CURRICULUM VITAE
*.Family name: BAKEWELL
*.First names: Robin Thomas Keith
3.Date of birth: 14 March
4.Nationality: British
5.Civil status: Married
6.Education:
Institution
Open University, U.K.
Date: from (month/year) to (month/year)
09/1982 – 07/1986
Degree(s) or Diploma(s) obtained:
B. A., Mechanical Engineering & Maths
Institution
Garretts Green Technical College, UK
Date: from (month/year) to (month/year)
09/1963 – 07/1966
Degree(s) or Diploma(s) obtained:
ONC Mechanical Engineering
7.Language skills: Indicate competence on a scale of 1 to 5 (1 - worst; 5 - best)
Language
Reading
Speaking
Writing
English
Mother tongue
Bahasa Indonesia
3
3
3
8.Membership of professional bodies: Institute of Mechanical Incorporated Engineers
9.Other skills: Computer literacy
10.Present position: Consultant – Pump Specialist
11.Years within the firm: freelance, since September 2015.
12.Key qualifications:
40 years of experience as mechanical engineer for the water sector.
Design of pumping stations, water and wastewater treatment plants (WWTP).
Project Management.
Equipment installation and testing
Contract management for water treatment, water engineering, rehabilitation works, pumping plant, equipment and systems.
Project administration and management including contract programming, financial control and contractual administration.
Preparation of tender documents, drawing and details for contracts and projects in various countries.
Personnel management and training for operations and administration.
Comprehensive knowledge of all process plant from design to manufacture, procurement, installation, testing, commissioning, operation and training, elaboration of O&M manuals.
13.Specific experience:
Country
Date from - Date to
Uzbekistan
September 2015-December 2015
August 2013-January 2015
Egypt
April 2015-July 2015
July 1999-August 2012
Oct 1983-Sept 1989
Palestine
Sept 2003-August 2012
Jordan
Apr 2000-june 2012
Kenya
July 1998-January 1999
Cambodia, India, Indonesia, Jordan, Nigeria, Turkey
March 1995-January 1999
Zimbabwe
May 1997-July 1997
Qatar, Doha, Emirates
Mar 1979-Apr 1981
Nigeria
August 1993-August 1994
June 1978-September 1980
14.Professional experience record (projects)
Date from –to (month/year)
09/2015 – 12/2015
Location
Uzbekistan (Working from home Bandung, Indonesia)
Company
Scheladia Associates Inc.
Position
Consultant – Pump Specialist
Description
Improvements of Fergana Valley irrigation and drainage schemes.
Client: Ministry of Agriculture and Water Resources of the Republic of Uzbekistan.
Financed by: World Bank
Investment cost: 125 million US $.
Description: Rehabilitation of fourteen irrigation and drainage schemes in the Fergana Valley.
Duties:
Providing advice, layout and sizing for pump installations.
Preparation of costs and reports and assistance with proposal.
Assistance with preparation of contract documents.
Date from –to (month/year)
04/2015 – 7/2015
Location
Cairo, Egypt
Company
Dorsch International Consultants
Position
Senior Resident Mechanical Engineer
Description
Phase 2 of Part 2 Extensions to Gabal El Asfar WWTP
Client: Ministry of Housing and Reconstruction
Financed by: African Development Bank/ Government of Egypt
Investment cost:
Description: Extension to Gabal El Asfar WWTP Part 2 of Phase 2 for a total of 500 thousand cubic meters a day.
Duties:
Supervision and organizing of local mechanical / electrical staffstaff;
Examining Contractors equipment proposals;
Advising the Client on design issues.
Preparation of reports and project administration.
Date from –to (month/year)
08/2013 – 01/2015
Location
Tashkent, Uzbekistan
Company
Engineering Consultants (Private) Ltd, Sri Lanka
Position
Team Leader & Project Manager
Description
Rehabilitation of seven irrigation and drainage schemes in the Fergana Valley and the Zarafshan River Basin
Client: Ministry of Agriculture and Water Resources of the Republic of Uzbekistan.
Financed by: Asian Development Bank
Investment cost: 174.10 million US $.
Description: Rehabilitation of seven irrigation and drainage schemes in the Fergana Valley and the Zarafshan River Basin. With pumping capacities varying from 2 to 4 m3/second/pump total flows between 6 and 16 m3/second and total heads of 10 to 77 meters.
Duties:
Supervision and organizing of local and International engineering staff;
Administration of contracts;
Advising the Client on contractual and design issues.
Preparation of reports and contractual project administration.
