Post Job Free
Sign in

Project Quality Control

Location:
Lakeland, FL
Salary:
60000
Posted:
August 10, 2012

Contact this candidate

Resume:

Craig Mazurowski

*** ********* ****** | Auburndale, FL 33823

Phone: 863-***-**** | Email: idz3kz@r.postjobfree.com

Highly motivated and determined individual seeking a challenging position

to contribute to the employer's further success

Qualifications Profile

. Expert in maintenance of mechanical operations with more than 13 years

of experience in construction management and material control

. Outstanding organizational, leadership, and management skills with

capability to motivate and drive technical teams to achieve

performance excellence and exceed expectations

. Efficient, dedicated, and dynamic person with proven ability to

complete tasks and meet deadlines

. Regarded for the ability to excel in dynamic, fast-paced, challenging

work environments

. Competitive team player who consistently strives to contribute to

overall performance

. Excellent in computer, oral and written communication skills

Core Skills and Competencies

Management | Operations Management | Troubleshooting | Procurement/Material

Control | Lift plan planning | Quality Assurance | Personnel Training |

Contract Management

Professional Experience

Tower Erection Superintendent/Material Logistics Manager

2007-Present

RMT Inc.

I directed the installation of wind turbines manufactured by Siemens,

Gamesa, Clipper, GE, and Vestas. The project names were Kawailoa Wind,

Laurel Hills Wind, Windstar Wind, Prairie Winds, Minot Winds, Milford

Corridor Project, Fowler Ridge Project, and Benton County Windfarm. I

Performed various tasks that involved cranes and erection, lift plan

planning and writer, preparation of construction documents, safety

programs, subcontractor dealings, material purchasing, scheduling, project

budgeting, NOTAM/FAA compliance, project development, quality control,

change orders, and certification of completion. Served as liaison to

subcontractors to coordinate meetings, negotiate labor costs, and plan

expenses of project materials. I also managed a contractor team composed of

100+ crew members including trade workers.

. Recognized for the exceptional project management that enabled Milford

Wind Corridor Project to win the renewable project of the year award

. Acknowledged for the ability to fulfill multiple, challenging tasks

with the highest service and professionalism through an award for

Ownership and Follow Through from the Fowler Ridge Project

. Generated profitability for RMT through successful completion of all

projects

Material Control Coordinator/Instructor/Construction Advisor/Field

Technician 2003-2007

GE Energy/Penpower USA

Ensured that spare parts were acquired on time to avoid delays and

interruptions. Coordinated site transfers of spare parts while mediating

issues and problems. Provided training through the establishment of a core

curriculum, PowerPoint presentations, and application scenario discussions

for material control/receiving. Instructed as well as recommended students

who attended material control classes. Directed technical operations of

construction and electrical contractors. Supervised root cause analysis

during installation and commissioning. Managed turnover books in

preparation for presentation to customers upon completion.

. Organized the procurement of spare parts for more than 25 O&M sites,

both domestic and international

. Performed solutions to punch list items that varied from bolt

tensioning to new component installation prior to turnover

. Implemented the Installation Inspection Procedure (IIP) during the

turnover of wind turbines

Machinist Mate 2nd Class

1999-2003

United States Navy, USS IWO JIMA

Oversaw the research and development of quality control processes.

Maintained the appropriate use of parts and materials utilized for steam

plant equipment. Ensured that specifications for maintenance and

cleanliness are met for plant operations. Implemented strict compliance to

protocols to retain system certifications. Documented work retesting to

guarantee that the billion-dollar platform achieved its operational

commitments.

. Recognized for the outstanding mechanical aptitude and troubleshooting

skills on both system and component levels

. Provide exceptional repair services above normal scope of capabilities

Education and Training

3D Critical Heavy Liftplan (Certification)

2012

Installation and Receiving of Wind Turbines | Tehachapi, CA

2004

Steam Generator Maintenance (Vocational) | Norfolk, VA

2002

Force Draft Blower Maintenance Training (Vocational) | Norfolk, VA

2002

Onboard Maintenance Training (Vocational) | USS IWO JIMA

2002

Advance Shipboard Firefighting (Certification) | Norfolk, VA

2000

Boilerwater/ Feedwater Chelant Basic (Certification) |Norfolk, VA

2000

Distilling Plant Operator (Vocational) | Norfolk, VA

2000

Hydraulic Systems and Components Basic/Vocational | Norfolk, VA

2000

Shipboard Propulsion Fuels/Oils/JP-5 Systems and Testing (Vocational) |

Norfolk, VA 2000

General Shipboard Firefighting | Norfolk, VA

2000

Machinist Mate Class "A" School | Great Lakes, IL

2000

Recruit Basic Training | Great Lakes, IL

1999

Proctor Sr. High School/GED | Utica, NY

1997

References available upon request



Contact this candidate