Post Job Free

Resume

Sign in

Rigging Supervisor

Location:
Al Dafna, Qatar
Salary:
7000 QAR
Posted:
February 11, 2024

Contact this candidate

Resume:

JOSE DENVER PAEL

LIFTING/RIGGING SUPERVISOR

Location: DOHA QATAR

Mobile no. +974-********

Email Add: ad3jit@r.postjobfree.com

CORE SKILLS

A competent 24 years of working experience in Various Multi skills 16 years in Rigging Fields, Oil & Gas Industry, Live Plant, EPC Project, Permit Receiver, Mechanical, Warehouse Man, Operates Forklift, Man Lift, and Sea Man. Dock yard with Computer Ms. Word, Ms. Excel, and Basic Sap. With Five Major Turnaround Plant Shutdown at Qatar Chemical, I&II-year 2012, 2015, 2017, 2019& 2022.

Experienced in analyzing weight of load and understanding the rated capacity of the crane & any rigging gears, Transportation of various materials, Making JSA Job Safety Analysis and keeping storing all third-party certificates with up-to-date record. In-depth knowledge of various rigging techniques and rigging equipment & Assessing hazard associated in any Activities.

Demonstrate and promoted safety leadership to the all-rigging crew, monitoring and coordinating all rigging operation and activities on assigned area and ensure completion of safety. Performing inspection and evaluation for the construction equipment (cranes, boom trucks, forklifts, man lifts, overhead crane, and davit Accountable in ensuring all rigging gear and equipment provided by the employer is inspected by the third-party during interval schedule to minimize to prevent the possibility of rigging failure.

EDUCATIONAL BACKGROUND

TRAINING & CERTIFICATE

Rigging Supervisory Third-Party/Qatar Gas Approval

Rigger Third Party Certificate Holder

Scaffold Supervisory Certified Holder

Forklift Third Party Certified Holder

Man, Lift Third Party Certified Holder

Q-safe Improvement Team at Q-Chem

O&I Observer CTJV

Shore Base Fire Fighting

Deck watch keeping

General Tanker Familiarization

Personal Safety and Social Responsibility

Rigging Supervisor Champion Enova/CTJV

SAFETY AWARDS AND TRAINING

Basic Fire Fighting

Lock out Tag out & Try Procedure

Confined Space Entry Procedure

Portable Gas Detector Procedure

Job Safety Analysis Procedure

Crane Lift Procedure

Electrical Safety Standard

Work at heights Procedure

Safety Alarm & Emergency System

bypass Procedure

Opening & Commissioning of Process

Equipment Procedure

Vehicle & Traffic Safety Standard

Q-safe Improvement Team

PROFESSIONAL EXPERIENCE

September 15, 2023, to Present

Milaha Q.P.S.C.

Marine Logistics

Heavy Lift Department

Lifting/Rigging Supervisor

Coordinates Clients /Customer /Logistics officers and Port Officers such as Wasco Port, Army camp, Hamad Hospital, Qatar Foundation, Hamad International Airport, Gulf Chlorine Plant, KLJ Plant and Al Khaleed Company. for the schedule and transportation for the incoming material Shipment.

Doing site visit rigging study / identify the load center of gravity, select the crane check the load charts arrange lifting gears and make a rigging plan.

Offloading, Shifting & Segregation of various materials such as Pipe cement at Wasco Port, 30 Nos, Dum truck, and Dangerous cargoes Army Camp.

Removal and Installation of Mixed Catalyst vessels.

Doing Proof Load test Crane 300tons. QNC 144 at Yard 52 with the Third-Party Person.

Reviewing the Lifting Plan prior to starting the job.

Prepare Task Instructions and conduct a day-to-day Toolbox talk to all Rigging Crew

Manage 12 Riggers 1 Crane Operator at Wasco port Loading/Unloading cement for Offshore McDermott.

April 2022 to June 2023

Enova Contract Trading

Chiyoda/Technip NFE 1 Project

Rigging/Lifting Supervisor

Coordinates Offloading Superintendent / Logistics officers for the schedule and transportation for the incoming material Shipment.

