Menifee, CA
... development, distributor support, bids administration, tech support, customer/product training, Professional Experience Gorman Rupp Company 2022-2024 National Pump Company Division, Glendale, AZ International OEM, vertical turbine and booster pumps. ...
- Nov 30
Houston, TX
... SYSTEM ONE, (WHITE CONSTRUCTION, SUGAR CREEK WIND FARM) Jan2020 – Oct 2020 New Holland, IL Project/Cost Engineer Worked on Sugar Creek Wind Farm consisting of 40 Vestas 2.8 WTG (Wind Turbine Generator) /17 2.3 with installation costs estimated at ...
- Nov 30
Constantine, Algeria
... Protection the plant [Balloons,Vessels, Tank, Compressors, Pumps, burners, heat exchanger, turbine, .] with FFS ; Fire fighting system and water spray system, with air detection system . TACHE piping erection, installation of statics equipment ( ...
- Nov 28
Monaco City
... DIETSMANN / Shell Petroleum Development Company (SPDC)/ NNPC – AFAM VI CCGT, Nigeria/ 2013 – Present • Spearhead the strategic planning and execution of maintenance and outage operations for a 660 MW Combined Cycle Gas Turbine (CCGT) power plant. ...
- Nov 28
Pune, Maharashtra, India
... as Senior Engineer Accountabilities Managing the operations & maintenance of the 0.6 MW, 1.25 MW, 1.5 MW capacity wind turbine generator, 33 KV Substation, Switchgears & equipment,SF6 circuit breaker, VCB, power transformer 650/750/1000/1250/1500 ...
- Nov 27
Euless, TX, 76039
... ATS (Airforce Turbine Service) Mathis, TX 78368 July 2013 – November 2018 Disassembled turbo-prop engines of PT6A. Cleaned and inspected aircraft parts. Sent parts out for overhaul or scrapped parts. Level 2 NDT inspector of parts DAI (Dallas ...
- Nov 26
Louisville, KY
... Intalling turbine 4. Intalling support 5. Driving mainlift 6. Driver sisorslift Pipefitter Brown & Brown Absence Services-Baton Rouge, LA March 2020 to April 2021 1. Pipe fitter class A 2. Read ISO 3. Installing pipe in module 4. Installing valves 5 ...
- Nov 26
Wichita, KS
... BOEING Company, Huntington Beach, California 05/2012 – 12/2012 - Performed strength and vibration analyses of equipment/system support structures installed to front spar Section 11, Ram Air Turbine support structures in Section 46 of 787-9 using ...
- Nov 25
India
... Design, Supply, Erection, testing and commissioning of Electro Mechanical works such as Vertical-Single Stage-Francis Turbine Pump and Synchronous moter sets for 9 No.s of 145MW each including all accessories and Construction of tunnel from Km25 ...
- Nov 24
Sonbhadra, Uttar Pradesh, India
... Valves & Actuators: Control Valves, Hydraulic Valves, AUMA MOVs, Hydraulic Actuator Calibration Protection Systems: Boiler and Turbine Protection Logic Checking Support Systems: UPS Charger Maintenance, Logic & Signal Diagram Analysis, Excel / MS ...
- Nov 24