Resume

Sign in

Power Plant Engineering

Location:
Khobar, Eastern Province, Saudi Arabia
Salary:
USD8000
Posted:
March 18, 2020

Contact this candidate

Resume:

SUDIN ABIDIN, PE - MBA - PMS

(BSc in Mechanical Engineering & Electrical Engineering – BA Master)

Senior International Project Manager – Offshore/Onshore O&M and EPC Global Projects, Refinery & Petrochem, Marine Loading Facilities, Offshore Facilities FPSO/FLNG/TLP/FPS/CPP/MOPU/MODU/Subsea SURF-SPS, Crude Oil Terminal/Refinery, LNG/Compression Facilities, Power Plant, Seawater Desalination and RO Water Treatment Technology

Oil & Gas and Energy Sector – Upstream, Midstream & Downstream Project Consultant

+60-018-****-***

adccr4@r.postjobfree.com / WWW.HTTPS://LINKEDIN.COM

PROFESSIONAL SYNOPSIS

The dream has turned into the reality when I was completely became a professional mechanical engineering and my career was born on 1982 was graduated of Bachelor of Science in Mechanical Engineering (BScME) and taken up the professional mechanical engineering (PME) board examination in Professional Regulation Commission (PRC) on November 1992 in NCR Manila Philippines. Graduated as well of BS in Electrical Engineering and duly licensed Professional Electrical Engineer. With having currently thirty (30) years of diversified working experience in Construction Industry from various diversified downstream, midstream and upstream field development either land or sea job applications. DESIGN: Strong knowledge technical skills and enhances of Engineering Design as primary scopes handling jobs from EPCI multi discipline design team. Being involved as FOLLOW-ON ENGINEERING & EXECUTION STRATEGIES during construction phase to supports procurement team for long lead items and other associated bulk materials being ordered to purchase including reviews/evaluation from vendors tenders/ITB for approvals, issued drawings/design docs for fabrication purposes, finalized/reviews of 3Dmodel/i-PDMS, from HEMP/ALARP should having finalization reviews of PRA/HAZOP/HAZID/SIMOPS/SAFOP, leader to carried out constructability reviews, manages contractors SOW/quality/safety/timely completion of deliverables and other related equipment installation methodology as provided from fabrication to site (QA/QC), FAT/SAT visual inspection, proper and safety drill rig erection work and wellhead construction/installation AND Transportation & Offshore Installation including Site Vessel Anchoring. Has extensive experience being involved not only from various electrical and mechanical designs but for all variety aspects as such Basic Design/engineering definitions/Feasibility Studies, Conceptual, Pre-FEED, FEED and Detailed Design through EPC/EPCIC phase ranging USD20million to USD33billion the biggest project handled so far but most of all our expertise off-course is global design and I do believed that the good designer or with extensive design expertise is a great and effective Construction Executioner whether Green Field or Brownfield projects regardless the location or area of application and I would be able to demonstrates the most important thing and successful project delivery using extensive strategies when executing minor or major projects were fully utilized using of the following guideline tools from the following; Value Engineering Processes and Ergo-Tech Project Planning for Offshore & Onshore operations.

The Nature of the Projects and our Objective is to Design and to follow-on engg for the following scopes; Construct/Erect, Test, Commission & Run/Startup: Also Following; Renewable Energy/Power Solutions, Petroleum Refineries, Petrochemicals, Offshore & Marine, Crude Oil Terminals Jetty & Loading Facilities and Power Plant.

DESIGN: Get rounded by 360 degrees being involved and covered the Oil & Gas Offshore brownfield Facilities for Engineering Design thru-working-with Feasibility Studies/Engineering Definition, FEED, Conceptual and Detail Engineering Design (DED which under EPCI), truly adopted the Sep-iSYS Separation Technology for Early Production System (EPS) and desander being developed with total savings of 50% CAPEX reduction for separation/scrubber system and fully compliance to PTS/PPGUA/API-RP-2FPS through every projects being executed both local and international codes and standards design practices, certainly provided for such good quality management system and prioritizing safety & environmental compliances (HEMP). Handling special design tasks for undersea platform piles concrete reinforcement design and subsea gas turbine compressor plinth and foundation design. Led and author and proud have won several projects from design competitions.

