Mohamed ELBAZ

MTBM Operation Manager

Acquired Knowledge

Civil Works and Sewage Projects

Tunneling Projects

Herrenknecht : AVN machines (slurry system) and EPB machines (Earth Pressure Balance Shields)

Operation manager for machines

Management of the operation

Follow up the sites setup

Daily follow up of the sites and of the requirements in order to achieve the works respecting the quality requirements

Following daily reports and operation process of machines

In charge of the coordination with Herrenknecht Agent for spare parts needed

Complementary Information

Nationality(s) :

Egyptian

Date of Birth:

20/12/1981

Language(s) :

English : 4/5; Arabic : 5/5

IT Skills:

Microsoft Office

Diplomas and Trainings

Year

2004

Faculty of engineering, electrical machines and power system dept., Helwan University

Trainings:

Automatic control course – Salesian Don Bosco Institute, Egypt

Plc course – Arab Contractors training institute, Egypt

Professional Experience

2008 – 2015 ARAB CONTRACTORS

[Saudi Arabia, Egypt]

03/2014 – Today – TBM General Foreman – Cairo, Egypt

Project:

Sewage Project in Cairo

Herrenknecht Slurry Engines; from 600mm to 2500mm

Main Responsibilities:

Management of 46 persons: 3 engineers, 3 operators (one/shift) and workers

12/2012 – 02/2014 – General Foreman for TBM – Jeddah, Saudi Arabia

Project:

Jeddah Sewage Project

10 Km tunnels for 1400mm, 1500mm, 1800mm and 2500mm tunnels

Client : National Water Company

Main Responsibilities:

Responsible for the tunnel operation

Following up the sites setup

Daily follow up of the quality requirements and supervision of works onsite

Follow up of the daily reports and operation process of machines

In charge of the coordination with the Herrenknecht agent for spare parts needed

02/2008 – 12/2012 – General Foreman, TBM Operator – Cairo, Egypt

Projects:

Al-Marg Project, wastewater project in Cairo: 130 meters under metro railway, under bridge, shaft and water pipes

Elkatamia project: -75 meters for 3200mm machine under the highway, crossing the ring road, passenger tunnel

Elfayoum Gerza project: - 130 meters, 3200mm machines, under highway, train railway and river

Menia project: -180 meters and -45 meters under rivers for 3200mm machines

Dar El Salam project: - 200 meters for 1500mm machines

Marg project 86 meters for 600mm machines

Elkatamia project : -70 meters, passenger tunnels, for 3200mm machine

Port Said: -160 meters crossing under the train railway for 3200mm machine

Elkantara Ismailia: -160 meters crossing under the highway road for 3200mm machine

Roxy Cairo: 3 tunnels each about 150 meters for AVN 1500mm machine.

Madii Cairo: -130 meters crossing under the metro railway for the 3200mm machines

Main Responsibilities:

Team Management

Site Manager and Operator for Tunneling Machines, especially for 3200mm AVN Machines (Herrenknecht)

ALJABER TRADING AND CONTRACTING

Contractor [Qatar]

02/2007 – 02/2008 – Electrical Maintenance, TBM Operator

Project:

Gharafa Water Project

About 2Km for water pipes jacking 800mm AVN machines

Client: Qatar Water Company

Project cost: 10M QAR

Main Responsibilities:

Maintenance and operation for 800mm machines

About 15 tunnels with 90m pipe jacking in rock soil each

ARAB CONTRACTORS

Contractor [Egypt]

2004 – 02/2007 – Electrical Maintenance, TBM Operator

Project:

Agamy, Alexandria Sewage Project

About 9 kilometers tunnels from 600mm tunnels to 1800mm tunnels

Client: The executive organ of the drinking water and sanitation

Project Cost: 200 million Egyptian pounds

o5 tunnels for 1000/1200mm AVN machines operation each about 100 meters

o6 tunnels for 1400/1500mm AVN machines operation each about 260 meters

o3 tunnels for 1800 mm AVN machines operation each about 260 meters.

o2 tunnels for 1000mm AVN machines operation each about 100 meters

Giza Project: 2 tunnels for 3200mm AVN machines operation each about 130 meters

Luxor Project: 1 tunnel for 2500mm EPB machines operation about 130 meters

Korimate Power Station: 1 tunnel for 2500mm EPB machines operation about 260 meters under the river

Dar El Salam, Cairo: 1 tunnel for 1500mm AVN machines operation about 320 meters

Main Responsibilities:

Electrical maintenance for the TBM machines, from 600mm to 1800mm machines

Operation for 600mm,1000mm,1200mm,1500mm,1800mm machines

Only Herrenknecht engines, with AVN Systems



Contact this candidate