling units. Assisted in test firing all units
Instrument and Control Technician (I & C); Inspected units throughout assembly and disassembly process
Tensioned bolts horizontally and vertically using Hytorc and ITH Hydraulic Tensioners
Installed and pressure tested safety valve and gas turbines
Installed and pressure tested pneumatic, oil and high pressure relief valves, direct load safety valves, pilot operated safety valves, and power actuated safety relief valves
Used drawings to determine correct pressure required for bolt sizes 3/4” – 3” up to 4000psi
Installed rotor, set mag pickups, install spark plugs, set A-sat and float on 7E(85 mw, 7F(170 mw), 9E(100 mw), and 9F(190 mw) turbines
Performed power generator distribution techniques and maintenance procedures
Participated in extensive training on gas and dual fuel turbines. Knowledgeable of conduit, tubing, and wiring diagrams on all units
Knowledgeable in gearboxes, drive shafts, pump and compressor assembly, and thrust bearings
A&P Mechanic 06/1999 to 01/2000
Lockheed Martin – Greenville, SC
Installed rudder flaps and flight controls on P-3 Orion Aircrafts
Removed and replaced engines and engine parts
Performed maintenance checks on DC-9 aircraft and replaced landing gear components A&P Mechanic 03/1998 to 05/1999
Strom Aviation (Dee Howard) – San Antonio, TX
Performed various duties on DC 10,737-200 and 300 series, and 767
Removed and installed engine components, rigged flaps, transmissions, lavatories and galleys
Installed seats and partitions. Removed and replaced rudders and jack screws
Rebuilt engines and installed pistons, lifters valve, etc.
Assisted in troubleshooting Cessna and Piper Aircraft. Performed engine run – ups A&P Mechanic 08/1997 to 02/1998
Strom Aviation (Textron Lycoming) - Williamsport, PA
Removed and installed engine components, rigged flaps, transmissions, lavatories and galleys
Performed various tasks and tests on DC 10,737-200 and 300 series, and 767
Installed seats and partitions. Removed and replaced rudders and jack screws
Rebuilt engines and installed pistons, lifters valve, etc.
Assisted in troubleshooting Cessna and Piper Aircraft. Performed engine run – ups A&P Mechanic 10/1996 to 6/1997
Pemco Aerospace – Birmingham, AL
Removed and installed various engine components on KC-135
Installed flaps and rig ailerons
Removed and installed transmissions and service hydraulic systems. Performed maintenance checks
Corporal – E4- Helicopter Mechanic 10/1992 to 09/1996 United States Marine Corps
Crew chief on CH-53 helicopters
Performed other duties as required
Removed and installed transmissions, engine components, anti-skid systems, and services hydraulic systems
Assisted in rigging flight controls
EDUCATION
High School Diploma - A.H. Parker High School – 1992 CERTIFICATIONS
MHSA 48 Certification
Basic Plus Card
TWIC Card
OSHA – 10 Hour Construction