Resume

Sign in

Engineer Project Manager

Location:
Upland, California, United States
Posted:
April 20, 2017
Email:
aczwlv@r.postjobfree.com

Contact this candidate

References Available upon Request

Gary R. Rendano

**** ********* ***

Upland, CA 91784

909-***-****

aczwlv@r.postjobfree.com

EDUCATION:

CALIFORNIA STATE POLYTECHNIC UNIVERSITY POMONA, CA. March, 1997 Bachelor of Science, Civil Engineering SAN BERNARDINO VALLEY COLLEGE SAN BERNARDINO, CA.

June, 1995 Associate of Science, Physics

June, 1994 Associate of Science, Mathematics

COMPUTER SKILLS:

Autodesk Civil3D 2016, AutoCAD LDD 2009, MicroStation, Staad, MS Excel, MS Word, MS Outlook Adobe Illustrator, Adobe Photoshop AES Hydrology, Primavera, Microsoft Project 2016, PDS (piping design), MathCAD PROFESSIONAL EXPERIENCE:

California Landscape & Design – Upland Ca Jan 2016-Current Civil Engineer/Project Manager

Arts District Los Angeles CA,

Westwood Park, Los Angeles CA

SouthPark Soccer Field, Los Angeles, CA

Trinity Park Soccer Field, Los Angeles CA

MacArthur Park Irrigation MainLine, Los Angeles Ca Responsible for supervision over construction crews and subs and working closely with the city of LA to assure the smooth progression of the project thru its construction phase to completion, issuing RFIs and Change Orders and Submittals as needed. Weekly meetings. Permits thru Building and Safety obtained. Punchlists generated and As-builts created. Grading plans generated using Civil 3D 2016. Erosion control plans and various civil related items as required by the city. City of Coronado, CA 2015-2016

Civil Engineer/Project Manager

Multiple C.I.P projects including FY 14/15 Preventative Maintenance and bike lanes project, Glorietta Guardrail replacement, Glorietta back flow preventer and cleanout project. PCI inspections and Streetsaver database updates. Utilization of Civil3D 2015 for creation of construction documents. OCParks, Irvine, CA 2014-2015

Project Manager – CARBON CANYON LAKE REHABILITATION PROJECT $2 Million budget included negotiation with U.S.A.C.E Regulatory and Asset Management Divisions to acquire project approval and NTP. Upon Approval utilization of OC Parks internal JOC and CTO systems to acquire and allocate funding for Construction contractor to perform the Phase 1 excavation and Phase 2 Clay Liner repair. On-site inspection of contractors’ performance on a daily basis to ensure adherence to U.S.A.C.E methodologies and requirements as land owned by the corps. Strict adherence to noise abatement due to Federally endangered species onsite. Contractor and Consultant invoices approval and signature and payments at completion and inspection of work.

City of Costa Mesa. 2013-2014

Project Manager over –

West 19th Street Corridor Pedestrian Improvement Project, Federal Project No. HISPL-5312(086), City of Costa Mesa, This project improved traffic operations and increased pedestrian safety at six locations along West 19th Street. The congestion and operational issues were abated by the utilization of References Available upon Request

enhanced safety and traffic operation improvements consisting of: visual enhancement of existing crosswalks; improved safety lighting; new countdown-pedestrian heads; improving the signal displays; and minor reconstruction of concrete improvements within the right-of-way. Additionally, the work included the installation of radar speed feedback signs at two locations along West 19th Street; upgrading the interconnect fiber cable between intersections; and extending the existing bus turnout. Responsibilities included site observation and construction quality, compliance with contract documents, general site safety, review of change orders, maintaining record documents, progress reports, cost reports and cost-control management.

Victoria Street and Valley Road Traffic Signal Improvements, Project includes traffic signal modifications consisting of implementation of protective-permissive phasing for eastbound and westbound left turn movements, new mast arms for northbound and southbound approaches and CCTV Camera installation. Responsibilities included site observation and construction quality, compliance with contract documents, general site safety, review of change orders, maintaining record documents, progress reports, cost reports and cost-control management.

