|
Resume alert |
Resumes 51 - 60 of 195 |
Katy, TX
... of welding activities, develop welding Engineering execution plan, selection of consumables and equipment, prepare WPS, run PQR, liaise with customers, coordinate with other internal functions • Technical welding support to Rig technology facility. ...
- 2020 Oct 05
Katy, TX
... Rig Site Technical & Operation Support 4. Drilling Fluid & Cement Design Expert 5. Well Integrity Expert 6. Fit for purpose Well Head Design 7. OCTG Advance Casing Design Expert 8. Risk Assessment Well Planning & Operations 9. P&A Program & ...
- 2020 Sep 29
Tomball, TX, 77377
... Equipment and Technology skills Rig Office, Oracle, Microsoft Word, Excel, Glovia, Team Center, PeopleSoft 8.0 and 8.4, Microsoft Office Outlook, Internet Explorer, SAP
- 2020 Sep 17
Cypress, TX
... EXPERIENCE Spartan Offshore Drilling, Slidell LA — Motorman February 2010 - December 2019 Working with oil rig drillers I performed maintenance & small repairs on drilling equipment. ● Daily inspections of equipment to ensure that there were no ...
- 2020 Aug 04
Katy, TX
... (Hydraulic Institute) 2014 HSE Rig Pass/HUET Mets Model. 2013 Next Generation Control Air Cooled (Gen3, Gen3E, Gen4). (Siemens) 2013 Certified Electrical Generator System Technician (EGSA/FSU) 2008 Power Control System for Emergency Gears 2008 ...
- 2020 Aug 04
Magnolia, TX
... FMEA, RCMA) Front End Engineering Design Engineering Specification Significant Accomplishments: During tenure in Valaris Reliability and Maintenance significantly reduced companywide rig downtime by 50% on Floating Rigs and by 20% on Jack-up Rigs. ...
- 2020 Aug 01
Katy, TX
... Maintain close relationship with the client as the face of the company at the rig site and provide accurate solutions. Highly trained and experienced on all aspects of the drilling process (Well Planning, BHA Design, drilling optimization techniques ...
- 2020 Jul 10
Katy, TX
... Worked on integration using Oracle 12c middleware for Oracle EBS R12 - Rig Project/Rig Budget (home grown applications)- Oracle Primavera - InProgress (home grown application) for syncing WBS structure including Projects, Activities, Steps, Resource ...
- 2020 Jun 30
Katy, TX
... Associate Editor International Association of Drilling Contractors March 2018 to August 2018 While working for IADC’s Drilling Contractor magazine, I wrote articles on drilling rig technology, the global rig market outlook, and safety and training. ...
- 2020 Jun 28
Bellville, TX, 77418
... • Direct daily supervision of all rig operations, procurement, cost tracking and logistics. • Well design, AFE cost generation and Drilling Program preparation. • Coordinate all state and federal regulatory filings and permits. • Post project cost ...
- 2020 Jun 23