Phone : 078*******/079*******
Email : *********@*****.***
Yazan Na'em Abu Salem
Personal
Information Marital status : Single
Nationality : Jordanian
Place of birth: zarqa - Jordan
Date of birth : 22 -October -1989
Objective Develop and search for a better ways to increase
the productivity efficiency with keeping the best
quality.
Education B.Sc. Degree in "Mechanical Engineering" from
Al-Balqa' Applied
University / Faculty of Engineering Technology.
Place: Amman/Jordan, Graduation Year: January /
2012,
High School Degree "Scientific" from of Ibn
al-Athir School
Place: zarqa /Jordan, Year: Jul / 2007,
Other courses and
skills.
- Power Plant Technology, Water Treatment, Sewage
Treat, Gasoil System, Drainage System,Storm
Water, Sewage Network, Water, Plumbing, pumps,valves, firefighting, Heating, Ventilation, Air
Conditioning,Steam turbine, Heating and air
conditioning.
- dealt with several types of pipes Such as :-
(HDPE,UPP, PVC,PPR.GRP,GRE,FRP,FCCP,RC, ductile
Iron,Stainless Steel, Carbon Steel(seam,
Seamless),High Pressure Pipe (P16,P22,P91) Lined
Pipe ''PTFE,PVDF'',Copper, Galvanized Steel, VC,etc
-Pneumatic and Hydraulic System, Hydraulic
machines,
Internal Combustion Engines, Mechanical Design,
Strength of Materials, Fluid mechanics,
Thermo-dynamics, Energy Conversion, Machine
Components and Mechanisms (Theory of Machines),
Electrical circuits, All courses with labs.
With AutoCAD course.
MS Office (very good).
Languages English language:
Reading and Writing: Very good
Speaking: Very good
Work experience
ASsociated TRAnstech Contracting CO.(ASTRACO)
"Mechanical Technician"(June 2010 to September
2010)
- Samra Combined Cycle Phase 3
. Power Station,Gas turbine, Boiler and Steam
Generation,
Stack, Pipe insulation, coordination for Hydro
test, flushing and air blowing.
MAG Engineering & Contracting Co.
Site Engineer. ( January 2013 to MAY 2013)
- SAMRA FAST TRACK PROJECT
Organization the mobilization plan for equipment
and employ to the project of sample cycle gas
turbine supply by ALSTOM, my duty is to coordinate
all mechanical actives on site (Gas turbine
alignment, exhaust system and air intake), Follow
up all the technical producer and project
requirement and make sure the site engineers are
applying it.
Participated maintaining quality systems, Time
schedule and construction for the following
activities:
Gas turbine : Piping (Small and Large bore)
Supervision of construction work for C.S, S.S.
ASsociated TRAnstech Contracting CO.(ASTRACO)
piping Engineer (May 2013 to present)
- Power Plant IPP3 Jordan
- Samra Combined Cycle Phase 3
Participated maintaining quality systems, Time
schedule and construction for the following
activities:
Two HRSG (Steam Boilers) Piping (Small and Large
bore) Supervision of construction work for C.S, S.S
and Allow material (P91, P22 & P11), Participated
in arrangement & coordination for Hydro test,
flushing and steam blowing activities for the power
plant after completion of construction work.
Certificate of participation in the "speed control
AC motors," in the Jordan Engineers Association _
the Scientific Committee of the Mechanical
Engineering Division.
Personal skill
- Focused and goal driven professional with experience managing
operations, working in teams, profits and organizational improvements.
Successful track record of progressive experience based on exceptional
organizational and analytical skills and demonstrated commitment to company
goals. Known for innovation and lateral thinking skills with a consistent
record of success in solving diverse business problems. Confident and
poised in interactions with individuals at all levels. Holds high personal
standards and consistently leads teams to achieve high levels of success.
Superior communication and negotiation skills.