Post Job Free

Resume

Sign in

Engineer Maintenance

Location:
New York, NY
Posted:
December 07, 2016

Contact this candidate

Resume:

Curriculum Vita

Of

Mahmoud ABD Elhamid

+1-347-***-****

+1-315-***-****

+965-********

+20-114*******

E-mail:

acxs48@r.postjobfree.com

PERSONAL INFORMATION

Nationality: Egyptian /green card holder

Date of Birth: 29th of JUN. 1977

Place of Birth: Egypt

Linguistic Ability: Speak and Write Fluent Arabic, English Interests: Programming, Reading, Traveling, Sports and joining others EDUCATION

Helwan University SEP 1996 - NOV 2001

Helwan, Egypt

• B.Sc. in Communication Engineering - College of Engineering Science, Strengths & Skills

• Strong Communications skills

• Strong relationships with key playas within SEC, SWCC & Aramco.

• Goals achiever & self motivated

• Strong leadership skills

• Strong negations skills

• Ability of fault analysis

• Ability to work under pressure

• Ability of research and development

Leadership training:

* Finance for none finance training ( Ge training center )

* BELS ( Ge training center )

* FOL (foundation of leadership) ( Ge training center )

* Presentation skills ( GE training center)

* Influencing Skills at GE ( GE training center)

* Effective Coaching Skills ( GE training center)

* Managing at Ge ( GE training center)

* RCA Leader Qualification process in GE Power ( GE training center)

* Communication strategies (American university in Kuwait)

* Negotiations skills (American university in Kuwait)

* Solving conflicts (American university in Kuwait)

* Communication skills (American university in Kuwait)

* Public speaking (American university in Kuwait)

* Finance and accountant for none finance professional (American university in Kuwait) Technical training:

* MKV Gas Turbine Controls

* MKVIe DCS Controls system ( GE training center)

* MKVIe Gas Turbine Controls Niskayuna, New York,USA ( GE training center)

* MKVIes safety controllers Niskayuna, New York,USA ( GE training center)

* MKVI Gas Turbine Controls Kuwait ( GE training center)

* CCNA in network design

Awards:

1- ( expertize )

December 2014, silver award from the facility manager for saving the plant from long total plant shutdown (weeks) by finding the solution and take the responsibility and decision and showing exceptional ownership and leadership.

2- (Deliver results in an uncertain world)

March 2014 Bronze award from the regional manager for Experience and working out the comfort zone made a commitment to customer and leadership (3 weeks earlier to their commitment to customer). 3- September 2014 awarded ( thanks letter ) from COE team from Atlanta as an audit result for following the quality work instructions and taking the lead for creation the FMEA for all the plan /instrumentations /valves /systems,

Ordering spare parts through FMEA to reduce the coast. 4- January 2016 awarded (thanks letter) Stay lean to go fast. WORK EXPERIENCE

February 2011- present

Instrumentation & control team leader (General electric –Kuwait) Responsible for

.

• Provide leadership to the maintenance team (Instrument & Control) in the day to day maintenance activities.

• develop, supervise and co-ordinate plant maintenance activity

• Maintaining records prepare reports and compose correspondence relative to work, Analyze and report any incident.

• Promote development and succession management in Instrument & Control Section.

• Effectively manage customer communication and contract delivery.

• Influence and lead initiatives with the leads to drive operational excellence and customer satisfaction.

• Develop resource estimates and assign site teams based on project requirements

• Forming new team to be able to carry out all activities related (preventive & corrective maintenance)

• Influence engineering and the technology teams to enhance flexible plant operation and maximize plant reliability

• Train the subordinates on preventive and corrective maintenance / develop training schedules/plans for Engineers and technicians in I&C section

• Monitor the performance in all areas including cost, schedule, technical advisory services, EHS and quality

• Execute work order through CMMS and co-ordinate with I&C Team for job completion and technical matters.

• Plan and scheduling outage works with due regard to annual scheduled maintenance plan.

• assess plant needs for spare parts & supplies and generate material requisitions

• co-ordinate with Stores and Procurement for inventory management

• Control plant inventory via CMMS system (Maximo).

• Full knowledge of EHS policies & procedures and ensures compliance.

• Evaluate, plan and lead plant housekeeping.

• Assist and co-ordinate with EHS Manager/Supervisor on all EHS activities including implementation of policies/procedures, inspections and audits.

• Ensure compliance in all areas of Health, Safety and Environmental programs and procedures as applicable to the maintenance activities.

• Control all maintenance documents as outlined on the site Master List of Controlled Documents.

• lead the set up and operation of site I&C lab

• Write technical maintenance procedure.

• Develop and maintain new solutions for the technical and process challenges

• Write the PM & PDM plan.

• Create the critical items list (effecting the plant reliability and availability)

• Diagnosing, maintaining, troubleshooting and solving all technical problems related to 6 units 9FA combined cycle

• Respond to the operational service requests and taking the appropriate action (follows the WCR procedure, assign the required resources to do the required action...etc.)

• Prepare the budget for the I&C department

• Develop and maintain the FEMA process for the plant

• Maintain the plant history & parts life history on commercially available software

• ensuring that technical standards and specifications are created, documented and maintained

• managing/coordinating engineering contractors and equipment vendors September 2009 –January 2011

Warranty control engineer at Jizan Power Plant, working For Eltokhi contracting company. Responsible for:

* diagnosing, maintaining, troubleshooting and solving all technical problem related to GT9

* Handled a MARKVI & MKVIE & EX2100 start-up on 5 machine in Jizan power plant

* Was involved in the upgrade of 5 gas turbines farm 5 from Mark#2 to Mark Vie

* Managing customer communication and contract delivery.

