Curriculum Vitae

Name : Lukas Tuntelder

Current Position : Sr. Site Manager

Nationality : Dutch

Qualifications : Master degree M.Sc. in Electrical Engineering (RUG University)

Groningen (The Netherlands)

: Bachelor degree B.Sc. in Instrumentation Engineering at

Veendam (The Netherlands)

: High Voltage Certification

: Industrial Management

: Switch Power Competent

: VCA-VOL (Safety for Operational Supervisors)

Languages : English - Dutch – German

Status : Married

Home address : On Demand

Telephone : +31 (0)83 95 61 99

Email (Private) :


Primavera P6. Artemis Computerised Management and relational Database Systems (V 2000-6000-7000-9000) including Management Graphics and Artemis Schedule Publisher. Artemis Project Views. Novell Network administration. GS Cue. Lotus Notes 1-2-3 / Freelance. dBase III/IV. Project Manager Workbench. SPE. Timeline. MacDraw. Microsoft Word/Excel/PowerPoint/Project/Access, ProCoSys, SAP and other micro based Windows software.


Extensive international experience more than 25 years in, Project Management and Administration, Project Control and Planning, Commissioning, Maintenance, Information Management, Waste & Environment Management, Engineering, Operations, QA-QC, Civil, E&I, Piping, Mechanical, HSE.

Particular experience in the development and implementation of management information systems, project management procedures and related information.

Experience in contracting out and control of all major project phases from contracting strategies, pre-qualification programmes, tender document preparation, contract negotiation, award and administration to post contract and claims analysis.

Experience in GCC Countries with different nationalities.


Date : 2016 Present

Function: Site Manager LNG - Bio-Tech BV.

Project : Complete new projects in the LNG all over the World.

Budget : More than 3 Bilj. USD in various countries.

During the execution of project, the Site Manager (SM) I’m responsible for determining all requirements by identifying and working with stakeholders, researching historical data within the company and within the industry and forecasting future requirements. The SM will be employ others to execute the design, but will still retain responsibility for the results by monitoring status and directing the project. The SM will be responsible for coordinating the required activities of company and contractor personnel to insure the successful completion of major projects.

The overall scope covered all the work necessary to engineer, design, procure, construct and pre-commission the LNG plant.

The Plant facilities comprise two LNG trains, each of 300 tonnes per hour or 2.4 mtpa LNG production capacity, along with LNG storage and loading facilities, a flare system, LNG transfer facilities, sulfur handling/loading facilities and associated utilities and offsite facilities.

The contract between the Owner and Contractors was a fixed lump sum type contract valued at approximately US$ 3 billion. The contract called for package-wise completion and the Plant Hand Over (PHO) of the facilities listed below, and attendant liquidated damages for delay in turning over each of the packages.


To administer project procedures, programme discipline workloads, lead a team of professionals from all disciplines to complete the project by complying with scope of work and Specifications and provide technical advice and support in developing and coordinating the required studies.

Represent the company in meetings with the client and present them with the documents related to meetings.

Attend and coordinate weekly and monthly Site meetings.

Control the flow of work controlling documents.

Ensure that project activities comply with company, Owner and Scope of Work requirements and support overall engineering & construction schedule.

Coordinate and interface with various agencies including Third Party agencies, vendors etc, during different phases of the project,i.e. from commencement the project through to handover and close out.

Evaluate data as to scope, effects on exiting installations, economic value, range planning and budgetary considerations.

Resolve in all technical related specifics, provide Solutions to technical issues, provide technical support, to resolve and provide solutions related to interface with various departments related to QA/QC, HSE, Estimation, Planning, Electrical, Instrumentation, Mechanical, Civil etc.

Ensure project team have a clear understanding of contract and applicable obligations.

Monitor and evaluate the work of Engineers and drafting staff allocated to specific projects to ensure that their technical competence and performance meet requirements.

Set targets and goals to achieve the scheduled objective.

