Post Job Free
Sign in

Power Plant Engineer

Location:
Arlington, VA
Posted:
November 05, 2014

Contact this candidate

Resume:

Phone : 078*******/079*******

Email : *********@*****.***

Yazan Na'em Abu Salem

Personal

Information Marital status : Single

Nationality : Jordanian

Place of birth: zarqa - Jordan

Date of birth : 22 -October -1989

Objective Develop and search for a better ways to increase

the productivity efficiency with keeping the best

quality.

Education B.Sc. Degree in "Mechanical Engineering" from

Al-Balqa' Applied

University / Faculty of Engineering Technology.

Place: Amman/Jordan, Graduation Year: January /

2012,

High School Degree "Scientific" from of Ibn

al-Athir School

Place: zarqa /Jordan, Year: Jul / 2007,

Other courses and

skills.

- Power Plant Technology, Water Treatment, Sewage

Treat, Gasoil System, Drainage System,Storm

Water, Sewage Network, Water, Plumbing, pumps,valves, firefighting, Heating, Ventilation, Air

Conditioning,Steam turbine, Heating and air

conditioning.

- dealt with several types of pipes Such as :-

(HDPE,UPP, PVC,PPR.GRP,GRE,FRP,FCCP,RC, ductile

Iron,Stainless Steel, Carbon Steel(seam,

Seamless),High Pressure Pipe (P16,P22,P91) Lined

Pipe ''PTFE,PVDF'',Copper, Galvanized Steel, VC,etc

-Pneumatic and Hydraulic System, Hydraulic

machines,

Internal Combustion Engines, Mechanical Design,

Strength of Materials, Fluid mechanics,

Thermo-dynamics, Energy Conversion, Machine

Components and Mechanisms (Theory of Machines),

Electrical circuits, All courses with labs.

With AutoCAD course.

MS Office (very good).

Languages English language:

Reading and Writing: Very good

Speaking: Very good

Work experience

ASsociated TRAnstech Contracting CO.(ASTRACO)

"Mechanical Technician"(June 2010 to September

2010)

- Samra Combined Cycle Phase 3

. Power Station,Gas turbine, Boiler and Steam

Generation,

Stack, Pipe insulation, coordination for Hydro

test, flushing and air blowing.

MAG Engineering & Contracting Co.

Site Engineer. ( January 2013 to MAY 2013)

- SAMRA FAST TRACK PROJECT

Organization the mobilization plan for equipment

and employ to the project of sample cycle gas

turbine supply by ALSTOM, my duty is to coordinate

all mechanical actives on site (Gas turbine

alignment, exhaust system and air intake), Follow

up all the technical producer and project

requirement and make sure the site engineers are

applying it.

Participated maintaining quality systems, Time

schedule and construction for the following

activities:

Gas turbine : Piping (Small and Large bore)

Supervision of construction work for C.S, S.S.

ASsociated TRAnstech Contracting CO.(ASTRACO)

piping Engineer (May 2013 to present)

- Power Plant IPP3 Jordan

- Samra Combined Cycle Phase 3

Participated maintaining quality systems, Time

schedule and construction for the following

activities:

Two HRSG (Steam Boilers) Piping (Small and Large

bore) Supervision of construction work for C.S, S.S

and Allow material (P91, P22 & P11), Participated

in arrangement & coordination for Hydro test,

flushing and steam blowing activities for the power

plant after completion of construction work.

Certificate of participation in the "speed control

AC motors," in the Jordan Engineers Association _

the Scientific Committee of the Mechanical

Engineering Division.

Personal skill

- Focused and goal driven professional with experience managing

operations, working in teams, profits and organizational improvements.

Successful track record of progressive experience based on exceptional

organizational and analytical skills and demonstrated commitment to company

goals. Known for innovation and lateral thinking skills with a consistent

record of success in solving diverse business problems. Confident and

poised in interactions with individuals at all levels. Holds high personal

standards and consistently leads teams to achieve high levels of success.

Superior communication and negotiation skills.



Contact this candidate