|
Resume alert |
Resumes 51 - 60 of 63 |
Jaipur, Rajasthan, India
... WORKING EXPERIENCE Worked As a DCS Engineer At IND-BARATH ENERGIES (THOOTHUKKUDI) LIMITED For the period of May 2015 To July 2016.(1 * 25 MW) Worked as a ASST.Engineer DCS & TURBINE AUXILIARY At TRISHUL ELECTRIC POWERGEN LIMITED For the period of ...
- 2018 Jun 15
Jaipur, RJ, India
... Knowledge of production related documentation and Mechanical principal& efficiency of Engine,Bearings,gears and mechanical pumps & Steam Turbine. Extra Activities & Achievement:- ●Coordinator of Technical Festival in College. ●Willingly donated ...
- 2018 May 05
Jaipur, RJ, India
... 3x18MW Multi Stages, multi Bleed cum extraction condensing Turbine set make Shin Nippon Machinery Ltd Japan. with three controlled extractions (Bleed) for HPH, Deaerator and LPH. 3x18MW/0.85PF water cooled Generator make T D Power system ltd. ...
- 2018 Apr 18
Jaipur, RJ, India
... Where I gain Operational and Maintenance knowledge in Boiler, Turbine, and its Auxiliaries of 220MW thermal power plant. Here I have also completed TWO weeks simulator training running on DAS manufactured by Simmons. COMPUTER PROFICIENCY 220MW ...
- 2017 Nov 14
Jaipur, RJ, India
... MEW/C/4010- 2009/2010 Combined Cycle Gas Turbine Project at Sabiya Power Station Radiography, UT/MT & PT 2010 - 2011 KOC/Snamprogetti/Kharafi National KOC Contract No. 37472 Building new Booster Station BS-160 at KOC Construction of Pipelines of ...
- 2017 Nov 02
Jaipur, RJ, India
... 03/2014- 04/2014 Industrial Visits LM Wind Power Group, Jupitervej 6, 6000 Kolding, Denmark - Overseeing the Design, Manufacturing, Quality control and inspection of Wind Turbine rotor blades and studied influencing factors such as materials, ...
- 2017 Jul 09
Jaipur, RJ, India
... 2014 Jodhpur National University 62.46 1st PRACTICAL TRAINING: Diesel Locomotive shed, Ajmer Duration:- 30 days PROJECT: Title:- Tesla Turbine Description:- It is bladeless turbine and it is increasing the efficiency and power of the turbine. ...
- 2017 Jun 22
Jaipur, RJ, 302001, India
... Independently performed Pre-commissioning activities for GE Make, Frame 9FA gas turbine such as charging of H2 gas in Generator, CO2 concentration test, Lube & Lift oil commissioning, IGV Calibration and Turbine water washing. Successfully completed ...
- 2017 Feb 17
Jaipur, RJ, 302001, India
... Gas turbine and power plant. Marine I.C Engines. Marine Auxiliary Machinery. Ship Construction. ACADEMIC PROFICIENCY Ships basic knowledge form Ship in Campus. Basic knowledge of marine parts drawing. Basic knowledge of all types of welding. HOBBIES ...
- 2016 Oct 04
Jaipur, RJ, 302001, India
... I am also experienced in STP – SUBMERSIBLE TURBINE PUMPS and ATG – AUTOMATIC TANK GAUGING Presently, i am performing the whole electrical, electronic, hydrolic department duties of current General Energy Management Systems Pvt. Ltd. l having ...
- 2016 Mar 15