Agni Maharaja.
Madurai, India ******
Home: +918********* - Cell: +918********* - adm0c3@r.postjobfree.com
Professional Summary
Nearly 13+ years of experience as a Piping Mechanical Engineer & Maintenance Engineer in Projects related to Oil and Gas Plant, Power Generation Plants, Oil/Gas pipeline-system in Owner / client companies in the world. My experience is primarily in Project Execution / Supervision / Project Management and I am looking for suitable job in site / construction supervision / management/Maintenance Engineer. As a Piping Mechanical Engineer, my job responsibility includes Interface Management of project Piping Mechanical Work, Structural work related to Pipe Rack, Piping & Piping Support, progress synchronization with other departments like civil, electrical &instrumentation. Starting from P&ID, Isometric checking up to Mechanical Handover of the lines / Piping loops and Systems. Also dealing with subcontractors, execution & control of piping works including fabrication, erection and all kind of Piping in the connection of Vessel, Tie-ins, HRSG,Gas-Turbines,Boilers,Tanks,HeatExchanger,Blower,Pump & Compressor.
Highlights of Qualifications:
1.Remarkable experience with piping and pipe support installation and inspection. Wide knowledge of piping techniques and pressure tests. Ability to interpret engineering specific to piping drawings. Familiarity with current Piping Industry Standards - ASTM and ASME codes. Expertise in performing audits for construction quality control . Ability to read, understand piping construction drawings . Remarkable ability to ensure project completion on time . Exceptional skills to work on Microsoft applications . Excellent organizational skills .
2.Dedicated Maintenance Supervisor offering 2 years of successful team management in maintenance-driven roles. Adept at scheduling facilities maintenance to minimizing downtime and safety hazards. Well-versed in equipment troubleshooting and repair with focus on quality and efficiency.
Skills
Staff Management
Planning & Scheduling
Business Planning
Auto Cad
Ms Office
Execution
Work History
09/2018 to 12/2020
Managing Partner
Parambriym – Madurai, TN.
• PreparedPlan,Estimation& time Schedule to complete the project.
• Finalization of vendor as per our standard &Quality.
• Execute & complete the project as per the schedule prepared.
• Arrangements for Grand Opening ceremony
• Purchase the Raw materials at right price & without compromising the quality.
• Everyday Monitor overall business & to control the food waste as per the previous sales record.
• To run the business & Successfully maintain the cost in effective manner.
• Prepare Sales report & invoice maintained every month separately to filling GST.
08/2014 to 08/2018
Piping Engineer
Hyundai Heavy Industries, HHI – kuwait, kuwait
Supervise all mechanical and piping construction activities to ensure all the works are carried out as per Approved specification and schedule.
Installation of piping system, tanks and steel structures by using plan/engineering drawing, isometric drawing, and P&ID's.
Planning and day wise progress monitoring of work as per schedule.
Checking of ISO's drawing, release for pre-fabrication spool based on the priority and material availability.
Review P&ID's, piping plan, isometrics and equipment drawing.
Routing lines, construction piping plans, equipment location plan, and isometrics drawings.
Checking all of equipment used for hot job activity (welding machine, grinding, cutting torch) before job started, by using checklist sheet from the COMPANY.
Tie-Ins activities (planning, review procedure and method, drawing, fabrication, spool and installation/welding).
Ensure all construction activities (piping, mechanical and structural) in respect of safety, quality.
Contractor working for the approved construction method statements and schedules, performing to schedule requirement and have sufficient qualified supervision and skilled labor.
Preparing and reviewing piping specification in accordance with the COMPANY standard and general codes.
Provide piping technical input to P&ID's, including piping classes, valve types and special items.
Reviewing WPS from Inspection Department, and ensured that contractor welder performing their job as per requirements.
Co-ordinate with inspection team (QA/QC) for witnessing all field piping test, including hydro test, dye penetrant, UT and any other NDT which required by the COMPANY.
