MS (PM) Project Management 2016
COMSATS, Institute of
Information Technology, Virtual
Campus, Islamabad Pakistan
B.Sc Electrical
Engineering
Electrical & Electronics 2010 FUUAST, Islamabad
F.Sc (Pre-
Engineering)
Physics, Chemistry,
Mathematics
2005
Pine Hills School &College
Abbottabad, Pakistan
Matriculation Science 2002
Army Public School Skardu, Gilgit
Baltistan
Professional Experiences
Areas of Experience
Project Management Project Planning Contract Implementation Cost Estimation Claims and Variation Orders Construction Management & Supervision Bid Evaluation Engineering Designs Reviews Technical Reporting Health & Safety Quality Assurance/Quality Control Dam & Powerhouse Construction M&E and Civil Interface Electrical & Mechanical Equipments Assembling, Installation, Testing and Commissioning Mechanical, Electrical & Plumbing (MEP) Works
Transmission Line (LT & HT) 11kV, 66kV and 132 kV Grid Station Switchyard (AIS & GIS)
Control and Protection System SCADA System Automation Telecommunication
Instrumentation
Assistant Resident Engineer (ARE) Electrical
1- Working with Electra Consultants Pvt. Ltd, at 40.8 MW KOTO Hydropower Project in District Lower Dir. From Oct 1st, 2018 to date.
Owner: PEDO
Owner’s Engineer: Electra Consultants Pvt. Ltd
EPC Contractor: Sichuan-Sarwar-Silian-Chongqing Luyang(JV) Contract Price: United States Dollars (PKR 13,998.89 Million) Contract Type: Engineering Procurement Construction (EPC) P a g e 2 5
Job Descriptions
Review the Contractor’s designs and documents, making recommendations for changes or adjustments to the designs, drawings or specifications where necessary.
Check the design of the electrical components and equipment with regard to the method of installation.
Review the detailed requirements and standards to be used in the circuit diagrams to be submitted by the CONTRACTOR with their installation and the specifications of the equipment with regard to international and local standards.
Co-ordinate with the Team Leader and Senior Mechanical and Hydraulic Engineers procedures and scheduling for the installation of all equipment, cables switches etc, control and power supply to the underground structures and on the surface.
Witness selected workshop tests and review reports submitted by the contractors during manufacture of the electrical plant and when require by the employer.
Assist the contractors to develop and co-ordinate detailed test procedures for both dry and wet commissioning and participate in the supervision of these tests.
Review the relevant sections of the operation and maintenance manuals and check that the spare part lists and documentation including circuit diagrams is complete.
Advice the Electrical Site Engineer and supervise installation work at key times during construction.
To determine the requirements for the Civil and Mechanical works on site to ensure compatibility and co-ordination.
Senior Engineer (Electrical)
2- Worked with M/S HAJI Muhammad & Sons Govt. Contractor & General Order Suppliers Khaplu Ghanche from January 2018 to June 2018 on the following Projects.
CONST. of 0.7 MW Hydropower project at Hassan Abad.
Post Flood Reconstruction of Hydel Power Station at Bordas Balghar. Job Descriptions
To conduct technical and managerial meetings with the subcontractors and Government Departments.
Implementation of Approved Construction Schedule and preparation of Recovery plans to overcome the delays.
Preparation of Annual, Quarterly and Monthly progress reports.
Preparation of Minutes of Meetings and Site visit reports
To deal the Non-Conformance reports, Site Memos and technical letters as per contract Clauses.
To manage Electrical & Mechanical site activities (assembling, installation, testing and commissioning) of weir control room, gates etc., powerhouse (Generator, Transformer, Governor, Turbine, runner, Switchgear(MV/LV) room, Control Panels, SCADA System, Control and protection system, Flood / water measuring system, Transmission line, GIS, AIS, Cable trays, Internal / External electrification work, Penstock (Fabrication, Welding and testing) etc.
Review and Implementation of Project Quality Plan
Review of technical data, designs, construction drawings, shop drawings, as-built drawings etc.
To check site design adequacy of Electrical and Mechanical works in coordination of civil team. P a g e 3 5
Coordination with design groups, where required, for design requirements at site and propose changes in design as per site requirement.
Monitoring and managing of site progress as per approved work plan to achieve the target in time.
Assist the HSE team for implementation of Safe working hours during construction, installation, testing and commissioning.
Electrical Engineer (M&E)
3- Worked as Electrical Engineer with Pakistan Engineering Services, Pvt, Ltd, at 150 MW Patrind Hydropower Project Muzaffarabad, AJK from November 2015 to December 2017. Lenders: Asian Development Bank (ADB), Islamic Development Bank
(IDB), International Finance Corporation (IFC), Korean EXIM Bank
Lender’s Engineer: Mott MacDonald’s, UK
Owner: K-water (Korea)
Owner’s Engineer: Pakistan Engineering Services
EPC Contractor: M/s Daewoo E&C
Subcontractors: M/s CNEEC for M&E Works, M/s KYUNGDONG for tunneling work and M/s SUNGBU for Weir and power
intake
Contract Price: United States Dollars (USD 289,775,000.00) Contract Type: Engineering Procurement Construction (EPC) Job Descriptions
Management, Supervision and Monitoring of Electrical Works of Project as per approved work plan to achieve the target in time.
To conduct technical and managerial meetings with the concerned departments of contractors, sub-contractors and Government Departments.
Construction management and supervision of all E&M works during the construction of Weir Structure/Intake, Powerhouse, Transmission Line, Switch Yard.
Managing, Monitoring and supervision during Testing and commissioning of Powerhouse Units.
