|
Resume alert |
Resumes 81 - 90 of 138 |
Toronto, ON, Canada
... Process modification design and cost evaluation on projects such as stack heat recovery, heat exchanger/recuperator/economizer design, waste methane recovery and use for heat and steam production, and steam and boiler optimization 19. Prepared ...
- 2015 Apr 10
Toronto, ON, Canada
... of the plant operation during the shift • Supervised start-up, synchronizing, loading rates and shutdown of the boiler (144 bar & 560 tph), turbine (210 MW) and plant auxiliaries • In case of tripping’s and other major faults investigated ...
- 2015 Mar 31
Mississauga, ON, Canada
... INDIA IAEC Boilers Ltd is India’s top Boiler manufacturer for process and power industries. As an EPCM supplier of Boilers, managed middle size projects of $ 10 millions. (2) 16 TPH x 24 kg/cm2 @ 320 C, (4) 24 TPH x 36 kg/cm2 @ 400 C, (6) 12 TPH x ...
- 2015 Mar 20
Toronto, ON, Canada
... Boiler, Chiller and make-up system designs for high-rise residential as well as commercial buildings. Monitored and adjusted production processes or equipment for quality and productivity. Designed and supervised Mechanical system for “IELTS Test ...
- 2015 Mar 03
Toronto, ON, Canada
... Field installation supervision (Mechanical Engineer Shenyang Boiler Manufacture Group. Co., Shenyang, China Jan.1990- Jan.1997 . Calculated & generated design specifications for boiler thermal & mechanical design . Generated specification for ...
- 2014 Nov 18
Mississauga, ON, Canada
... and to monitor such computerized systems effectively Maintaining boiler log-book regularly and maintaining hourly logs To check gauge glass, operating of safety valve (try lever test), low water cut-off, high water cut-off, continuous and ...
- 2014 Sep 11
Brampton, ON, Canada
... Co-coordinating vessel permits for installation and design registration with provincial boiler authority on behalf of Worley Parson design engineering dept. in Toronto. Melloy Industrial Services Ltd. Methanex Facility, Medicine Hat, AB February ...
- 2014 Sep 09
Toronto, ON, Canada
... Troubleshooting of Boiler, Chiller, Furnace, Heat pumps and Programmable Thermostats. Complete understanding of ventilation system, including fans, dampers, filters, CAV and VAV system. Knowledge of Ontario building codes relevant to heating, ...
- 2014 Aug 05
Toronto, ON, Canada
... double head,10, 6, 2 cavity for produce 1,2,4,10,20,50 & 200 lit re bottle & gallon with control parizon, leak tester, I ML systems ) produce totally 15000 u/day - Familiar with PUMP, GEAR BOX, STEAM BOILER, POWER GENERATOR, CHILLER, E LEVATORS . ...
- 2014 Jun 15
Toronto, ON, Canada
... plant, cooling towers, fire alarm systems Class I V (Power) Engineer J anua ry 2003 – October 2004 Alamo Linen Rentals Ltd, Toronto, ON • Cleaver Brooks, Model – 5 High Pressure Steam Plant Operation and maintenance of Boiler, feed pump, F.D. ...
- 2014 Jun 02