Identify, plan and set priorities so that the scheduled target can be achieved well in advance.

Coordinate and interface with various departments to identify the lag in schedule and advise corrective measures.

Supervise the preparation of feasibility studies, surveys and reports, design drawings, specifications, bills of materials and cost estimates.

Coordinate between various engineering departments to maintain prioritization within project schedule and to achieve project milestones with respect to project schedule.

Contribute directly to the resolution of technically difficult design problems and Consult with engineering management to resolve policy and labour issues.

Manage vendors and contractor interfaces.

Maintain Project delivery as per schedule.

Interpret and raising issues regarding the implementation and constructability of design.

Interpret and raising issues regarding the implementation and constructability of estimates.

Prepare Daily, weekly and Monthly progress against current project schedule and submit it to the authorities concerned.

Monitor, manage and ensure the change control.

Monitor and track delivery packages and design packages against current plan.

Identify the Project work which can be started as per the documents available and Support the concerned department.

Write work procedures, ITPs, raise RFIs and prepare Punch List.

Plan and Support the various phases of the construction by providing Technical Advice and Construction Methods.

Estimate accurate cost management in line with project requirements.

Identify grey areas i.e. areas of concern and provide inputs and plan to solve the issues.

Act as a Mentor, support and guide Personnel’s and if required provide necessary Training for their development.

Complete the Project work by complying with all statutory corporate and legislative requirements and procedures

Guide the documentation department in filing, preserving and maintaining the documents in order for quick access and avoiding confusion.

Maintain the Quality and Safety Standards complying with the project contracts and Scope of Work.

Ensure successful handover of the Project.


Date : 2014 – 2016

Function: Project Manager F&G upgrade for Total E&P Borneo in Brunei

Project : Fire & Gas Upgrade Total plant Brunei

Budget : 4,5 Milj. Euro

Works as a Sr. Project Manager for of a Fire and Gas upgrade (EPC) on a plant of Total in Brunei.

Manage, direct and co-ordinate all projects/sites activity with responsibility for the execution of the project in compliance with all contractual requirements, ensure that resource usage is optimised to achieve, or exceed, Company's projected profit margins. Occasionally leads proposal preparation efforts.

Co-ordinate the work of the mobilisation team to ensure that all necessary activities are reviewed with actions appropriately assigned, timescales agreed and relevant parties briefed with new communication

channels established where ever necessary.

Co-ordinate, in conjunction with the Project Management Team, the development and establishment of the project planning package together with the mechanisms for monitoring subsequent progress against that plan. Ensure that corrective action is agreed and implemented at the appropriate level as and when variations from plans occur.

Review Safety and QA/QC project plans with respective functional heads and submit to client for approval.

Resolve any contractual/legal matters and ensures that appropriate action is taken which does not

Compromise nor expose Company to unnecessary risk

Maintain under regular review, the demobilization plans of the workforce and plant as the project progresses in order to facilitate the relocation of the workforce and the further utilisation or disposal of plant

Act as the Company's official representative with clients, suppliers, partners and third party contractors negotiating terms and conditions where necessary, ensuring that Company interests are both optimised

and protected.

Monitor performance of suppliers and subcontractors to determine compliance with contractual obligations.

Resolve issues arising from disputes or sub-standard performance.

Monitor payments from clients and initiate payments to suppliers and sub-contractors ensuring all terms and conditions have been met.

Provide commercial and technical input for the Contracts Department at the estimation stage, when requested, ensuring that adequate provision is made for all proposed activities.

Carry out any other activities as and when required by the direct supervisor.

Date : 2013 - 2014

Function: Engineering Coordinator / Project Manager GLT-Plus / NAM

Project : Underground Storage Plant

Budget :

Working as Project Coordinator/Manager for GLT-Plus/NAM (Shell) on the location Norg in the Netherlands.

The intention is to install a multi-disciplinary Engineering team on site during Norg Construction phase.

