|
Resume alert |
Resumes 51 - 60 of 60 |
Alpharetta, GA, 30022
... Managed the requirements gathering, design and implementation of a turbine POS system. Directly accountable for full project life cycle process including identifying requirements, designing, testing and implementing applications. Partnered with ...
- 2010 Aug 30
Duluth, GA, 30096
... Inventory trailer sized turbine engine repair tool kits for gas, coal, nuclear and steam power plants for General Electric, U.S. and global. . Replenish tool inventory to maintain company and OSHA VPP Star specifications . File required report for ...
- 2010 Aug 30
Roswell, GA, 30075
... Grew OEM turbine business with General Electric, Alstom Power and Siemens Westinghouse by negotiating favorable pricing and deliveries. ? Acquired new business at the contractor level with TIC Industrial, Kamtech, Inc., Republic Refrigeration, Inc. ...
- 2010 Aug 25
Atlanta, GA, 30350
... Performed projects as assigned by shift engineer from turbine start up and shut down, boiler components inspection, operation, and isolation. . Implemented the Lockout/Tagout procedures per the current clearance procedure. . Assisted in supervising ...
- 2010 Aug 14
Atlanta, GA, 30338
... **** ******** **** #****, *******, GA 30338 678-***-****/ abl2vh@r.postjobfree.com SUMMARY An experienced, performance driven engineer with a background in marine and aerospace gas turbine industry possessing a versatile analytical background, ...
- 2010 Aug 10
Canton, GA, 30114
... Siemens Westinghouse TXP DCS System/95F Turbine • Instrumental in Development of Steam plant Protection System Factory Acceptance Testing Procedures and Site Commissioning Procedures. These procedures reduced the time requirement for commissioning ...
- 2010 Jul 05
Suwanee, GA, 30024
... Managed the mobilization and demobilization of six-month construction phase of wind turbine sites in both the U.S. and Canada. . Extensive use of Oracle in coordination and tracking of all indirect material to support project site. Administrative ...
- 2010 Jun 27
Dacula, GA, 30019
... Analyzed 30MW Gas Turbine (Frame-6) for problem of high vibration during commissioning because of bearing, gears and base frame were detected and take-up with the supplier and resolved before final acceptance. . Acoustic Emission Testing (AET) for : ...
- 2010 May 19
Alpharetta, GA, 30005
... and Latin America for a major international carrier, specializing in transportation, handling and storage of steel, bulk and project cargo (including wind turbine project from Asia to U.S. for GE) Implemented changes in various terminals and ...
- 2010 Apr 17
Duluth, GA, 30097
... warehouse management, planning and forecast, foreign trade zone, receiving and shipping for a French international gas turbine helicopter engine company Coached procurement team in achieving 26% inventory reduction of direct parts through minimum ...
- 2010 Mar 09