Resume

Sign in

Civil Engineer

Location:
Baguio, CAR, Philippines
Posted:
October 22, 2018

Contact this candidate

Resume:

Paterson Kitma

PERSONAL DETAILS

KEY ATTRIBUTES

Qualification: Civil Engineer (PRC Reg No. 33411)

Hardworking & dependable

Can work independently and within a team.

Can work under pressure and

under varying conditions

Trustworthy

Computer literate

Affiliation: Philipppine Institute of Civil Engineers

Position : Member

Description

A Filipino, Christian, 57 years of age, married to Joyce A. Kitma and blessed with three children.

Permanent residence at Kitma Village, Bakakeng Central, Baguio City, Philippines.

.

Studied Civil Engineering at St. Louis University, Baguio City, Philippines from 1977 to 1982 and graduated on October 1982.

Passed the licensure examination for Civil Engineers given by the Philippine Regulation Commission in May 1983.

Contact information:

Email(company): ac7gfe@r.postjobfree.com

Email(private): ac7gfe@r.postjobfree.com

Mobile: +856 020********

Passport No.:EC3069139

KEY ACHIEVEMENTS

Project

Role

Achievements

2658-ASL Phase III Jetty Project, Batam, Indonesia

QA/QC Engineer

Effective coordination & implementation of the QC systems across all facets of the works .

2557-Proposed Marine Facilities for PT Oiltanking, Karimun, Indonesia

QA/QC Engineer

Effective coordination & implementation of the QC systems across all facets of the works including purchased items and subcontract works

Vale Iron Ore Transhipment Hub Jetty Project

Lumut, Malaysia

QC Inspector

Successful implementation of quality systems in the construction of the Vale Iron Ore Transhipment Hub Jetty

Theun Hinboun Expansion

Project,

Bolixhamsay, Lao PDR

Senior Site Manager

Completion and handover of the Nam Gnuang Powerhouse(Civil works) as per design and schedule.

Ambuklao HPP Rehabilation Project.

Benguet, Philippines

QA/QC Engineer

Active performance of duties in assigned tasks.

1080 MW NT2 Hydropower Project,

Khammoune, Lao PDR

QC Inspector

Successful implementation of Quality Systems

In the construction of the powerhouse structure housing 4x250 mw vertical shaft francis turbines and 2x40mw pelton turbines.

Bakun AC 70 MW Hydropower Project,

Benguet Philippines

Senior Site Engineer

Demonstration of active performance in meeting the goals of the project in assigned work.

Residential Housing Projects,

Koror, Republic of Palau

Project Engineer

Design, construction and supervision of middle class residential units in the Republic of Palau.

In-house mini-hydro power projects of Hydro Electric Development Corporation

Civil Engineer

Involved in the study, design and construction of various mini-hydro power projects in the Philippines.

PROFESSIONAL EXPERIENCE

November 2015 – July 2018

Poyry Energy Ltd

Title: Site Supervision Engineer

Project Name: Xayaburi Hydro Power Project, Lao PDR

Details

General supervision and inspection of all structural concrete works on site.

Closely monitor the safety performance on site and enforce improvement of unsafe working practices

Inspect surface treatment, dewatering, formwork, reinforcement, embedded item, waterstops and preparation of concrete lifts prior to concrete pours. When satisfied to review and sign concrete pours clearance forms.

Monitor, inspection of repair works, finishing and architectural works.

February 2015 – October 2015

PT McCONNELL Dowell Indonesia

Title: QA/QC Engineer

Project Name: 2658-ASL Phase III Jetty Project, Batam, Indonesia

Details:

Responsible for coordinating the implementation and maintenance of the project management systems.

Establish a system for quality control that will identify and confirm that the characteristics of work processes and the finished works meet the requirements of the design.

Effectively coordinate implementation of the QC systems across all facets of the works including purchased items and subcontract works.

Provide advice and support to the QA/QC Manager for the development, implementation, review and revision of the Project Execution Plan.

Coordinate on site quality assurance and control activities.

Control of non-conforming product procedures and practices.

November 2013 – February 2015

PT McCONNELL Dowell Indonesia

Title: QA/QC Engineer

Project Name: 2557-Proposed Marine Facilities for PT Oiltanking, Karimun, Indonesia

Details:

Responsible for coordinating the implementation and maintenance of the project management systems.

Establish a system for quality control that will identify and confirm that the characteristics of work processes and the finished works meet the requirements of the design.

Effectively coordinate implementation of the QC systems across all facets of the works including purchased items and subcontract works.

Provide advice and support to the QA/QC Manager for the development, implementation, review and revision of the Project Execution Plan.

Coordinate on site quality assurance and control activities.

Control of non-conforming product procedures and practices.

October 2012 – September 2013

McCONNELL DOWELL (Malaysia)

Title: QC Inspector

Project Name: Vale Iron Ore Transhipment Hub Jetty Project

Details:

Perform quality control oversights by conducting, reporting and documenting results of

inspections, monitoring, assessments and reviews of quality related activities off-shore such as .

but not limited to steel pile driving, in-situ concrete pile plugs and pile caps, precast beam and slab installation and in-situ reinforced concrete works.

March 2010 – May 2012

Theun Hinboun Power Company

Title: Senior Site Manager(Ng Powerhouse)

Project Name: Theun Hinboun Expansion Project

Details:

General supervision and inspection of all concrete works on site.

Closely monitor the safety performance on site and enforce improvement of unsafe working practices.