TRANSPORTATION/INSTALLATION/FABRICATION/PROCUREMENT: I have covered the procurement of engineered equipment (LLI) & bulk materials, coordinated from supply chain/logistics, FAT/SAT, ITB/TBE for vendors/contractors thorough capability check/technical evaluation, provided project execution plan/quality assurance plan/safety plan, supervision/checking of mechanical modular system fabrication, jack-up drilling rig and manages wellhead assembly during fabrication phase from MMHE/LSSE/SEMCORP/Keppel/HHI-SHI-Korea, assessed mechanical equipment packages and other associated peripherals, required 3rd party safety studies (QMS/QA/QC) & HEMP & ALARP workshops, constructability, global interfacing and methodology reviews, transportation & installation, heavy lifting, testing, hook-up-commissioning & tie-ins, start-up and operator’s trainings (for technology transfer). Oversee module frames fabrication, erection and installation surface and subsurface equipment anchorage foundation, pillars supports and platform leg piles reinforcement concreting.

ASSETS & LOGISTICS PLANNING MANAGEMENT: Provides new general assets management and operation/planning expertise from design of production & combined mobile drilling rig, structural components fabrication and equipment assemblies into process assurances that all systems and components of floaters all-through deep-sea well drilling facilities are perfectly in-placed within budgets, timing, safety with good qualities and highly qualified amongst other integrated management system that are properly secured for all other inter-related businesses whether oil and gas offshore/onshore, industrial plants/power facilities are properly designed installed, well-tested, operated and maintained in accordance to local or foreign compliances that are delivered as per statutory requirements of the facility owner/operators or clients. Ensure meeting of the following target project revenue through CAPEX/OPEX, certified good decision maker, punctual to timeline/milestone, safety, quality, zero LTI and zero VOs, approves reasonable expenditures meeting target budgets allocations but surely to do not compromise the quality and safety. Provides absolute resolutions and clears all project technical issues from robust operations, GI leader team coordinator and excellent handling global interfacing.

The Nature of the Projects have being executed for the following; Design, Construction & Project Management: Renewable Energy/Power Plant & Power System Solutions, Petroleum Refineries, LNG/Petrochemicals, Pipeline, Tankage System, Offshore & Marine, Crude Oil Terminals Jetty & Loading Facilities.

CORE COMPETENCIES AND ACHIEVEMENTS

Extended technology and expertise to the mechanical commissioning, start-up and operations control of mechanical equipment of onshore and offshore facilities, supported to the implementation with HEMP/HSSE/ALARP policies and the company’s fulfillment of duty and responsibilities. I have strong work ethic, results oriented leader with serious commitment to the job and career professionalism. I am a part of various project development stages from engineering design, procurement to construction, handover and closeout through technology transfer to operators.

My qualification and skills were applied very efficiently in implementation of several projects' work packages in the Oil and Gas offshore and onshore green & brown fields. Responsible for the successful completion of the following nature of Projects:

1.Oil & Gas Upstream Environment: (22 YEARS Enhance Design Concept Development Management)

Offshore Gas Compression and Separation Technology being recommended using Sep-iSYS CSRS Bulk Desander was offered for project budget savings of 50%. (Proposal & Project Execution)

Floaters / Topside / Jacket Fabrication / design & construction of Modular System and Offshore Out-Fitting. – (joined Design Competition and won 3 projects)

Transportation & Offshore Installation – Sail Away Semi-Submerge Vessel via Tug Boat, 4000 tons Offshore Lifting Barge and Ship-boat Installer/pipe laying.

Fixed Production Platforms / Topside / wellhead and drilling system/ Seahorse light Satellite WHP with Interlinked bridges

TLP and FPS/Semi-Submerged Central Processing Platform (TLP Malikai was awarded to Technip)

Subsea – SURF / SPS interconnected to FPSO, WHP, FSO or Mobile Jackup Rig (MOPU/MODU)

Undersea Reinforcement Concrete Design

2.Oil & Gas Downstream/Midstream Environment: EPCI, EPCC, EPCIC-LSTK, EPCM and PMC

