... Industrial Wastewater Disposal Project for Saudi Aramco Riyadh Refinery. Apr 2000 & Apr 2002 Major Shutdown of the Saudi Aramco Riyadh Refinery. Total Complex Turn Around 1998 (TCTA 98) Shutdown for Ibn-Zahr at Al-Jubail May 2004, Apr 2009 & Apr ...
- May 08
Al Dafna, Qatar
... (interim) - Civil Responsibility : Coordinating and executing civil part of the project for the various civil construction activities for wastewater treatment plant, pipeline work, long distance high voltage cable installation work etc. ...
- May 07
Al Dafna, Qatar
... Advised and assessed water and wastewater staff, which overhauled efficiency and saved costs by 20% in municipal water and sewer projects. Applied international regulations for site survey and selection of the first nuclear power plant in Jordan, ...
- Apr 25
Al Dafna, Qatar
... Ground water reservoirs, Worked on projects associated with storm water & drainage, flood alleviation, wastewater networks and water distribution networks JEZAN City 20. Construction of Elevated water tanks, Portable water Network, TSE Pumping Main, ...
- Mar 13
Al Dafna, Qatar
... 2009 – May 2011 Responsible for installation or Stationery / Rotary Equipment, piping and other construction work as per approved drawings and procedures by MEW for DAF, UF, RO, Chemical Dosing System and wastewater treatment of Shuwaikh RO project. ...
- Feb 26
Al Dafna, Qatar
... Force Draft, including Plate exchanger area, Wastewater 1&2, Compressor area, BFW Boiler Feed Water Pump. Removal and installation Ethylene Feed Pump Centrifugal Pump, Hot Oil Pump, replacement of Caustic Vessel, Logistic I & II and Dock Unit ...
- Feb 11
Al Thumama, Qatar
... Gas Operating Company Limited (Qatar Energy) Client: Chiyoda Technip Joint venture (CTJV) Project: Engineering, Procurement and Construction (EPC) of Wastewater Treatment Plant (WWTP) in North Field East Project Onshore LNG Facilities, Ras Laffan. ...
- Jan 23
Al Dafna, Qatar
... The project is the latest of a number of wastewater projects that Doha is pressing ahead with as it seeks to expand the country’s utilities infrastructure. Responsibilities & Accomplishments • Responsibility to implement and maintain the QCS 2014 ...
- 2023 Dec 31
Al Dafna, Qatar
... PROFESSIONAL PROFILE With over 12 years of accomplished experience in the environmental field, I possess a comprehensive range of expertise in wastewater treatment technology, air pollution control, environmental impact assessment, and ...
- 2023 Dec 26
Qatar
... Wastewater Treatment Plant Operator, NAM Environmental Inc, NB October 2018-May 2019 Took care of waste treatment facility, water sampling, and chemical handling. Monitored the level of chlorine and PH of drinking and wastewater supply facility. ...