Post Job Free

Resume

Sign in

Site Engineer Power Plant

Location:
Vasant Nagar, Karnataka, India
Salary:
9lakhs
Posted:
September 03, 2021

Contact this candidate

Resume:

Father’s Name : S.Seeni

Age : ** Yrs

Nationality : Indian

Education : Diploma in Civil Engineering

Year of Passing : 1994-1997 at Sri Sowdambika Polytechnic,Aruppukottai. Civil Engineer:-

I, Soundaien, is a Diploma in Civil Engineering holder having totally 23 years, which includes Experience also 7 years in Construction Supervision of Private Sectors & National Highways, Starting from preliminary survey, Earthwork, Foundations, Sub Structures, Super Structure, Finishing, MEP and Infrastructure works, Extracting the task required for the Management, pre planned and systematic manner With in stipulated Budget cost, Time and quality in taking more steps for executing the site works from subordinate with good communication & Technical skills, and latest methodologies,Leadership qualities skills in monitoring, planning, executing, scheduling and procurement of materials for civil works, Looking for a carrier most benefting my profound experience in utilize my technical and Interpersonal skills, I aspire to grow with the ambition of the institution & Serve its ultimate target, even to the extra miles that are required to be Covered. I am also having knowledge in ISO,

Areas of Excellence Include: Team Coordination Scheduling Cost Control Field review Quality Control Site Safety Document Review Planning…..

Computer knowledge: Auto CAD, MS Ofce-Word, Excel, Power Point. PROFESSIONAL EXPERIENCE

Name of the Employer : ANNAI INFRA DEVELOPERS (P) LTD, ERODE. Period : Dec – 2020 To Till Date

Designation : Project Manager

Project & Location : TIRUPPUR CITY MUNICIPAL CORPORATION (PACKAGE – 5, OHT and Water Pipe Line Work) – Tiruppur City.

Responsibilities:

CURRICULAM VITAE

K.S.SOUNDAIEN .

No: 17, RBM - Illam,Ramasamy Street,

South Street, Aruppukotai - 626101, Virudhunagar - District, Tamilnadu, India, C ontact: +919*********/784-***-****. Email.Id: - adoiq6@r.postjobfree.com /adoiq6@r.postjobfree.com PERSONAL DETAILS

To plan, Schedule, Monitor the project and Target achievement within defned cost, time and quality parameter.

Providing Leadership support and encourage the involvement of people at all levels to show and to develop their abilities for implementing the project.

Modifying and Improving the system and approach to activities based on the availability of Men, Machine, Materials and site conditions.

To Improve and Identifying, system of interrelated process for the efectiveness and efciency of the organization.

Efective decision-making based on the analysis of data and information to perform better work, Focus on Need, Demand, and Scope of project.

Setting a mutual relationship between the Engineers / Suppliers / Sub-Contractors / Helpers for smooth running, Co-operation with supervision, Client, Name of the Employer : Uniqcore Construction (I) Ltd, Chennai. Period : Sep- 2017 to Nov – 2020.

Project : Fly ash Processing Plant, Gayathri Power Plant, Nellore - AP. SPRR CITY(High Rise Building) – Perambur, Chennai. Designation : Assistant Project Manager

Responsibilities:

To plan, Schedule, Monitor the project and Target achievement within defned cost, time and quality parameter.

Providing Leadership support and encourage the involvement of people at all levels to show and to develop their abilities for implementing the project.

Modifying and Improving the system and approach to activities based on the availability of Men, Machine, Materials and site conditions.

To Improve and Identifying, system of interrelated process for the efectiveness and efciency of the organization.

Efective decision-making based on the analysis of data and information to perform better work, Focus on Need, Demand, and Scope of project.

Setting a mutual relationship between the Engineers / Suppliers / Sub-Contractors / Helpers for smooth running, Co-operation with supervision, Client, Name of the Employer : Abu Hatim Groups LLC, Oman

Period : From August-2013 to August-2017

Designation : Site Engineer

Client : Royal Oman Police (ROP),

Projects : Oman Special Task Force Complex, Police Station Complex, Muscat. Responsibilities:

Co-ordination and Site Execution & Planning and assigning job for the Man Power.

Study for Drawings, Specifcations, BOQ, Method of Statements, MAS, Following for approved shop Drawings and Query.

Planning and achieving the Construction Targets, Scheduling coordination requirements.

Resolving Technical problems related to the Works, efective utilization of Manpower, Machinery minimum cost, assisting material procurements, Reinforcement and BBS Preparation.

Modifying and Improving the system and approach to achieve the milestone activities based on the availability of Men, Machine, Materials and site conditions.

To Improve and Identifying, understanding in managing a system of interrelated process for the efectiveness and efciency of the organization.

Name of the Employer : Allied Investments & Housing Properties (P) Ltd, Chennai. Period : From March-2011 to June-2013

Designation : Senior Project Engineer

Client : Olympia Group of Company, Chennai

Projects : Olympia Opaline Tower (High Rise Buildings) OMR - Chennai. Responsibilities:

To plan, Schedule, Monitor the project and expedite resources to ensure project milestones achievement within defned cost, time and quality parameter.