Petrochemicals

Pharmaceuticals

Refineries

Oil & Gas Loading Fac and Crude Oil Terminals

LNG Process & Refinery/Gas Compression (Cryogenic) Facilities

Oil Gas Products Transportation Pipeline

3.Infrastructure & Industrial Utility Environment: EPC, EPCIC-LSTK and PMC

Water Treatment Plant

Desalination Plant

Water Intake Cooling System/Cooling Tower

Potable, Domestic and Industrial Water, Distribution and Tankage System

Water Sewerage System

4.Energy / Power Sector (10 YEARS Enhance Execution Management)

Natural Gas - Combine Cycle Gas Turbine Power Station (CCGT) Mechanical Appurtenances

Floating Barge Power Station (dual fuel Diesel & Gas Power Generation)

Renewable Energy (Biogas/Biomass, Geo-Thermal, Thermal, Solar PV, Wind & Wave) Mechanical Rotating/Static/Piping/special equipment outfitting

Coal Fired Power Generation Plant

Heat Recovery Steam Generator (HRSG) System Design and Construction/Commissioning

Enhance, knowledgeable and conversant for both local and international design codes and standards i.e. ASME, BS, ANSI, API, ASTM, as well as per customer specific standards such as Petronas Technical Standard/PPGUA, SIRIM, Shell DEP, GS, NORSOK and Art hit General Specification etc. Mandatorily been involved with peer review, periodic engineering review, assisted MOC/QA/QMS, final document review, 3D modeling, PRA/HAZOP/HAZID/SAFOP and other required technical safety assessment/HEMP/ALARP or related safety technical services, mechanical equipment maintenances, construction methodology docs for DOE and DOSH to sustained requirement.

COMMISSIONING: Provides technical expertise into process assuring that all mechanical/electrical outfits, process flow assurance are in place and topside components of the facilities are completed for the following; testing, hook-up-commissioning & tie-ins, start-up, system integrations and includes operator’s trainings (technology transfer) whether oil and offshore/onshore, industrial plants/power facilities are properly designed installed, well-tested, operated and well maintained in accordance to the local and foreign compliances are as what we delivered per statutory requirements of the owner and operators.

Committed for improving quality of Maintenance Services with full applications and knowledge of; Technical multi-discipline Designer, Operation & Maintenance & TAR/HEMP for Infrastructure Facilities Job Environments.

OPERATION & MAINTENANCE: I have covered the procurement of equipment and materials for facility repairs, shutdown and equipment maintenance, FAT/SAT, ITB/TBE for vendors/contractors thorough check/evaluation, provided project execution plan/quality assurance plan/safety plan, supervision/checking of fabrication of supports and equipment associated peripherals, required safety studies & workshops, transportation & installation, testing, hook-up-commissioning & tie-ins, start-up and operator’s trainings (3rd party contractors).

SHUTDOWN/TAR & HEMP MANAGEMENT: Provides technical safety expertise into process to mitigates shutdown plan by 3rd party system specialist, safety studies/PRA apprehend, mitigate and provides corrective measures to ensure that turnaround/shutdown planning for all systems and components of the brownfield facilities whether oil and gas offshore or onshore, process, GTL, LNG, light/heavy industrial plants, power facilities are highly compliance to safety standard practices we shall operate and maintained in accordance to local or foreign HSSE and HEMP compliances as statutory requirements of the owner/operators or facility stakeholders.

PROJECTS AND JOBS EXPERIENCE

February 2015 – Present

SBA ENGINEERING MANAGEMENT SERVICES SDN BHD

Position: OFFSHORE INSTALLATION & OPERATION MANAGER / SURF-SPS Engineering Manager (Freelance)

Projects: Power Solutions for BORF Murphy Oil, PetroViet KNT-CPP by Armada TPCE, Profundo, CNOOC Subsea Project under Profundo Technologies P/L, and TAMP Project for ECOT Petroleum,

Led client and contractor teams through contract packages and all project stages of cross-execution campaigns from initial proposal to final investment decisions (FID). Manages and responsible of projects complete deliverables and formal hand-over. Led as provided good quality of BDE/FS/ED, Concept, FEED & Detailed Design Documents; following with mandatory statutory compliance to local and international codes and standards best practices, reserves internal engineering procedures, MOC and QMS to keep updated for project execution and project closeout.