With the intention to support the construction disciplined by clarifying technical queries and or

uncertainties in the final issued RFC package so planning disturbance can be kept to a minimum during

the actual Construction execution.

Short communication lines between Engineering disciplines and Construction incl. SiteReps and

Construction NAM discipline.

Initiate / Decide on/Execute changes in case required as per GLT-Plus management system.

Do regularly checks per discipline on Construction work package to ensure red/blue (as built) input on all relevant documents, including assistants checks.

Monitoring of all issued TQ’s, FEI’s and site related ECR’s and NCR’s.

Coordination Engineering Construction + NAM SiteRep to communication scheme.

Support execution construction.

The FEC shall be appointed who shall be overall responsible for the actual approval of all proposed

(multi-disciplinary) changes, to avoid nice to have actions and unnecessary delay in construction planning.

The appointed FEC will discuss all forwarded changes with the applicable disciplines to ensure that the

initiated change is mandatory and that all disciplines are aware of the required input expected from their discipline.

Furthermore the FEC will ensure that all major changes which have cost or schedule impackt are communicated with the PM of the respective scope.

Monitoring of the actual TQ’s will be done via Enovia.

FEI’s local with amount of max. € 125.000,- (signed by the FEC).

The Site Engineering Team will take spot checks per discipline during the complete construction period,

to assure that changes made to the final RFC issued discipline documents are marked up as indicated on the applicable TQ’s / FEI’s.

Interaction with NAM concerning design changes can only take place via the FEC.

Responsible for assisting in review of detailed design documentation where required in conjunction with the relevant Field Engineers with particular emphasis on E&I/Civil/Mechanical/Piping technical issues.

Assist and ensure coordination of all activities with the other specialists within the project team.

Manage and Coordinate the As built Documentation Review.

Manage the resolution of Punch List items raised from Construction / Pre-commissioning / Commissioning of all the teams that are assigned to Engineering.

Hold regular progress meeting with both Construction Contractors and Discipline Engineers of Electrical, Intrumentation, Mechanical, Piping, Civil and HSE to chase outstanding as built documentation and drawing reviews.

Provide input to the Field Engineering for progress reporting, highlight critical problems and propose corrective actions.

Provide support to construction and commissioning for activities.

Date : 2011 - 2013

Function : Sr. Engineer / Project Manager for Tebodin

Project : Various Projects

Budget : Various

Working as a Sr. Project/Construction Manager for Tebodin in Oman for various projects of different costumers e.g. PDO, Orpic and OGC.

Participate in the planning and schedule of the scope of engineering for the projects and provide inputs for the project technical document register and procurement register.

Ensure that the Engineering team lead engineers adequately address the project’s manpower requirements by coordinating with the engineering discipline supervisors.

Monitor the engineering progress, address shortfalls, develop recovery plans where required and ensure plans made are implemented.

Provide feedback to engineering discipline supervisors as and when required on the progress.

Ensure that engineering deliverables generated by the project engineering team meet the project requirement in terms of technical content and follow project specific procedures such as the engineering plan, quality plan, document numbering and levels of approval.

Ensure participation of the engineering team members in project engineering reviews and assist resolution of any issues arising out of the same.

Perform checks to ensure that the procurement specifications generated by the engineering team are completely in line with project specifications with no discrepancies.

Coordinate with the procurement team on the requisitioning process and follow through for bid evaluations, approve technical bid evaluations and complete the purchase requisitioning.

Participate in pre-order bid meetings with vendors from the engineering point of view.

Attend kick-off meeting after order award and participate in vendor design review as required.

Provide assistance as and when required in the associated reports are compiled and distributed accordingly.

Ensure that interface items between disciplines are addressed by the project engineering team and seek

management advice and assistance where required.

Identify with the engineering team potential areas of variation that may arise during the course of engineering for the project and communicate the same to the project management team to ensure its


Provide inputs to discipline supervisors on areas of attention required while estimating for a proposal based on the variations encountered in the project.

