Al Dafna, Qatar
... Design to Mechanical Process Design of Pumping Stations and water and wastewater treatment including pipe sizing calculations, expert in design of odour control unit and chlorination system etc Design and selecting the required capacity of the ...
- 2020 Oct 01
Doha, Qatar
... and networks, Irrigation Controller, Pipe connection from TSE line to the distribution chamber, wastewater system and pumping station, surface and ground water drainage system), Construction for High Rise Building and Civil Engineering Projects. ...
- 2020 Aug 06
Fereej Ibn Dirhem, Qatar
... Revamping Of Wastewater Treatment Facility in Ethylene Plant 2. EPPC Of Water Treatment Plant Power Distribution and Control System (Qatar Petrochemical Company-QAPCO-Mesaeeid) Responsibilities • Ensuring the work is done safely in accordance with ...
- 2020 Jul 21
Fereej Ibn Dirhem, Qatar
... (April 2020 – Current) Responsibilities: Operating sewage treatment processing, and disposal equipment in wastewater treatment plant to control flow and processing of sewage: Monitoring control panels and adjusts valves and gates to regulate flow of ...
- 2020 Jul 21
Fereej Ibn Dirhem, Qatar
... studies, site assessment, greenhouse gas inventory, sustainability strategies for green building design, environmental sample analysis, Laboratory safety management, Hazardous waste management, risk assessment & industrial wastewater treatment. ...
- 2020 Jul 16
Fereej Ibn Dirhem, Qatar
... May 2006 - Jun 2007 Site Environmental Engineer e-Green System Private ltd India Site visit to the plants and solving the practical issues in wastewater Treatment plant. Wastewater treatment plant (O & M) Process. Co-ordination with Execution team ...
- 2020 Jul 09
Qatar
... Air, Wastewater, Solid waste etc, and subsequently for its ISO-14001 certification. I have also been instrumental in getting EMS certification for 3 refineries of Kuwait National Petroleum Company. Currently, I am working in KOC, exploration & ...
- 2020 Jul 02
Fereej Ibn Dirhem, Qatar
... Projects Information: Project Duration Name of the Project: Qatar Integrated Master Plan Project Position Held: Sept 2012 – May 2016 Client: Public Works Authority (ASHGHAL) GIS Specialist Project Description: Calculating ground water/wastewater ...
- 2020 Jun 30
Fereej Ibn Dirhem, Qatar
... ISKI, ISTANBUL WATER AND WASTEWATER MANAGEMENT AUTHORITY GENERAL DIRECTORATE Istanbul, Turkey April 2005 – November 2014 Resident Engineer, Control Engineer ISKI is the biggest water supply, storage, distribution and infrastructure company in Turkey ...
- 2020 Jun 21
Fereej Ibn Dirhem, Qatar
... February 2014 – May 2018 Project Scope:- EPIC for Qatargas Waste Water Recycling and Reduction Project using Membrane Bio-Reactor (MBR) Technology for treatment of wastewater. Ras laffan Industrial City (RLIC) Responsible for all the Health, Safety ...
- 2020 Jun 15