Key Accounts: Subsea SURF-SPS, FPSO, Offshore Transport & Installation, WHP-Unmanned, Project Cost Estimation, Power Solutions, Renewable Energy (Biogas/Biomass)

January 2013 - January 2015

MISC BERHAD (Petronas Subsidiary)

Position: Senior Manager – Topside & Process Facilities, Offshore Site Installation, Barge Fab & Construction

Project: FPSO Cendor 2, Gumusut Kakap FPS, FPSO Ophir + Subsea + WHP + WIF, Engg Support to Commercial for project proposal/design concepts/tenders engineering and Asset Management Dept.

Manages and led the Engineering Design Team and Project Management dealing scopes with Petronas for various field development projects. Issued directives to contractors all throughout the project packages and stages of cross-execution campaigns. Manages Shipyard construction activities for FPSO Cendor 2. Project completely evaluated to ensure key deliverables are all in-place, prepared project dossiers & CDs with Closeout Report and has acceptance to formal hand-over to clients/operators/stakeholders/or Petronas.

Led and Oversee the Sep-iSYS CSRS Bulk Desander design applications for FPSO and power gen & e-house onboard. Advised and approvals to design team for final FEED review to ensure mechanical selection requirements on seawater purifies to drinking water with complete desalination system for FPSO Ophir and FPSO Cendor 2 onboard & also provided FCEOR Chemical Enhance Oil Recovery System/Water Injection Facilities (WIF/Floater), tanks, chemical mixing module and instrumentation and control skid.

Chairs and Presides weekly client and consultant coordination meetings.

Key Accounts: Site Hookup, Tie-ins, Transport & Installation for FPSO Ophir, FPSO Cendor 2 Projects & FPS Gumusut Kakap. Technical Supports for WIF/MOPU, FCEOR, D18/D28 MOPU, and Various Existing Floaters Assets Jobs for Maintenance/Upgrading/Modification/Repairs/Re-deployment. Engineering Design review and process design modification of FPSO Kikeh with SBM and MCDC.

July 2012- January 2013

LEIGHTON OFFSHORE

Position: Project Manager (KL Head Office) - Site Offshore Follow-On Engineering/System Strategies, Construction & Project Operation Management (Basra, Iraq)

Project: SOC Sealine Project

Managing the two engineering manager with two areas; Phase 1 & Phase 2 for Conceptual/FEED Design Contract & EPCCs Detailed Design Engg project tasks and have had responsible handling of more than 160+ multi-discipline engineers (KL + Iraq) that has distributed from different project tasks ie; HOD, Senior PE, Project Engineer, Team Lead Engineers, senior engineers and rest of the multidiscipline designers because the SOC-Iraq is a huge with 7 years contract project. Have also supporting the commercial team by providing realistic project cost estimates to proposed new project for tenders including potential project.

Led client and contractor teams through all project stages of cross-execution campaigns from FEED to Detail Engg via EPCC. Manages and responsible of projects construction and complete contract deliverables till formal handed-over.

Key Accounts: Phase 1, 2 & 3 SOC Sealine Project - Iraq

March 2009 – July 2012

TECHNIP GEOPRODUCTION (M) SDN BHD

Position: Project Design Engineering & Offshore Project Proposal/Tender Project Engineering Manager

Project: Shell Sarawak D12 Conceptual Design, Puteri FWS Pipeline, Shell TLP Malikai FEED

Engineering Manager & Project Installation Manager multi-handling position (EPM Department) Responsible for delivering projects as per scope of works, cost & budgets and target schedule prior to customer expectations. Handling other jobs at the same time by supervising, directing & motivating teams (KPIs) with multi-discipline engineers coordinate vendors, contractors, related project associates and colleagues.

Led client and contractor teams through all project stages of cross-execution campaigns from initial proposal to final FEED. Manages and responsible of projects development design and complete deliverables throughout formal handed-over.

Key Accounts: Malikai TLP FEED, D12 Conceptual Design, FPSO Belud Conceptual Design, Puteri FWS Subsea Pipeline, Valemon CPP-Statoil Norway

July 2005 – March 2009

SHELL GLOBAL SOLUTIONS BV (Main HQ - Netherlands)

Position: Lead Project Engineer

Project Title: Ethylene Cracker Complex Houdini Project (ECC)

Led project teams and main contractor teams through all project stages of cross-execution campaigns of downstream Ethylene Cracker Plant Complex through validation and revision into final FEED and rolled-on to detail design via EPCM. Manages and responsible of projects completions formal hand-over to end user/operator SEPTC.