Assist the project team lead engineers of the department Electrical, Instrumentation, Mechanical, Piping and Civil in their interactions with the client counterparts as required during the project execution.

Interact with interface between the engineering team and the Project management team and ensure

smooth transfer of information between the two.

Evaluate team performance and communicate with team members on areas of excellence as well as areas of improvement.

Perform related duties as and when directed by Direct Supervisor.

Date : 2010 - 2011

Function : Project Maintenance & Commissioning Manager for Esso / Exxon Mobil

Project : FPSO Esso/Exxon Mobil Luanda (Angola)

Budget : 375 Milj. Euro

Project Maintenance & Commissioning / Pre-Commissiong for Esso / Exxon Mobil (FPSO) in Luanda

(Angola) as head of the Maintenance & Commissioning department incl. Project coordinate and Planning.

Reporting to the Project Manager, and responsible for Maintenance & Commissioning activities during all phases of the contract.

Prepare independent evaluations of the project status based on interpretation of reports and own team’s experience based judgment.

Analyzes project schedule progress and performance and identifies developing problem areas.

Analyzes critical path and restraints to determine the effect of changes to the schedule.

Advise management of risks that may affect project profit, costs, schedules and client relations.

Support the Project Management team from various departments in maintaining timely and effective change management processes, procedures and systems.

Supports the project team in the development and maintenance of any periodic (daily, weekly, monthly) status reports to keep management and/or owner informed on the project progress. These reports may

include labor productivity, schedule status, financial analysis, Cost Performance Reports (CPR) and

earned value curves reports on either direct or indirect engineering/construction activities that are a part of the work.

Supervise Project Maintenance & Commissioning Engineers in the development of Project Budgets and Estimates.

Prepare standard earned value-based reports, including schedule updates, Cost Performance Reports (CPR) and earned value curves.

Coordinate with Construction Project Controls personnel in the development of Project Controls information (construction schedules, cost), and incorporation of data into the overall project cost & schedule reports.

Date : 2009-2009

Function : Project Planning & Controls Manager Project Gulf Fluor (Office Manchester)

Project : 4269C Fluorine Complex from Gulf Fluor in Abu Dhabi

Budget : 26,2 Milj. Pound Sterling

Project Planning & Control Manager for Gulf Fluor in Abu Dhabi, UAE.

Project Planning & Control for the New Project (Aluminium Plant) in Abu Dhabi (UAE) as head of the Project Planning, coordinate planning with a total crew of 150 men.

Based in Manchester (UK) and reporting to the Vice President, and will be responsible for the Planning &

Control Department, supported by a team of experienced Planning & Control Engineers working across numerous projects at various stages of development. And work in close liaison with the other heads of departments including design, development, commercial and delivery as well as international external consultants, project management companies.

Update relevant databases (P6) with project plans (e.g. Plan Forecast Date) regularly and on time; and audit the project plans info/data to ensure accuracy and quality.

Date : 2008-2009

Function : Project Controls Manager E&I Sharq, Al-Jubail Saudi Arabia

Project : Sharq 3rd Expansion Project PE Plant

Budget : 22,7 Milj. Euro

Project Control Manager for Sharq in Al-Jubail, Saudi Arabia.

Project Control for the New Project (Polyethylene Plant) in Al-Jubail (Saudi Arabia) as head of the Project Controls (E&I) group, coordinate control, planning and coordination with a total crew of 1400 men.

Provide leadership to planning engineers, schedulers and cost engineers to plan, monitor, and control the execution of the project within the time and budgetary parameters, optimizing resource utilization.

Responsible for the planning, scheduling and monitoring of the project on a continuous basis through

work schedule, progress measurement and reporting systems ensuring smooth implementation of the project. Cost/Delivery Impact situations are reviewed by the supervisor.

A) Develop systems and procedures for Project control functions on the onset of the project and as there are additional requirements from the client in order to facilitate the process of monitoring progress.