Providing Leadership support and encourage the involvement of people at all levels to show and to develop their abilities for implementing the project.

Modifying and Improving the system and approach to achieve the milestone activities on the availability of Men, Machine, Materials and site conditions.

To Improve and Identifying, understanding in managing a system of interrelated process for the efectiveness and efciency of the organization.

Efective decision,making based on the analysis of data and information to perform better work, Focus on Need, Demand, and Scope of project.

Setting a mutual relationship between the Engineers / Suppliers / Sub-Contractors / Helpers for smooth running, Co-operation with supervision Consultants, Client, Name of the Employer : Tafseer Contracting & General Maintenance Company, Abu Dhabi, UAE. Period : From Feb-2009 to Feb-2011

Designation : Site Engineer

Client : Hydra Properties, Abu Dhabi, UAE

Projects : Hydra Avenue Towers, Al reem island, Abu Dhabi, UAE. Responsibilities:

Co-ordination and Site Execution & Planning and assigning job for the Man Power.

Modifying and Improving the system and approach to achieve the milestone activities based on the availability of Men, Machine, Materials and site conditions.

Planning and achieving the Construction Targets, Scheduling coordination requirements.

Resolving Technical problems related to the Works, efective utilization of Manpower Machinery minimum cost, assisting material procurements, FormWork using for Aluminium Formwork System

(aka) Mivan Shuttering.

To Improve and Identifying, understanding in managing a system of interrelated process for the efectiveness and efciency of the organization.

Study for Drawings, Specifcations, BOQ, Method of Statements, MAS, Following for GFC and Approved shop Drawings and Query.

Name of the Employer : Consolidated Construction Consortium Ltd, Chennai. Period : From June-2005 to Jan-2009

Designation : Senior Engineer - (BBS)

Client/PMC : Mahindra Group of Company/ C.R.Narayana Rao Projects : Mahindra Research Velley, Mahindra City, Chennai Projects Value : 200Crore/INR

Client/PMC : Triumph International (I) Ltd, Germany/Naksha Associates, Chennai Projects : Triumph Garments Factory SingaPerumalKovil, Chennai Projects Value : 60Crores/INR

Client/PMC : Sigma Aldrich Chemical Laboratory (I) Ltd, Bangalore/PMC - Bangalore Projects : Sigma Aldrich Chemical Laboratory (I) Ltd, Bangalore Projects Value : 90Crore/INR

Responsibilities:

Co-ordination and Site Execution & Planning and assigning job for the Man Power.

Modifying and Improving the system and approach to achieve the milestone activities based on the availability of Men, Machine, Materials and site conditions.

Planning and achieving the Construction Targets, Scheduling coordination requirements.

Resolving Technical problems related to the Works, efective utilization of Manpower Machinery minimum cost, assisting material procurements, Reinforcement and BBS Preparation.

To Improve and Identifying, understanding in managing a system of interrelated process for the efectiveness and efciency of the organization.

Study for Drawings, Specifcations, BOQ, Method of Statements, MAS, Following for GFC & approved shop Drawings and Query.

Name of the Employer : M/S R.K & SONS, Chennai

Period : From July -2000 to May-2005

Designation : Site Engineer

Client/PMC : Chennai Metro Railway Transport Service, Chennai Project : Railway Over Bridge at MRTS – Velachery, Chennai Widening of four lane and Rehabilitation of existing 2 lane carriage way of Kanchipuram to Walajapet 88+000 to

106+400 RC-2 Package

Client : National Highway Authority of India

Consultant : M/s. Sauti Compagnia Generale D’ Ingenerial S.r.l. Italy in Association with Gherzi

Eastern Limited.

Project Value : 10 Crores

Responsibility:

As Site Engineer, responsible for Execution of Bridge Foundation Cast in Situ Pilling, Hard rock level fxing, Concrete, Pile cap, Pillar Casting followed by road formation level(RFL), roadwork constructions from original ground level (OGL) to fnished road level (FRL) level in various stages, with Kerb laying and getting approval from consultant as per the most specifcation. Name of the Employer : M/S. URC Construction (P) Ltd, Erode –India Period : From May - 1997 to June - 2000

Designation : Assistant Engineer

Client/Consultant : Jayavilas Groups/Mukesh Associates Projects : Jayakrishna Spinning Mill, Aruppukottai. & Jayasoundram Spinning Mill, Sivagangai.

Responsibilities:

As Assistant Engineer, responsible for Execution of Site and coordination, study for all drawings, Specifcations, BOQ, Method of statements, most specifcation,

Resolving Technical problems related to the Works, Efective utilization of Manpower, machinery minimum cost, taking of all quantity check with all works,

Coordination with Electro Mechanical & AC Division, Interior Decoration etc….. Languages Known : English, Hindi, Tamil, Telugu, and Kannada & Malayalam.

(K.S.SOUNDAIEN)



Contact this candidate