Mohamed ELBAZ
MTBM Operation Manager
Acquired Knowledge
Civil Works and Sewage Projects
Tunneling Projects
Herrenknecht : AVN machines (slurry system) and EPB machines (Earth Pressure Balance Shields)
Operation manager for machines
Management of the operation
Follow up the sites setup
Daily follow up of the sites and of the requirements in order to achieve the works respecting the quality requirements
Following daily reports and operation process of machines
In charge of the coordination with Herrenknecht Agent for spare parts needed
Complementary Information
Nationality(s) :
Egyptian
Date of Birth:
20/12/1981
Language(s) :
English : 4/5; Arabic : 5/5
IT Skills:
Microsoft Office
Diplomas and Trainings
Year
2004
Faculty of engineering, electrical machines and power system dept., Helwan University
Trainings:
Automatic control course – Salesian Don Bosco Institute, Egypt
Plc course – Arab Contractors training institute, Egypt
Professional Experience
2008 – 2015 ARAB CONTRACTORS
[Saudi Arabia, Egypt]
03/2014 – Today – TBM General Foreman – Cairo, Egypt
Project:
Sewage Project in Cairo
Herrenknecht Slurry Engines; from 600mm to 2500mm
Main Responsibilities:
Management of 46 persons: 3 engineers, 3 operators (one/shift) and workers
12/2012 – 02/2014 – General Foreman for TBM – Jeddah, Saudi Arabia
Project:
Jeddah Sewage Project
10 Km tunnels for 1400mm, 1500mm, 1800mm and 2500mm tunnels
Client : National Water Company
Main Responsibilities:
Responsible for the tunnel operation
Following up the sites setup
Daily follow up of the quality requirements and supervision of works onsite
Follow up of the daily reports and operation process of machines
In charge of the coordination with the Herrenknecht agent for spare parts needed
02/2008 – 12/2012 – General Foreman, TBM Operator – Cairo, Egypt
Projects:
Al-Marg Project, wastewater project in Cairo: 130 meters under metro railway, under bridge, shaft and water pipes
Elkatamia project: -75 meters for 3200mm machine under the highway, crossing the ring road, passenger tunnel
Elfayoum Gerza project: - 130 meters, 3200mm machines, under highway, train railway and river
Menia project: -180 meters and -45 meters under rivers for 3200mm machines
Dar El Salam project: - 200 meters for 1500mm machines
Marg project 86 meters for 600mm machines
Elkatamia project : -70 meters, passenger tunnels, for 3200mm machine
Port Said: -160 meters crossing under the train railway for 3200mm machine
Elkantara Ismailia: -160 meters crossing under the highway road for 3200mm machine
Roxy Cairo: 3 tunnels each about 150 meters for AVN 1500mm machine.
Madii Cairo: -130 meters crossing under the metro railway for the 3200mm machines
Main Responsibilities:
Team Management
Site Manager and Operator for Tunneling Machines, especially for 3200mm AVN Machines (Herrenknecht)
ALJABER TRADING AND CONTRACTING
Contractor [Qatar]
02/2007 – 02/2008 – Electrical Maintenance, TBM Operator
Project:
Gharafa Water Project
About 2Km for water pipes jacking 800mm AVN machines
Client: Qatar Water Company
Project cost: 10M QAR
Main Responsibilities:
Maintenance and operation for 800mm machines
About 15 tunnels with 90m pipe jacking in rock soil each
ARAB CONTRACTORS
Contractor [Egypt]
2004 – 02/2007 – Electrical Maintenance, TBM Operator
Project:
Agamy, Alexandria Sewage Project
About 9 kilometers tunnels from 600mm tunnels to 1800mm tunnels
Client: The executive organ of the drinking water and sanitation
Project Cost: 200 million Egyptian pounds
o5 tunnels for 1000/1200mm AVN machines operation each about 100 meters
o6 tunnels for 1400/1500mm AVN machines operation each about 260 meters
o3 tunnels for 1800 mm AVN machines operation each about 260 meters.
o2 tunnels for 1000mm AVN machines operation each about 100 meters
Giza Project: 2 tunnels for 3200mm AVN machines operation each about 130 meters
Luxor Project: 1 tunnel for 2500mm EPB machines operation about 130 meters
Korimate Power Station: 1 tunnel for 2500mm EPB machines operation about 260 meters under the river
Dar El Salam, Cairo: 1 tunnel for 1500mm AVN machines operation about 320 meters
Main Responsibilities:
Electrical maintenance for the TBM machines, from 600mm to 1800mm machines
Operation for 600mm,1000mm,1200mm,1500mm,1800mm machines
Only Herrenknecht engines, with AVN Systems