B) Plan and schedule the project by developing a project master schedule in line with the proposal

requirements of the project deliverables, milestones and required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system.

C) Guide the project planning team to develop and install the project controls procedure, project schedule and reporting system specific to project.

D) Prepare the progress measurement system such as manpower histograms, which indicate the number of people required each month, progress S curves which will indicate the progress that the project makes at a given point of time ect, which are reviewed at periodic intervals.

E) Implement the work schedule and monitor progress of the work for timely execution of the project through monthly reports with respect to review of the overall project, and progress monitoring of specific projects on a regular basis. Anticipate and resolve any problems, bottlenecks/scheduling conflicts. Prepare and maintain project schedules and monitor progress to achieve on time or earlier deliveries to keep the project on schedule.

Date : 2006-2008

Function : QA-QC Manager E&I – Jacobs Engineering / Borealis South-East Germany

Project : PP6 Project

Budget : 107 Milj. Euro

QA- QC Manager Jacobs for Borealis (Germany)

Quality-management for the New Project in Burghausen (South-East of Germany) as advisor of the Project Quality (E&I) group involved in all aspects of central and de-central project quality, control and planning, including interface co-ordination, trending and early warning analysis, cash-flow forecasting and the support in the implementation of integrated information systems.

Involved in the preparation of Quality Management for Business Development Projects and Information Projects within the Systems Development Cycle of Borealis.

Managing Company and Third Party QC inspection surveillance activities for remaining equipment and material deliveries,

- Coordinating notification and scheduling of company personal attendance at FAT’s

- Reviewing acceptability of Contractor and Subcontractors method statements,

- Monitoring and report on the effectiveness of the controls applied by Contractors and

- Subcontractors for equipment receiving, preservation and alignment, mechanical completion.

- And pre-commission (Check records in ProCoSys for commissioning)

Date : 2004 - 2006

Function : Project Engineering Superintendent - Assignment Total and Shell

Project : Refinery’s Project Burner Safety

Budget : 16,5 Milj. USD

Making Estimate, Scope of work, Requisition, instrumentation index, bid tabs and

datasheets for optimise and automate concerning the TOTAL and Shell Refinery site,

comply with European regulation (codes and standards).

Performing complex cost control activities and/or supervising the preparation of execution activities for the project.

Develop work breakdown and project coding structures for control and integrity of work defined by the contract.

Under the direction of the Project Director, managing the Project Control Department comprising contract administration, claims, planning, cost and document control on a major electrical and instrumentation

projects to ensure achievement of the project mission and goals and be responsible for all day-to-day activities within the department.

Date : 2002 - 2004

Function : Project/Construction Manager - Mobilgas Nigeria – (Lagos)

Project : Gas Injection Turbine Power Plant Project.

Budget : 350 Milj. USD

Under the direction of the Project Director, managing the Project Construction Department.

Control of construction, contract administration, claims, cost and document control on a major

gas injection power turbine projects to ensure achievement of the project mission and goals and be responsible for all day-to-day activities for the execution of the construction.

Responsible of the technical (field)budget.

Responsible for ensuring that all project deliverables related to the Department are made in

good time and comply fully with the requirements of the Sub-Contract.

Responsible for all disciplinary activities included safety on the power plant.

Responsible for directing the respective heads of the Contract Administration, Claims, Cost, implementing and monitoring contract administration for the joint venture.

Responsible for the substations of the power plant and Co-ordinate with the Procurement, Engineering Manager to ensure the smooth flow of documentation necessary for the Department to operate in a fashion whereby the joint venture rights and entitlements are protected to their maximum. Preparing reports as required by the construction team for Electrical, Instrumentation, Mechanical, Piping, Civil and QA-QC departments and clients. The preparation of an integrated corporate project of a detailed requirements specification and project proposal for programming, implementation and training. Involved in the preparation of a functional design specification and the unit design and coding for a fully integrated project management information system for a major power project and associated distribution network within Nigeria.