Reviewing all site work and prepare the punch list for the construction contractor.
03/2012 to 05/2014
Project Engineer
Hyundai Heavy Industries, HHI, MARAFIQ – Jubail, Saudi Arabia
Preparation of Test Packages, detail coordination in punch list activities with details loop checking.
Coordination between the office and site activities with detailed reporting.
Expedite Structural modifications of pipe Racks, Columns, Sleepers related to piping .Ensure piping work carried out in accordance with company rules, regulations, standards and permit to work procedures Chemical cleaning of piping systems including Oil Flushing,Acid cleaning, Rinsing, Passivity / Neutralization.
Review work and inspection results to ensure compliance with EPC Contract requirements.
Interface and coordinate with Project Field Engineering and QC Section.
Monitor and ensure the correction of non-conformance report items and other issues supporting QA/QC compliance Review the construction sequence/logic, work plan/procedures, pre-task planning and methods statement to ensure comprehensive feasibility and safety, Push up the contractor for speedy work, guide & assist them to achieve the target in time.
10/2009 to 01/2012
Piping Engineer/Draughtsman
Essen Global L.L.C – Al mina, United Arab Emirates
To plan and schedule the work and efficiently organise the site / facilities in order to meet an agreed programme of deadlines.
To attend regular meetings with clients and keeping them informed of progress.
To supervise and monitor the site labour force through General Foreman and or Supervisors, monitoring the work of any subcontractors to complete the work as per Project Schedule.
To oversee quality control and safety matters on the site, and ensure that regulations are adhered to.
To resolve any unexpected technical difficulties and other problems that may arise at any time.
To oversee the selection and requisition of materials for use in the construction / maintenance, to check whether the materials are as specified.
To supervise and ensure proper maintenance of materials and to advise on technology and modifications required for a simpler and cost saving mechanism.
To prepare necessary paperwork for the completion of work and get it authorised by the client after their inspection.
To develop a relationship with the Project Engineer and prepare periodical reports on the progress of work.
Worked for complete piping system survey fabrication, erection, inspection, testing and reinstatement & Overall site co-ordination headed the team of material management and vendor negotiation.
Both technical, and commercial issues .For domestic and import products, Day to day site co- ordination for site construction activities, Resource planning and mobilization of manpower.
Machinery for the project, Rate analysis & preparation of tender documents & tendering for sub-contract works / vendors / Specialized Agency.
Worked for complete Super Structural, Tank, Heavy Equipments& piping system survey fabrication, erection inspection, testing and reinstatement, Follow-up work progress of the jobs being carried out on the shop floor and assisting the shop supervisors in relation to production, purchase etc.
Man power planning explaining drawing to the work force.
Estimation of material requirement.
Material procurement and planning Monitoring the job progress in compliance with codes and client requirement.
Supervision of erection of heavy structural steel, equipment, pipeline, Lassoing with the in house inspection cell and sub-contractors.
Preparing progress reports on weekly basis.Lassoing with clients.
10/2008 to 08/2009
Maintenance Engineer
Thiru Arooran Sugars Limited – A.chittur, India
Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
Dismantled defective machines and equipment and installed new or repaired parts.
Organized and directed maintenance shutdowns and startups.
Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
Reviewed technical documentation to complete equipment maintenance and repair.
09/2007 to 10/2008
Mechanical Design Engineer
Caresoft Global Pvt. Ltd – pollachi, India
Developed CAD drawings from hand sketches, verbal instructions and site visits.
Prepared Spool Drawing,Isometric Drawing,P & Id'S & PFD'S.
Routing as per site condition.
Prepare Test Packages Limit as per the system.
Education
04/2007
Bachelor's Degree: Mechanical Engineering
Raja College of Engineering & Technology - Madurai
Languages
Tamil: Native language
English: B2
Upper intermediate
Hindi: B1
Intermediate
Malayalam: B1
Intermediate