|
Resume alert |
Resumes 41 - 46 of 46 |
Trichy, TN, 621711, India
... Make : Cethar Ltd (Formerly Cethar vessels Ltd) Capacity : 451TPH, 140Kg/cm2, 540 5?C Turbine details: Type : Impulse Reaction, Condensate Turbine. (Single Cylinder) Make : HTC, China. Condenser : Water Cooled Condenser. Automated by : Emerson DCS. ...
- 2013 Aug 03
Thiruchirappalli, TN, 621210, India
... 12.5 MW BHEL Extraction cum condensing Steam Turbine. 1. Knowledge of AFBC boilers and HRSG; including boiler operation & maintenance, burners/igniters, combustion, emissions, air heaters and other direct auxiliary equipment. 2. Technical support ...
- 2013 Jul 15
Tiruchchirappalli, TN, India
... • Maintenance& servicing of motion switches, tilt switches, vibration switches,, encoders, vortex flow meters, turbine flow meters, MOV’s, metal detectors, Blockage sensors. WORK EXPERINCE IN INDIA (From June 2004 to July 2007) Worked as a ...
- 2012 Dec 30
TRICHY, TN, 621717, India
... • Handled all types of pumps, like Reciprocating pumps, Screw pumps, Gear pumps & Metering pumps in dosing Pump and also in Turbine driver Multistage centrifugal pumps. • Commissioning of Decoke compressor,FD Fan in the Boiler • Commissioning of ...
- 2012 Sep 19
Tiruchchirappalli, TN, India
... INDUSTRIAL TRAINING: Undergone training in ENNORE POWER PLANT, Chennai related with maintaining TURBINE AND BOILER. HOBBIES: Paintings like free hand drawings, glass paintings and photography Listening to Music. PERSONAL DETAILS: Full Name : M. ...
- 2012 Jul 11
Tiruchirapalli, TN, India
... Inspection of Systems: Boiler Air & Gas Boiler Steam & Water Soot Blowers Fuel firing Electric Precipitator & Ash Handling Turbine and Auxiliaries Company: National Contracting Company Ltd., Saudi Arabia Project: Shoaiba Phase I ESP Project, SWCC ...
- 2010 May 04