Checking and verifying physical measurements and evaluation of the works done and certifying relevant payments against works done by the contractor as per contractual procedures (Issuing Interim Payment Certificates / IPCs).
Coordination with design groups, where required, for design requirements at site and propose changes in design as per requirement.
Review of work procedures / method statements proposed by contractors and suggesting improvements in accordance with project specifications and contract requirements.
Review of technical data, designs, construction drawings, shop drawings, as-built drawings etc. submitted by contractor.
Processing and evaluation of claims submitted by the contractor.
Checking of BOQ according to specification of equipment and contract document.
Issuance of Non-Conformance reports, Site Memos and technical letters as per contract Clauses.
Review of Quality Inspection Plan in accordance with project & contract specifications requirements.
Checking, reviewing and approving shop drawings submitted by Contractor. P a g e 4 5
Organizing and Conducting meetings between Client and Contractor to review and monitor progress and quality matters, to resolve conflicts, problems, bottlenecks, and constraints in achieving project objectives & constraints, if any, and preparing minutes of meeting for reference and record of all concerned
Insure safety during assembling, installation, testing and commissioning of Hydropower plant.
Pre-commissioning and Commissioning of hydropower plant.
Multiple Units commissioning of hydropower plant.
Powerhouse Complex Commercial Operation Tests of hydropower plant. Junior Engineer Electrical
4- Worked on Satpara Dam Multi-purpose Project Skardu, Gilgit Baltistan on behalf of Pakistan Engineering Pvt,Ltd and also work at PES head office, Lahore from April 2010 to November 2015. Lenders: Public Sector Development Programme (PSDP), USAID Owner: Water and Power Department Authority
Owner’s Engineer: Pakistan Engineering Services
Contractor: M/s DESCON, M/s CMIC, M/s ANDRITZ Hydro, M/s CCCPG Contract Price: Original Pak Rupees 2090.431 million Revised PC-I Pak Rupees (4480.021 Million)
Contract Type: FEDERATION INTERNATIONALE DES INGENIEURS-CONSEILS
(FIDIC)
Job Descriptions
To present site progress related to Electrical and Mechanical works regarding technical issues during Lenders, Owners and insurer visits
To conduct technical and managerial meetings with the concerned departments of contractors, sub-contractors and Government Departments.
Assist the HSE team for implementation of Safe working hours during construction, installation, testing and commissioning.
Verification physical measurements and evaluation of the works done and processing of Interim Payment certificates (IPC) in accordance with approved milestone as per EPCC/FIDIC contract.
Assisting in preparation of Variation orders (VO’s), Extension of Time (EOT’s) and Monthly Statements (MS) as per Contract Provisions.
Assisting in processing and issuance of variation orders and substantial completion certificates after obtaining consent of the client and assisting in issuance of all certificates to the client for correct payment to the contractor.
Evaluation of EOT submitted by the contractor.
Implementation of Approved Construction Schedule and preparation of Recovery plans to overcome the delays
Preparation of Annual, Quarterly and Monthly progress reports.
Preparation of Minutes of Meetings and Site visit reports
Issuance of Non-Conformance reports, Site Memos and technical letters as per contract Clauses.
To manage and supervise Electrical & Mechanical site activities (assembling, installation, testing and commissioning) of weir control room, gates etc, powerhouse(Generator, Transformer, Governor, Turbine, runner, Switchgear(MV/LV) room, Control Panels, SCADA System, Control and P a g e 5 5
protection system, Flood / water measuring system, Transmission line, GIS, AIS, Cable trays, Internal / External electrification work, Penstock(Fabrication, Welding and testing) etc.
Review of work procedures / method statements proposed by contractors and suggesting improvements in accordance with project specifications and contract requirements. i.e installation, testing and commissioning of various works Including (Generator, transformer, GIS, AIS, Switchgear, SCADA, PLC’s, Control & Protection, Telecommunication, Transmission line, Weir Control room, MIV, Penstock, gates, Gantry crane(10 to 150 Ton) etc
Review and Implementation of Project Quality Plan
Review of technical data, designs, construction drawings, shop drawings, as-built drawings etc. submitted by contractor.
To ensure the FIDIC (Satpara Multi-purpose project) and EPC (150 MW Patrind HPP) contract specifications.
To check site design adequacy of Electrical and Mechanical works in coordination of Civil team.
Coordination with design groups, where required, for design requirements at site and propose changes in design as per site requirement.
Monitoring and managing of site progress as per approved work plan to achieve the target in time.
Checking of BOQ according to specification of equipment and contract document.
Detail Study of bid documents of contractors according to Public Procurement Regulatory Authority (PPRA), ITB, BDS, EQC, BDF, ELC, ERQ, condition of contract and contract forms etc.
Checking of technical Proposal, Financial reports, letter of Bid, Bid Security, power of attorney of contractors Bidding Documents (Personnel, Equipments, Site Organization, method statements, Mobilization schedule, construction schedules etc.
Assisted in the evaluation of pre-qualification documents (electrical part) submitted by the different contractors.
Pre-commissioning and Commissioning of hydropower plant.
Multiple Units commissioning of hydropower plant.
Powerhouse Complex Commercial Operation Tests of hydropower plant. Short Courses/Trainings/workshops
Three Month Course in PCB Designing and Fabrication from National Institute of Electronics Islamabad
One-day workshop on CPD Framework for professional developments of Engineers and Bidding Documents and Contract Documents Conducted by Pakistan Engineering Council on September 29, 2014.
One-day workshop on Renewable Energy Technologies (Solar) Conducted by Pakistan Engineering Council on January 25, 2017.
One-day Short Course on"Fundamentals of Project Management for Engineers" held on April 24, 2017, Conducted by Pakistan Engineering Council.
REFERENCE