Streets and Parking Lots Rehabilitation at Project Fire Station No. 5 and Canyon Park, City of Costa Mesa, Reconstruction of damaged curb and gutter, sidewalks, driveways, cross gutters and mill and asphalt concrete overlay. The project limits included the fire station parking lot and all of the streets in the canyon Park residential neighborhood. Responsibilities included site observation and construction quality, compliance with contract documents, general site safety, review of change orders, maintaining record documents, progress reports, cost reports and cost-control management. various CIP projects, storm drain rehabilitation, sidewalk/driveway approach rehabs. BRINDERSON E&C. Costa Mesa, CA 2011-2013

Civil / Structural Engineer / Construction Manager Civil/Structural Engineer for various petroleum projects in the United States. Position entailed paving, grading, drainage, alignments, profiles, hydrology calculations, pipe support structural calculations, base plate calculations. RFIs Construction Manager over Site in Hilo HI. Obtained TWIC Card. OSCA RSO Safety exam passed. Utilizing Civil3D 2012

TECHNIP USA. Claremont, CA 2007-2011

Civil Engineer

Civil Engineer for Various Hydrogen Plant Projects in the United States. Position entailed paving, grading, drainage, road horizontal and vertical alignments, profiles, hydrology calculations (rational method) Utilized Microstation J and Civil3D 2009

FUSCOE ENGINEERING. Rancho Cucamonga, CA 2006-2007 Civil/Project Engineer

Project Engineer for Various Land Development Projects in the Inland Empire which includes commercial, residential, and schools. Responsible for assisting the project manager in precise grading, profiles, alignments, curb returns, quantity calcs, Water/Sewer/Fire plans, plan check comments, submittals to the city/county, hydrology reports, utilized Land Desktop 2005 WAGNER HALLADAY INC. Corona, CA 2004-2006

Civil/Project Engineer

Project Engineer for Various Land Development Projects in Riverside CA Responsible for precise grading, profiles, horizontal and vertical alignments, curb returns, quantity calcs, Water/Sewer/Fire plans, Hydrology Calculations (Rational Method). Utilized Land Desktop 2004 and AES.

TETRA TECH. Ontario, CA 2003-2004

Ontario, CA

Civil/Project Engineer

Project Coordinator for Various Military Civil Engineering projects. Responsible for Hydrology reports and drainage calculations. Precise grading, profiles, horizontal and vertical alignments curb returns, quantity calcs, Water/Sewer/Fire plans, Utilized Land Desktop 2002 References Available upon Request

LOCKWOOD GREEN Engineering and Construction. Long Beach, CA 2002-2003 Civil/Structural Engineer

Responsible for Structural Drawings and Calculations on various projects in California Architectural Drawings. Structural Design utilizing Uniform Building Codes and STAAD and AutoCad 2000 NORTH COUNTRY ENGINEERING, P.C. Glens Falls, NY 2001-2002 Project Engineer

Project Engineer Responsible for Structural design and analysis of steel framing for new paper mill. Structural design beams, columns, base plates from dead and live load tributaries. Check connections from the detailer drawings. structural design calculations utilizing STAAD. Utilized AutoCad 2000 RAYTHEON / Washington Group International. Denver, CO 1999-2001 Civil Engineer

Responsible for design of airport drainage, pavement and earthwork on numerous airports in Colorado. Structural calculations; Assembly of construction and engineering reports. McMurdo Station Sewage Treatment Plant, Antarctica. Responsible for precise grading, profiles, alignments, curb returns, civil earthwork calculations, Water/Sewer/Fire plans.

RAYTHEON Engineers and Constructors. Newark, NJ 1997-1999 Civil/Structural Engineer/Assistant Project Manager Hudson-Burgen Newark City Subway Extension Project $50,000,000.00 Responsible for maintaining a high level of productivity among office personnel. Responsible for maintaining detailed archives of all construction and shop drawings. Responsible for all aspects of contract administration. Setting up and maintaining computers and LAN for Raytheon field office. Ilijian Cogeneration Project $20,000,000.00

Responsible for Structural Design Drawings, precise grading, profiles, alignments, curb returns, quantity calcs, Water/Sewer/Fire plans, 10-year storm design calculations for detention pond. Specification editing and conforming.

Saltend, England Cogeneration Project $10,000,000.00 Responsible for Structural Design Drawings, precise grading, profiles, alignments, curb returns, quantity calcs, Water/Sewer/Fire plans, 5-year storm design calculations for detention pond. Specification editing and conforming.



Contact this candidate