Ensure that the Owner’s requirements are implemented and followed by all parties involved and that contractors and other that have contractual obligations to documents and prove their adherence to fulfill their obligations.

Administration of independent testing with regards to concrete works, including sampling and review of laboratory results.

April 2009 – March 2010

McConnell Dowell Philippines, Inc.,( Civil Works Contractor)

Title: QA/QC Engineer

Project Name: Ambuklao and Binga Hydro Electric Power Plant Rehabilitation Project

Benguet, Philippines

Details:

Ensure that quality control procedures are implemented and each phases of the work.

Preparation and submission of site daily reports

Review of submitted drawings from the contractor.

Review of non-conformity reports and remedial measure report from the contractor and drafting of replies to such submissions.

conducting, reporting and documenting results of surveillances, inspections, monitoring, assessments and reviews of quality related activities as assigned.

Coordinate with the site team and Engineer’s representative for the inspection of the

different phases of the works to ensure that the works are done in conformance with the Employer’s requirements.

Ensure that quality control procedures are implemented and each phases of the work.

Feb 2006 – Dec 2008

Nishimatsu Construction Company, Ltd., ITD-NCC Joint Venture

Title: QC Inspector

Project Name: 1080 MW Nam Theun 2 Hydroelectric power project In Lao PDR

Details:

Quality control inspection and documentation of the Civil Works contract package 2(powerhouse, platform and ancillary buildings) for conformance with the contract requirements, documents and design concept. The powerhouse is to house 4 x 250MW Vertical Francis Turbine-Generator sets and 2x40MW six jet pelton turbines.

Coordinate with the site team and head contractor for the inspection of the different phases of the works to ensure that the works are done in conformance to the Employer’s requirements.

Ensure that quality control procedures are implemented and each phases of the work.

Issue non-conformances and follow through action plan, rectification procedures and close-out of same in accordance with the Employer’s requirements.

Sep 2005 – Feb 2006

Realeza Development Corporation

Title: Project Engineer

Project Name: Realeza Scenic view and log cabins and Calgryp Hills subd

Details:

Manage site operations for the timely development of a 10 hectare real estate property at Taloy. Sur, Tuba, Benguet (Realeza Scenic view and log cabins) and a 3.5 hectare middle class subdivision (Calgryp Hills subd. ) at Irisan, Baguio City

Dec 2004 – June 2005

HEDCOR, Inc. (Formerly Hydro Electric Dev. Corp.)

Title: Supervisor

Project Name: 42 MW Sibulan Hydro Power Project

Details:

Preparation of estimates, specifications and tender documents for the proposed 42 MW Sibulan Hydro Power Project located in Davao del Sur, Philippines.

Jan 2004 – May 2005

Self-Employed

Title: Civil Engineer

Project Name: Residential housing projects

Details:

Provide partime engineering services(estimates, preliminary studies of proposed mini-hydro and technical advices to AWIAI International, Inc.)

Design and construction of a three-storey residential bldg. Owned by Mr. & Mrs. Jess Perdigon.

Renovation and house improvement of Mr. & Mrs. Melody Daiz.

Design & Supervision of a three storey church building owned by Tuba Fundamental Baptist Chuirch.

Nov 2001 – Mar 2003

CTK Construction Company, Koror, Republic of Palau

Title: Project Engineer

Project Name: Residential/Commercial Building Construction

Details:

Design and construction management of residential & commercial building projects thru bank and private financing.

May 1997– May 2001

Transfield Philippines, Inc. (Turnkey Contractor)

Title: Senior Site Engineer

Project Name: 70 MW Bakun AC Hydro Power Project ( 1st BOT Hydro power project awarded by National Power Corporation)

Details:

Report defects as necessary and ensure repairs are undertaken as specified.and in compliance with the drawings and specifications.

Deputized as Transfield’s senior Bakun site representative during absences of the incumbent.

Oversee and coordinate construction activities at the Bakun weir site.

Manage subcontractor’s site operations and issue notices as required.

In conjunction with the site superintendent negotiate, award and control minor works of subcontractors.

Manage and disburse petty cash for Bakun weir site.

Feb 1986 – Apr 2001

Hydro Electric Development Corporation Beckel, La Trinidad, Benguet

Title: Construction Superintendent

Project Name: Various Mini-Hydro Power development projects

Details:

Assist in the gathering of field data required for the preparation of Bid proposal for the proposed 68 MW Tagoloan HEP.

Team leader in the negotiated contract for the design and construction of a 7-stage rope skyline system for the 70 MW Bakun AC Hydro Power Project.

Team Leader in the implementation of various in-house projects assigned such as :

a. 2400 kw Lower Labay Expansion project

b. Study, design and implementation of various system improvement works of the existing mini-hydro plants

c. Hauling & Erection of electrical poles & accessories for the 5 km –69 KV inter-tie transmission line on remote and difficult terrain in Bakun, Benguet.

d. Rehabilitation project of the Baguio Hydro Power Plants 1, 2 & 3 in Asin Tuba, Benguet.

e. 2400 kw Salangan Mini- hydro Plant in Salangan, Tuba, Benguet.

f. Road improvement of 12 km Wangal-Banengbeng road.

July 1985 – Dec 1985

Baguio Water District

Title: Hydro Analyst

Project Name: Improvement of Baguio Water System

Details:

Check and verify proposals made by the Local Water Utilities Administration ( LWUA )and design some of the civil engineering structures for the improvement of the water system of Baguio.



Contact this candidate