Manages Shell Petroleum Inter-Project Interfaces.

Key Accounts: Ethylene Cracker Plant Complex (ECC), Mono Ethylene Glycol (MEG) and Bukom Operation Services (BOS).

March 2003 – June 2005

OGP Consultants – MLNG TIGA Plant Change, Bintulu Design Office (BDO), Tg Kidurong Bintulu Sarawak

Position: Project Manager / Turnaround & Shutdown Specialist to MLNG DUA & SATU and MSDS

Project: MLNG Plant Change Project

Led client and contractor teams through all project stages of cross-execution campaigns from initial proposal to final project tender. Manages and responsible of projects complete deliverables and formal hand-over.

Key Accounts: MLNG TIGA Plant Change Project

Feb 2001 – March 2003

TOTAL Exploration & Production (E&P) ElfFina – Block 10 East Shabwa, Kharir, Yemen

Position: Plant Facility Manager/Senior Superintendent – Operation and Maintenance for New Projects

Project: Early Gas Compression Facilities, SATORP Jubail Refinery EPC, General Rejuv+Modification+Upgrading of Total E&P Yemen Refinery

Participated corporate discussions initiates advises and defined strategic project objectives and developed plant facility design of large-scale project contracts, new oil and gas process developments, planning and operation improvement campaign.

Pre-site & on-site supervision of exploration & production teams, mitigate site equipment installation procedures, checking design plan implementation, issued safety memorandum and delegates contractors for necessary O&M trainings.

Manages and responsible for T&S planning and monitoring till completion, contractors handover, gas & liquid process facilities acceptance and deliverable approvals.

Key Accounts: Early Gas Compression Facilities and SATORP JV for Jubail Refinery, Jubail KSA

June 1998 – February 2001

MMHE Berhard (Formerly MSE)

Position: Completion Project Manager / Fabrication & System Installation Manager

Projects: FSO YOHO Nigeria, FPSO Bunga Kertas, FPSO Ros Sea

Supports, Assist and technical advisor to Project Manager – Lead FEED review cycle to commence the detailed engineering of EPC and to ensure Scope of Works has to be carried out without any conflict from the Contract Packages, manages project control and scheduling, highly responsible to lead the 56 multi-discipline engineers for Engineering and Construction Team. Manages Shipyard operation and T&I.

Participated/Led FPSO Bunga Kertas and FPSO Ros Sea to complete commissioning, testing and startup works. Manages T&I, SUBSEA tie-ins to existing production well for new site deployed FPSO Bunga Kertas.

Led client and contractor teams through all project stages of cross-execution campaigns from initial proposal to final investment decisions (FID). Manages and responsible of projects complete deliverables/hand-over.

Dec 1996 – June 1998

BLUEWATER ENERGY SERVICES BV

Engineering Design Lead/System and Equipment Upgrading/IPS System Integration/Site Installation

Project Title: GlasDowr FPSO

Location: Merwede Shipyard HardinxveldGiessendam, Netherlands

Glas Dowr is now operating successfully on the Kitan field, located in the Timor Sea but then the First oil was achieved in October 2011 for Sable Field right after the production and processing facilities were upgraded and modified at Sembawang shipyard in Singapore. Previously, it was then first commenced for operation in August 1997 on the Durward and Dauntless field for Amerada Hess in the North Sea.

Responsible for handling and manages the design, procurement, construction and commissioning/startup as per Scope of Works specified in the Contract Packages through EPCI which managing of 67 multi-discipline lead engineers and designers and responsible for overall challenging role engineering through construction management, project compliances to local and international codes and standard practices, safety and quality assessment, overall coordination, shipyard & repair coordinator, project control and global interfacing tasks.

Led/Manages detailed design on storage capacities (export crude, slop tanks/fuel oil), validate FEED to DD for Process facilities on-board for following Fluid Cap 75,000bpd, crude production 45,000bopd, produced water 65,000bwpd, oil content water discharged <15ppm average. Validate final FEED for stabilized crude (RVP, H2S, BS&W) through detailed design. Provided detailed design for Water Injection and Gas Compression (liftgas), Power Generation (main-gen 4x gas turbine/1xdiesel/harbour gen/emerg gen includes E-house) and offloading facilities.