Date from –to (month/year)
10/2010 – 07/2012
Location
Saudi Arabia
Company
Dorsch International Consults
Position
Mechanical Engineer
Description
Taif-Baha Water Transmission System
Client: Saline Water Conversion Corporation (SWCC)
Financed by: SWCC
Investment cost: USD 239 million
Description: Detail design of a water transmission system with the following characteristics:
Length ~220 km
Diameter DN1000
1 pumping station of 0.5 m /s, head 720 m
4 steel reservoirs (2 x 10,000 m , 15,000 m and 80,000 m ), tank (1,000 m ), water tower (1,500 m ), tap off station and related facilities (30,000 m )
Services:
Owner’s Engineer
Design Review
Review of Technical specifications, as built drawings, procedures for testing and inspection, operations and maintenance manuals
Site Supervision on all site works (civil, mechanical, electrical),
Coordination between SWCC (Riyadh and Jeddah) and site office
Duties: Adjudication of Contractors proposals.
Date from –to (month/year)
02/2006 – 07/2012
Location
Egypt
Company
Dorsch International Consults
Position
Project Management/Mechanical Engineer
Description
Helwan Wastewater Scheme and Helwan Wastewater Treatment Plant Extension
Client: Ministry of Housing and Reconstruction
Financed by: EU, Arab Fund, and local, Government of Egypt
Investment cost: EUR 45 Mill.
Services: Detailed design of the Helwan WWTP (population equivalent of 3 million, daily flow of 550,000 m3/d) on behalf of the main contractor under a design and build cost plus contract with CAPWO.
Process and hydraulic design, civil design, Mechanical & Electrical design
Follow up during construction
Monitoring of start-up tests and process performance
Preparation of operating manuals
Duties: Mechanical design: Preparation drawings and specifications. Adjudication of offers, inspection of equipment, on site supervision, testing and commissioning. Preparation of final design reports and operations manuals.
Date from –to (month/year)
03/2007 – 07/2012
Location
Egypt
Company
Dorsch International Consults
Position
Project Management/Mechanical Engineer
Description
New Cairo Water Transmission Project
Client: Arab Contractors (Osman Ahmed Osman) & Co., On behalf of The Construction Agency for Potable Water & Wastewater (CAPW)
Financed by: Government of Egypt
Investment cost: EUR 20 Mill.
Services: Detailed design of the mechanical and electrical works on behalf of the main contractor under a design and build contract with CAPW, financed wholly by the Government of Egypt through the Ministry of Housing.
In detail the services include the following components
Hydraulic design of the complete system from Booster PS #2 to the discharge at the WTP.
Surge analysis of the complete system from Booster PS #2 to the discharge at the WTP.
Mechanical & Electrical Design
Follow up during construction
Monitoring of start up tests and process performance
Preparation of operating manuals
Duties: Mechanical design: Preparation drawings and specifications. Adjudication of offers, inspection of equipment, on site supervision, testing and commissioning. Preparation of final design reports and operations manuals.
Date from –to (month/year)
06/2007– 01/2009,
Location
Jordan
Company
Dorsch International Consults
Position
Mechanical Engineer
Description
Upgrading and expansion of the Karak and Kofranjah Wastewater Treatment Plants
Client: J Ministry of Water and Irrigation (MWI), Water Authority of Jordan (WAJ)
Financed by: KfW Development Bank
Investment cost: EUR 22,4 Mill.
Services:
Engineering Review of existing documents
Preliminary Design of WWTP and hydro-power plant
Final Design and Preparation of Tender Documents according to FIDIC Red Book
Pre-Contract Services
Duties: Preparation of mechanical design, drawings and specifications.
Date from –to (month/year)
06/2007– 07/2012
Location
Yemen
Company
Dorsch International Consults
Position
Mechanical Engineer
Description
Water Supply and Sanitation in Provincial Towns Program II (PTP II) - Lot - 2: Project Town of Al Shehr
Client: Local Corporation for Water Supply & Sanitation Hadramout (Coastal Area) Al Mukalla
Financed by: KfW Development Bank
Investment cost: EUR 22,3 Mill.
Description: new water supply network (transmission 1.,9 km, distribution 88.9 km) sewerage network 47.4 km, 1,139 manholes, new WWTP Population Equivalent 28,000/ 60,000 PE in year 2017/ 2030
Services:
Basic investigations, review of Feasibility Studies and preparation of final design
Hydraulic modelling for water supply and sewer network
Preparation of tender documents based on FIDIC
Assistance during pre-qualification procedure
Tendering, evaluation and award of construction contracts (contract award pending)
Supervision of construction
Duties: Preparation of mechanical design, drawings and specifications.
Date from –to (month/year)
09/2003– 06/2006
Location
Palestine Territory
Company
Dorsch Wasser und Umwelt GmbH
Position
Project Manager/Mechanical Engineer
Description
Gaza Central Wastewater Project, Emergency Works (Rehabilitation of Gaza Existing WWTP)
Client: Coastal Municipal Water Utility, Gaza
Financed by: KfW Development Bank
Investment cost: EUR 10 million
Description:
The existing Gaza WWTP was extended with the following units: new screens, new grit & grit chambers, new anaerobic ponds, 4 new trickling filters for 60% of the inlet flow, a new trickling filters pumping station, new final settling tanks, new sludge stabilization ponds and new sludge drying beds, new laboratory equipment.
