|
Resume alert |
Resumes 11 - 15 of 15 |
Lakeland, FL
... AutoCAD Elecrtical, AutoCAD and Solid Works 2015 to design custom bromine batteries to be used for back up power and to be integrated with the power grid, solar and wind generators to provide the customer with a wide range of energy options. ...
- 2016 Feb 08
Auburndale, FL
... Currently finalizing the Osage Wind Project in Oklahoma of 150 MW’s of GE 1.7 Wind Turbines project. PROCUREMENT MANAGER & FIELD PROJECT ENGINEER White Construction Inc. (Sept, 2012 – May, 2013) Located in Brooksville, Fl on a temporary contract ...
- 2015 May 31
Brandon, FL
... developed a global singular process for Dresser- Rand building virtual factories using the cost estimating tool named aPriori to make all major future business decisions for all product lines (Steam, Gas, DATUMs, Compressors, Solar, Wind, Turbines). ...
- 2014 Jul 24
Lakeland, FL
... I directed the installation of wind turbines manufactured by Siemens, Gamesa, Clipper, GE, and Vestas. The project names were Kawailoa Wind, Laurel Hills Wind, Windstar Wind, Prairie Winds, Minot Winds, Milford Corridor Project, Fowler Ridge Project ...
- 2012 Aug 10
Winter Haven, FL, 33884
... structural composite lumber and prefabricated I-Joists) Design practices for metal plated wood trusses per ANSI/TPI 1-2007 Wind loading, snow loading and live load reductions per ASCE 7-05 IBC (International Building Code) and FBC (Florida Building ...
- 2010 Aug 13