Offloading, Shifting & Segregation of various materials such as FCW pipes, Pipe cement, Slug Catcher Pipe and Mechanical, Instrument and Electrical materials, GTG Gas Turbine Generator skid, HRSG Heat Recovery Generator skid, STG Steam Turbine Generator skid 70ton, Instrument Control Cabin 46-ton, ABB transformer 49-ton, Lube Oil Skid 33-ton, Exhaust Stack Section 29 ton.

Coordinator to the third party to certify all lifting equipment and lifting tackles.

Assembly de assemble of 150 ton & 280-ton Crawler crane.

Doing Proof Load test 100 tons. With the Third-Party Person.

Reviewing the Lifting Plan

Support to Mammoet Company jack down Cold Box 200 ton.

Prepare Task Instructions and conduct a day-to-day Toolbox talk to all Rigging Crew

Manage 15 Riggers 3 Forklift with Operator, 3 Crane with Operator

Keeping up to date all third-party certificates Lifting Equipment and Lifting tackles.

October 18, 2009, to March 29, 2022

Qatar Engineering & Construction Co. WLL

Qatar Chemical Company I & II

Base Load Rigger / Support Services Department

Perform a day to day rigging activities/ involved in all aspect of rigging heavy loads, indoor/outdoor, support all department and subcontractors such as removal & installation of static equipment like pumps, motor, instrument valve, pressure relief valve, civil materials and shifting a various material in any type, shape, weight in all areas.

Coordinates with the third party to certify all lifting equipment and lifting tackles.

Doing site visit rigging study / identify the load center of gravity, select the crane check the load charts arrange lifting gears and make a rigging plan.

Prepare the critical permit if required for the lifting task.

Keeping up to date all third-party certificates Lifting Equipment and Lifting tackles.

Coordinate to Third party person to certify all Lifting Equipment and lifting tackles.

Making of Job Safety Analysis JSA conduct a safety talk box meeting.

Operates Forklift and Man lift.

Operates all kinds of electric/Pneumatic winches or manual chains and EOT cranes.

Wire rope replacement for Gantry Crane.

Assist in repairing elevators and applying for a load test.

Removal and installation and assist to vendor over hauling of Gear box, Extruder Barrel, Extruder Twin Screw length of 12-meter weight of 8 ton using special tools, Extruder Motor Siemens 7 Megawatts, Extruder Gearbox, Twin Extruder cover weighting in 20ton & ton10 using a 40-ton S.W.L. Overhead crane. Rotary Valve, replacement of bag filter and sintered metal filter on the top Reactor 1& 2 on H.P.F.C. High Pressure Flush Chamber, replacement Bushing of Transformer M.V.A. Mega Volt Amperes ALSTOM, Removal installation Heaviest Pump, Decent Pump and Continuous Blender length of 7 meters’ weight of 3 tons, Star up valve, Dryer Pellet,

Removal installation and overhauling of Sea Water Intake Pump and Motor using 2 cranes, Banned Screen. Replacement of bag filter, Hooper Incinerators, some rigging activities in the Boiler area for F.D. Fan 1,2&3. Force Draft, including Plate exchanger area, Wastewater 1&2, Compressor area, BFW Boiler Feed Water Pump.

Removal and installation Ethylene Feed Pump Centrifugal Pump, Hot Oil Pump, replacement of Caustic Vessel, Logistic I & II and Dock Unit removal and installation Gantry Motor, dock loading hose, assist to third party to apply P.L.T. Proof Load Test on elevator gantry, inspection of cable wire of Gantry North & South, and Calibration of weighing bridge, assemble/disassemble of Reach Stacker, assist to Loading Bay to connect the loading hose on ship,

February 23, 2008, to February 23, 2009

DAEWOO ENGINNERING & CONSTRUCTION CO.

Position: Rigger / Mechanical

Responsible for loading/unloading and tilting of concrete Colum weight 25ton to 40tons with the proper handling, lifting and transport. Perform to select/inspect prior to use the lifting tackles as per load configuration and after used. Responsible to shift the load using tower crane using two-way radio communication.

