Post Job Free

Turbine or Wind resumes in Ashburn, VA, 20149

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 111 - 120 of 204

High School Mechanical

Ashburn, VA
... Board in 2005 INDUSTRIAL TRAINING Akansha Automobile Moradabad on GEAR BOX BHEL Haridwar on STEAM TURBINE Company Duration Topic Learning Outcome Name Maintenance of Akansha gear box, brake Knowledge about gear Auto and engine. box, brake, wheel ... - 2015 Jan 15

Engineer Mechanical Engineering

Silver Spring, MD
... Assisted in the computer simulation of fluid designs using FLUENT and GRIDGEN, and sub-sonic wind tunnel demonstration . Responsible for numerical and computational research in the aero dynamics laboratory . Designed the experimental system for flow ... - 2014 Nov 19

Customer Service Engineer

Herndon, VA
... Like Split casing pump, Stage casing pumps, End suction pumps, Double stage casing pumps and Turbine pumps I had done pumps assembly of these pump product In foundry section I had follow up the melting process, machining of assemble parts of pumps ... - 2014 Nov 16

Project Customer

McLean, VA
... As a result, many orders that should be placed through the Rapid Delivery platform wind up going through more complex and inefficient legacy systems. To ensure that as many customers as possible take advantage of Verizon’s Rapid Delivery, our teams ... - 2014 Nov 11

Power Plant Engineer

Arlington, VA
... - Power Plant Technology, Water Treatment, Sewage Treat, Gasoil System, Drainage System,Storm Water, Sewage Network, Water, Plumbing, pumps,valves, firefighting, Heating, Ventilation, Air Conditioning,Steam turbine, Heating and air conditioning. - ... - 2014 Nov 05

Planning Manager

Ashburn, VA
... procedures and, indicators station (120MW Gas Turbine) Location • Anywhere • Coordination between different • Expertise in tendering- activities/partners Rate contract management- • Depends on the country and project execution- the type of contract. ... - 2014 Oct 23

Power Plant Engineer

Fairfax, VA
... Forklifts, Yard Cranes, Wharf Cranes, Generators, Buses and Yard Trucks 4/1995 – 11/1995 Westinghouse Power Generation Plant Houston, TX Turbine Steam Engine Shop Mechanic • Diagnose and Repair Power Generation Steam Turbine and Gas Turbine Engines. ... - 2014 Oct 20

Project Engineering

Ashburn, VA
... Won second prize in intra level project expo on Vertical axis wind mill at Sree Sowdambika College of Engg, Aruppukottai in Sep, 2013. Presented a paper titled Modern energy saving stabilizer using microcontroller in one day national conference on ... - 2014 Oct 16

Thermal Power Engineering

Chevy Chase, MD
... DYNAMIC CONTROL OF WIND ENERGY CONVERSION SYSTEM (SPRING 2012) - The project was a dynamic wind conversion system which would produce maximum power by sensing variation in wind speed. The generator was a permanent magnet synchronous generator. - ... - 2014 Sep 27

Power Plant Operator

Ashburn, VA
... Experience in operation&maintenance (O&M) of1x30MW Siemens turbine in jsw steel ltd. . Experience in Erection& commissioning of 2x45MW Siemens Turbine in Bajaj energy90 MW. . Operational Experience in handling different Turbines like1x30MW, 2x45MW ... - 2014 Sep 25
Previous 9 10 11 12 13 14 15 Next