* Managing the open WCRs on GT#9

* Calibrating all smart devices in field and conducting loop and function checks for the new instrumentations

January 2009 – September 2009

Startup control engineer working for Arabian Bemco contracting company Responsible for:

Commissioning 15 units 7FA, MKVI Control SYSTEM

Handled the installation, commissioning and the start-up of 15 units 7FAGasTurbines In Qurarayyah Power Plant Project

* Responsible for good monitoring the circumstances of work every hour

* Responsible for commissioning gas fuel system controlled by MARKVIE control system May 2008 – December 2008

Maintenance Manger Working for SEC (Saudi Electricity Company) at PP9 site

* Handled the installation, commissioning and the start-up of General Electric Company, MKVI Control system on 32 GE MS7EA Gas Turbines at PP9 Riyadh.

* Formed very good team work atmosphere with high efficiency and activities

* Responsible for keeping the continuity of the safe operation Gas Turbine Generators equipment

* Responsible for diagnosing, maintaining, troubleshooting and solving al the technical issues

* Responsible for Solving any problem which appears between technicians/engineers to keep the harmony of work

* Responsible for Good monitoring the circumstances of work every hour August 2007 –May 2008 (Arabian Bemco contracting)

Warranty control engineer at Najran site working for Arabian Bemco contraction company

* Responsible for calibrating all smart devices in field by using hart communicator and conducting loop and function checks for new

* Responsible for diagnosing, maintaining, troubleshooting and solving all technical problem related to GT9

* Responsible for upgrading 5 FIAT units to MarkVIe and integrating the 10 units with DCS MARKVIE control system

* Involved in start-up off 32 General Electric Company Of USA Gas Turbine Generators MS7001EA at PP9 Riyadh

* Instructed 12 MKV, MKVI, MKVIe .Maintenance Training Courses held for many customers.

* Instructed two MKIV Maintenance Training Courses held for SABIC.

* Handled a MKVIE & EX2100 start-up on a Fiat machine in NAJRAN site interface between the MKVI GE System and the MKVIE DCS System.

* Involved in the commissioning of many GE Switchgears.

* Commissioned many of the GE & GE- Multiline Digital Relays Like:

- DGP (Digital Generator Protection).

- DTP (Differential Transformer Protection).

- MDP (Over Current Relay).

June 2007 – September 2007 (Arabian Bemco contracting)

* Working for Arabian Bemco contracting company at Riyadh PP9 as maintenance operation technical advisor engineer.

* Operating and maintaining the 10 units of Block C (GAS turbine 75MW frame 7EA MARKVI) via diagnosing all technical troubleshooting to keep the continuity of the operation May 2004 – June 2007 Working for (Egyptian Electricity Authority) Maintenance engineer

Working for Egyptian Electricity Authority

Involved in the MKV, MKIV Control System, unit is GE – MS 9001E, 115 Mw Industrial gas turbine in Combined cycle with one Vogt HRSG and one GE, 60 Mw steam Turbine at Cairo South Power Station

Instructed 8 MKV Gas Turbine Maintenance Training Courses held for ARAMCO.

Involved in the commissioning of many General Electric Company Switchgears.

Responsible of conducting Performance, on load and no load tests and reliability tests on General Electric Company Gas Turbines.

Have experience in the following system

Westinghouse control system training WDPF

WDPF system maintenance

WDPF system user

WDPF system operator (control room)

DCS system operation and maintenance

GENERAL ELECTRIC control system

• MARKIV system maintenance

• MARKV system maintenance

• MARKVE control system maintenance

• Good experience in plc Allen-pradley,operation and maintenance

* In Commissioning:

:

- Operability of each part automatically and also manually. January 2004 – May 2004 (Working for Egyptian Electricity Authority) Shift Charge Engineer

Responsible for keeping the continuity of the safe operation for operators

monitoring the circumstances of work every hour

In charge of MKV control system for three GENERAL ELECTRIC gas turbines (113mw,Frame 9E) as a simple cycle and DCS and speed speedtronic (MarkV) for a combined cycle (175mw) and water treatment plant ( 3 * 35m3/hr) contains three trains controlled by DCS control system.

In the case of Startup & Shutdown that is very important that every thing in the locale must be lined up by good mechanical and electrical isolations and removing these isolations in start up January 2001 – January 2004 (NADA COMPANY)

Network Engineer

Installation of and start-up of LAN, WAN computer network.

Computer Network Planning & Operating. & maintenance in domain network,ISDN, DSL,WORKGROUP

Computer Maintenance

System integrator in the field of information and communication technology. Technical Support & Network Engineer this includes hardware technical Support plus designing, implementing and troubleshooting PC (HP, COMPAQ, DELL,) based LAN

& WAN.

Working under windows NT/XP/2000/2000 server/2003 SERVER/XP/OS2/MAC OS operating system Microsoft Office 2000 & XP.

perfect in computer skills have experience to work with all type of computer all operation SYSTEM

EXTRACURRICULAR ACTIVITIES

Two Years’ Experience in Grading the Students’ Homework’s at Helwan University.

A vice-president of one of a Student Compounds at HELWAN UNIVERSITY for One Year. REFERENCES

All References are Available under Request.