Sept 1994 to Dec 1996

HATCH ASSOCIATES – Canada (Former BHP Engineering)

Position: Head of Engineering / Project Manager

Project Involved: 1500MW CCGT IPP Power Plant, Shell O&G Tabangao New Bitumen Processing Facilities, Solar Power Plant

Participated corporate discussions initiates advises and defined strategic project objectives and developed plant facility design of large-scale project contracts, new oil and gas process developments and other international project and business trend opportunities.

Pre-site & on-site supervision of exploration & production teams, mitigate drilling procedures, checking design plan implementation, issued safety memorandum and delegates necessary trainings.

Manages and responsible of projects complete deliverables and formal hand-over.

Key Accounts: New additional Bitumen Processing facility, Project Business Development, Plant Cost Estimation, and Power Plant & Energy Solutions.

Aug 1988 – Aug 1994

PT Singar Mulia Indonesia

Position: M&E / I & C Designer

Project / Location: Unmanned Satellite Platform, WHP Production/Drilling-Rig Facilities, at Balikpapan, Indonesia

Produced & Preparation of Design Basis, Electrical/Instrumentation & ICSS Philosophy, Specifications, Datasheets, Design Calculation and TRP for Instrumentation, Control Element, ICSS (ICSS hardware and software design), hook-up/installations detail and power/control cabling.

Provided Design Basis for Offshore Telecommunication System, Specs/Data Sheet, Offshore Telecom Philosophy, Marine Navi-Aide and Telecom Functional Specifications.

Provided total technical integrity solutions and design capabilities/expertise through technical review/compliance check and specialized studies and continuously assess enhance project design concept, strategies, philosophies, BOD, safety & environment, L&I standards/codes and functional specifications.

EDUCATION, TRAININGS, LICENSURE & PROFESSIONAL AFFILIATION

TRAINING & COURSE ATTENDED

PlantWise User Training by Bentley

Pipe Stress Analysis (Ceazars 2)

Strategic Management for Project Engineers

Lean Six SigmaTraining & 8 Days Workshop (Technip Malaysia)

PDMS 3D Model Training (Technip Malaysia)

FPSO Topside &Facilities Solutions (MISC)

Helicopter Under Water Escape Training

Offshore Safety Training Courses

SAFOP/SIMOPS Analysis Seminar

HAZOP/HAZID Leadership Workshop

BOSET Training

Basic Firefighting& Self Rescue Course (SMTC)

Rotating & Static Machinery for Oil and Gas Learning Program

PDS 3D Modelling Technology (AMEC)

API 650 engineering design training

PMS-IPMA Certificate Conference 2005

DESIGN SOFTWARES (For My Design Review Tools)

ETAP V7.1 – Power System Design & Analysis

CEAZARS 2 Program (Piping Stress Analysis)

INtools/SPI Application – Instrument & Contr

HYSYS/OLGA – Process Analysis Software

iPDMS/SPM/3D Model Software

PIPESIM – Single & Multi-Phase O&G Pipeline

HTRI – Heat Exchangers Design Analysis

PV Elite 2008 Version – Pressure Vessel Design

BOCAD 3D V22 – 3D Engineering Drawing

2D MARS Fatigue Analysis (FPSO Design)

VERISTAR Software (FPSO Design)

EDUCATION:

Bachelor of Science in Electrical and Electronics Engineering (BScEE)

Bachelor of Science in Mechanical Engineering (BScME)

Master of Business Administration (MBA), Major in Project Management Skills (PMS)

PROFESSIONAL COMMITTEE:

Board of Mechanical Engineering, Professional Regulation Commission (PRC) – Philippines

Board of Professional Electrical Engineering, PRC - NCR, Philippines

Board of Engineers Malaysia (BEM)

PROFESSIONAL AFFILIATION

IPMA (Switzerland)

PSME (Manila, Philippines)

IIEE (Manila, Philippines)

IEEE (Pennsylvania, USA)

ISA (Houston, USA)

IEC (The Hague, Netherlands)

BEM (Kuala Lumpur, Malaysia)

IEM (Kuala Lumpur, Malaysia)

ASME (Singapore)

ASTM (Singapore)

API (Kuala Lumpur, Malaysia)

ABS (KL, Malaysia)

IACS (Singapore)

IMO (The Hague, Netherlands)

DNV (KL Malaysia)

BUREAU VERITAS (KL Malaysia)



Contact this candidate