Services:
Identify measures to improve the on-going operations of the EWWTP for a population equivalent of approximately 700,000 PE,
Preparation of tender documents according to FIDIC Red Book
Assistance during tender process and contracting
Construction supervision
Review and recommend O&M staffing
Review the sludge management strategy for the EWWTP identify needs for facilities and equipment and recommend good operating practice for removal and disposal of sludge.
Identify deficiencies in the EWWTP operating budgets and recommend assistance measures to support the operation
Duties: Preparation of mechanical designs, drawings and specifications. Adjudication of offers, inspection of equipment, on site supervision, testing and commissioning.
Date from –to (month/year)
07/2002 – 03/2003
Location
Bonaire, former NETHERLAND ANTILLES
Company
Dorsch Consult Ing. GmbH
Position
Mechanical Engineer
Description
Sewage System Bonaire – Phase I,
Client: Department for Development Cooperation, USONA
Financed by: European Commission, 9th European Development Fund (EDF), Funds from the Netherlands managed by SONA, Funds from the Netherlands Antilles
Investment cost: EUR 25 million
Description:
Wastewater/ storm water collection system: 41 km new sewers, 6 vacuum stations, 1 Booster Station, 1,000 house connections, WWTP 10,000 PE (with nutrient removal and tertiary treatment)
Services: Phase 1 : master plan, feasibility study incl. new tariff system
Duties: Assisting with preparation of the mechanical design at feasibility level
Date from –to (month/year)
02/1999 - 12/2005
Location
Cairo, Egypt
Company
AMBRIC Consortium Employer Binnie Black & Veach, UK.
Position
Senior Resident Mechanical Engineer
Description
Greater Cairo Sewage Project, Gabal El Asfar WWTP
Client: Ministry of Water Egypt
Financing: USA, WB and Local
Duties: Installation supervision of mechanical plant. Preparing snag lists and resolving operational problems. Approving testing procedures, training manuals, as built drawings and operation and maintenance manuals.
Date from –to (month/year)
03/1995 – 01/1999
Location
Cambodia
Company
GKW Consult, Manheim, Germany
Position
Senior Resident Mechanical and Electrical Engineer
Description
Phnom Phen Water Treatment Plant Rehabilitation Study
Client: Cambodia Water Authority
Financing: KfW
Duties: Mechanical, electrical and instrumentation co-ordination; preparation of preparation of feasibility study.
Date from –to (month/year)
03/1995 – 01/1999
Location
India
Company
GKW Consult, Manheim, Germany
Position
Senior Resident Mechanical and Electrical Engineer
Description
Borehole water Supply Project
Client: Calcutta state water Authority
Financing: KfW
Duties: Mechanical, electrical and instrumentation co-ordination; preparation of mechanical tender documents; mechanical and electrical design.
Date from –to (month/year)
03/1995 – 01/1999
Location
Indonesia
Company
GKW Consult, Manheim, Germany
Position
Senior Resident Mechanical and Electrical Engineer
Description
Bandung Dye Factory Treatment Plant
Client: Water Authority of Indonesia
Financing: KfW
Duties: Mechanical, electrical and instrumentation co-ordination; preparation of tender documents; supervision of site construction.
Date from –to (month/year)
03/1995 – 01/1999
Location
Jordan
Company
GKW Consult, Manheim, Germany
Position
Senior Resident Mechanical and Electrical Engineer
Description
Ain Gazal Waste Water Pre Treatment Works
Client: Water Authority of Jordan
Financing: KfW
Duties: Mechanical, electrical and instrumentation co-ordination; Full works design and flow calculations; preparation of tender documents; supervision of site construction; preparation of final measurements and accounts; mechanical and electrical design.
Date from –to (month/year)
03/1995 – 01/1999
Location
Kenya
Company
GKW Consult, Manheim, Germany
Position
Resident Engineer / Mechanical and Electrical Engineer
Description
Kericho drainage and WWT Plant extensions
Client: Government of Kenya
Financing: KfW
Duties: Mechanical, electrical and instrumentation co-ordination; supervision of site construction; preparation of final measurements and accounts; mechanical and electrical design supervision.
Date from –to (month/year)
03/1995 – 01/1999
Location
Nigeria
Company
GKW Consult, Manheim, Germany
Position
Senior Resident Mechanical and Electrical Engineer
Description
State Housing Project
Client: Lagos Local Area
Financing: Local
Duties: Mechanical and electrical co-ordination; checking of tender documents and designs.
