|
Resume alert |
Resumes 31 - 40 of 46 |
Tiruchirappalli, TN, India
... Position : PLANT MANAGER – OPERATION & MAINTENACE Project : Grasim industry Power Plant 90 MW (CPP) Period : 15/02/2015 TO TILL WORKING I have good knowledge of Boiler, Turbine, Heaters, Blowers, Fans, Steam Piping, and Computerized Maintenance ...
- 2016 Dec 09
Tiruchirappalli, TN, India
... EXPERIENCE DETAILS From Dec “13 to Till date Camfil Air Filtration India Pvt.Ltd, Trichy as a Production Engineer Product: Air intake system, ventilation system, Exhaust system and Support structures for Gas Turbine Power plant Direct Customers: GE ...
- 2016 Nov 01
TN, 613001, India
... / Achievements: Work Experience 2: Installation, Commissioning, testing and trouble shooting of 1650 KW wind turbineswhich include introductory operation and use of working with hydraulics, electrical, mechanical tools and basic turbine equipment. ...
- 2016 Jul 03
Tiruchirappalli, TN, India
... Commissioning & Operation experience of 33 MW CO fired boiler, SNK Turbine, Generator & its auxiliaries. Commissioning operation experience of 30 MW CFBC boilers, SIEMENS Turbine, Generator & its auxiliaries. At present working as a CONTROL DESK ...
- 2016 Apr 17
TN, 621005, India
... The superheated steam is taken to the High Pressure Steam Turbine (HPT).In the HPT the steam pressure is utilized to rotate the turbine and the resultant is rotational energy. The rotational energy imparted to the turbine by high pressure steam is ...
- 2015 Jul 11
Thiruvellarai, TN, 621009, India
... Diesel generator,(Caterpillar c-175 acert) rolls Royce Bergen diesel generator SGT300 gas turbine generator 7mw(Siemens) starting aircomprosser and rig air compressor, (Tomrotor,ingersell rand,quincy) air dryersystem(desiccant dryers or twin tower ...
- 2015 Apr 20
Tiruchirappalli, TN, India
... It generates captive power from Turbine (1*30 MW and 1*25MW -make Siemens) with 150TPH (CFBC) Thermal Make & 110TPH (CFBC) IJT make Boiler. KEY DELIVERABLES . Maintenance of machineries. . Prepare permit sheet and daily report for the power plant. ...
- 2014 Nov 29
Tiruchirappalli, TN, India
... Project2: Project details: Improve the Performance of Steam Turbine Power plant by using Supplementary Fired System with Extraction Turbine. This method is used to increase the inlet temperature of the steam turbine and get more power generation ...
- 2014 Nov 11
Tiruchirappalli, TN, India
... MINI PROJECT: : “Design and fabrication of Pelton wheel turbine”. Title Duration : Two months (2013). Team : Four. DESCRIPTION: In this project, work is carried on designing and fabricating the pelton wheel turbine. This project is used in the ...
- 2014 Aug 12
Tiruchirappalli, TN, India
... for the mini-project “ AUTOMATED POWER SUPPLY” conducted by ISTE at JJCET, Trichy Presented mini-projects “PISTON ACTION TURBINE” and “MULTI DEVICE CONTROLLER” held at JJCET, Trichy conducted by ISTE Presented papers on the topic 4G TECHNOLOGY & ...
- 2014 Jul 13