Erection of various static equipment’s such motor, pump and mechanical materials and pipe spool. Beam column and any structural material.

December 3, 2006, to November 18, 2007

CONSOLIDATED CONTRUCTION COMPANY

ROPP, CCC PROJECT, RABIGH K.S.A.

Position: Mechanical Rigger

Performs give signal to crane operator during lifting operation as per standard signal.

Assisting heavy lifts installing of vessel, worked with 300tons, 260tons, 120tons, 80tons, 60tons, 45tons mobile crane, rough terrain, crawler crane.

Loading/unloading of Pipe spool and erect to the pipe rack.

June 14, 2005, to December 1, 2006

WHEELTEK MOTOR SALES CORPORATION

Position: Marketing Consultant/Collector

Conceptualize and coordinate general plans of action to the branch manager for the improvement of sales, such activities: Executive Sales Campaign, Advertisement, and Sales Promo conducting daily, weekly, and monthly sales reports.

November,10 2003 to October 12, 2004

KSERVICO OLONGAPO BRANCH

Position: Collector

Conceptualize and coordinate general plans of action to the branch manager for the improvement of sales, such activities: Executive Sales Campaign, Advertisement, and Sales Promo conducting daily, weekly, and monthly sales reports.

February 03, 2003, to November 05, 2003

PRODUCERS BANK IBA ZAMBALES

Position: Microfinance Account Officer

Conceptualize and coordinate general plans of action to the branch manager for the improvement of marketing such activities, Campaign, Advertisement, and conducting daily, weekly, and monthly collection reports.

December 28, 2002, to February 04, 2003

BONZ RESTAURANT IBA ZAMBALES

Position: WAITER

Responsible for the cleanliness of the branch

Do housekeeping and taking the order of the customer.

May 06, 2002, to June 10, 2002

LORENZO SHIPPING CORPORATION

Position: Able Body

Responsible and performs look out especially at night, keeping up to date record of all cargoes on board during in port operation.

Responsible for managing wheel and immediate response to the Port Cap. Or Ship Capt. While maneuvering when entering and leaving the port.

Secure the Crane Pedestal and gangway and all lifesaving materials on board.

Responsible for securing all cargoes on board.

Prepare / arrange the transportation of all cargoes on port.

March 11, 2001, to August 10, 2001

MITSUMI MARIVELES BATAAN

Position: Warehouse Man

Keep all materials in good packing, keeping up to date records of all data on each material base in the shipment area. Monitor in out.

Good Segregation of finished product, shifting the product using manual pallet jack.

April 23, 2000, to June 07, 2000

LORENZO SHIPPING CORPORATION

Position: Ordinary Seaman

Responsible for securing all cargoes, by securing the turn buckles, housekeeping and keep all lifting tackles on good condition.

Responsible and prepares all maneuvering ropes, upon entering/leaving the port.

Lubrication and replacement of Pedestal crane wire rope

January 07, 1999, up to March 17, 2000

LORENZO SHIPPING CORPORATION

Position: Apprentice Mate

Responsible and performs look out especially at night, keeping up to date record of all data on each ship alteration of course. Monitor all on board Responsible and performs to prepare all ship documents, manifest, Capt. Crew list, upon entering/leaving the port. Responsible to pass, loud and clear to rely from Port Cap. Or Ship Capt. to the wheelsman while maneuvering when entering and leaving the port.

Responsible for documents such as a Clearance from Philippine Port Authority/ Bureau of custom.

Coordinates with the liaison officers on port, Transportation of cargoes loading/unloading.

July 14, 1997, to December 17, 1997

SMOKEYS at SUBIC ZAMBALES

Position: SERVICE CREW / PART TIME JOB

Responsible for the cleanliness of the branch

Keeping inventory record for utensil materials

Taking order to customer

CHARACTER REFERENCES:

Civil Engr. Mark Vargas Cp no.

+94 33537588

CTJV Rigging Supervisor Robert Villaluz CP no.

+974-********

Milaha Heavy Lift Manager Mr, Samuel Francis

+974-********



Contact this candidate