Date from –to (month/year)
03/1995 – 01/1999
Location
Turkey
Company
GKW Consult, Manheim, Germany
Position
Senior Resident Mechanical and Electrical Engineer
Description
Ankara WWTP
Client: Government of Turkey
Financing: KfW
Duties: Mechanical supervision of site construction.
Date from –to (month/year)
03/1995 – 01/1999
Location
Zimbabwe
Company
GKW Consult, Manheim, Germany
Position
Senior Resident Mechanical and Electrical Engineer
Description
Harari Water Supply
Client: Government of Zimbabwe
Financing: KfW
Duties: Preparation of mechanical tender documents and design for water pumping and distribution.
Date from –to (month/year)
11/1993 – 11/1994
Location
Katsina, Nigeria
Company
Parkman Consultants, UK
Position
Senior Mechanical, Electrical and Instrumentation Engineer
Description
Katsina State Water Supply
Client: Katsinat State
Financing: Local
Duties: Responsible for design of various M&E plant and layouts, production of specifications and drawings for international tender for Katsina State including borehole stations with booster stations and a complete 113 Mld treatment works; responsible for an indigenous electrical graduate and training of seconded Water Board staff.
Date from –to (month/year)
08/1980 – 10/1993
Location
UK
Company
John Taylor & Sons and Acer Consultants, UK
Position
Senior Mechanical Engineer/ Project Manager
Description
Various Small Works
Client: Wessex Water Authority and Severn Trent Water Authority
Financing: Local Authority
Duties: Co-ordination of works from design stage through to final commissioning; preliminary and detailed design; preparation of tender documents; tender evaluation; report and recommendations; contract supervision from award to completion; checking/approving machinery contractor’s design and drawings with supervision during manufacturing stage; inspection and testing of equipment at manufacturer’s works; supervision during installation, testing, commissioning and maintenance period.
Date from –to (month/year)
08/1980 – 10/1993
Location
UK
Company
John Taylor & Sons and Acer Consultants, UK
Position
Senior Mechanical Engineer/ Project Manager
Description
Box WWTP Extensions
Client: Wessex Water Authority
Financing: Local Authority
Duties: Co-ordination of works from design stage through to final commissioning; preliminary and detailed design; preparation of tender documents; tender evaluation; report and recommendations; contract supervision from award to completion; checking/approving machinery contractor’s design and drawings with supervision during manufacturing stage; inspection and testing of equipment at manufacturer’s works; supervision during installation, testing, commissioning and maintenance period.
Date from –to (month/year)
08/1980 – 10/1993
Location
Malaysia
Company
John Taylor & Sons and Acer Consultants, UK
Position
Senior Mechanical Engineer/ Project Manager
Description
Keluang WTP
Client: Government of Malaysia
Financing: World Bank
Duties: Supervision during installation, testing and commissioning.
Date from –to (month/year)
08/1979– 07/1980
Location
Kaduna, Nigeria
Company
Mekios Ltd, Nigeria
Position
Project Engineer
Description
Kaduna Housing Project; Jos Plateau Authority.
Client: Local Authority Kaduna and Jos Plateau
Financing: Local
Duties: Site supervision; Administration of projects in Northern Nigeria including client co-ordination; supply and installation of plant; training of local staff in operation and maintenance of plant manufacture and erection of Waste Water Treatment Plant.
Date from –to (month/year)
06/1977 – 08/1979
Location
Benin, Nigeria
Company
Mekios Ltd, Nigeria
Position
Project Engineer; Drawing Office Manager
Description
Warri Petroleum Training Institute;
Client: Local State Housing Authority: State Petroleum Institute Warri
Financing: Local
Duties: Producing required designs; project costing; assisting General Manager; site supervision; Administration of projects in Northern Nigeria including client co-ordination; supply and installation of plant; training of local staff in operation and maintenance of plant; administration of extensions; Design and details for manufacture and erection of Waste Water Treatment Plant.
Date from –to (month/year)
05/1976 – 06/1977
Location
UK
Company
John Taylor & Sons, UK
Position
Assistant Project Engineer
Description
Crawley WWTP extensions
Client: Crawley District Council
Financing: Local Council
Duties: Checking of contractors designs and information and coordination with the site and client.
Date from –to (month/year)
09/1972 – 05/1976
Location
UK
Company
William E Farrer Ltd, UK
Position
Assistant Project Engineer
Description
Projects throughout the UK
Client: Local Governments
Financing: Local Authorities
Duties: Design and manufacture of water treatment equipment Including Rotary scrapers, distributors, screens, submersible pumping stations and a design manual for a series of Contact Stabilisation Plants.
Date from –to (month/year)
04/1966 – 08/1972
Location
UK
Company
Donovan Electrical Ltd, UK
Position
Design draughtsman mechanical and electrical
Description
Projects thoughout the UK
Client: Local Government and Industry
Financing: Local
Duties: Design and manufacture of electrical controls and small components
15.Other relevant information (e.g., Publications): n/a