Date : 1999 – 2002

Function : Planning & Controls Manager – NLNG Nigeria

Project : NLNG2 Bonny Island (Refinery/LNG)

Budget : 550 Milj. USD

Responsible for all aspects of cost control, planning, contract administration and co-ordination, budgeting, financial reviews and cost appraisals for a major EPC and onshore installation contract for the Liquefy field development, producing 7 million Nm3/d gas.

Involved in all aspects of project control, planning, cost management and financial administration for two biggest plants for the production of Liquid Gas facility.

Co-ordinate the project team reviews followed by an approval and review by the client of the work schedule, progress measurement and reporting systems.

Develop systems and procedures for Project control functions on the onset of the project and as and there are additional requirements from the client in order to facilitate the process of monitoring progress.

Review status reports, modify schedules and plans as required and keep the management and Project Director apprised of the progress on a regular basis.

Ensure that field project controls document such as resources histogram, schedules, reporting systems, material control systems, ect are fully developed by the designated personnel and reviewed by Construction Manager and that E and P interfaces are properly addressed.

Date : 1996 - 1999

Function : CONSULTANT - Assignment to Shell Internationale Petroleum Maatschappij (SIPM)

Involved in the preparation of a study for the adjustment of financial authority levels and the balance of


Preparation and presentation of concepts of a regulatory documentation system, including the development of the functional specification and database design.

Preparation of quality plans for setting out specific practices and activity scope definitions together with

the identification of key quality activities for the integration into major project developments.

Involved in the preparation of a cost data bank structure and cost estimating methodology, including compilation of cost data and provision for a cost engineering manual and specification for cost database computerisation including training and awareness courses.

Involved in preparation of contracting out guidelines and control methods including all major project

phases of project execution.

Contracting out experience reaches from the preparation of contracting strategies, pre-qualification programmes, contract and tender document preparation, contract evaluation,

negotiations and clarification of contract terms both during pre and post contract award. Follow up work involving all aspects of post contract and claims analysis for the following major offshore development projects of the NAM:

● F3-FB field development consisting of the construction of a 4 leg 24 slot wellhead platform, production facilities, 240 km sea and land pipeline and onshore treatment facilities

● L13-FC development producing 6 million Nm3/d gas

● K12 development producing 14 million Nm3/d gas

Date : 1992 - 1996

Function : Superintendent Shell Pernis (Rotterdam)

• Provide on-site administrative & technical management of the construction activities on a refinery construction project in Rotterdam.

• Supervise the I&E, Civil, Piping and Mechanical construction effort to ensure project is constructed in accordance with design, budget and schedule.

• Assist with the implementation of safety programs and provide direction to planning, scheduling, and engineering functions as required.

• Supervise instrumentation and electrical oriented craft employees and/or other contractors as required by the contract.

• Work with Subcontractors of Civil, E&I, Piping, Mechanical daily to ensure that the project is constructed & documented in accordance with the project specifications, policies, detailed drawings & industry standards.

• Plan, coordinate & supervise on-site functions (scheduling, engineering, material control, and may provide day-to-day direction of on-site administrative staff).

Supplementary – Lukas Tuntelder

1.Key Skills

- Project Management

- Construction

- Project Execution

- Site Execution

- Project Control

- Procurement

- Contract Management

- E&I, HSE, Civil, Piping, Mechanical, QA-QC

- Construction Management


- Quality Management

- Commissioning

- Waste & Environment Management

- HAZOP skills

- Project/Operations Management

- Plant operations and maintenance knowledge

- Cost Risk analysis

- Budgeting & cost control

- Project Planning

- Experience with HV (220KV) / LV substations

- ATEX Experience

- GCC Experience

1. HSE Management:

a)Ensure that HSE requirements are documented and understood by all project participants

b)Compliance with HSE procedures

c)Maintain HSE focus for project duration

2. Client Relationships:

a)Identify, document and communicate the client requirements

b)Effective management of multiple stakeholders

c)Maintain and build healthy client