|
Resume alert |
Resumes 11 - 20 of 22 |
Alexandria, Alexandria Governorate, Egypt
... - Graduation Project : Improvement The Performance Of Wind Turbine, Grade : Excellent. Work History - Maintenance Engineer At Water And Drainage Company During Time (6/2018 Till Now ). - Maintenance Engineer At Misr Engineering Company During Time ...
- 2018 Jul 01
Alexandria, Alexandria Governorate, Egypt
... Ethernet (TCP/IP network), LHMI DCS software and hardware activities for Steam Turbine, Gas Turbine, Boiler, and all auxiliaries controlling involved in monitoring and troubleshooting including: 1-DCS loop check, console graphic & console database. ...
- 2018 Apr 22
Alexandria, Alexandria Governorate, Egypt
... : Compressors * Dealt with expansion turbine .It is the machine which responsible of high pressure decreases to give power and decrease the temperature. : Turbines * Dealt with several kinds of pumps like centrifugal pumps and piston pumps to handle ...
- 2017 Dec 08
Alexandria, Alexandria Governorate, Egypt
... Owner (Ministry of Electricity) main contractor (Orascom&semenise) designer (PEGASCO) Steel member fabricated in Italy (meag.ompa) (Sub-contractor elwadi) 3Sep2016 to 2feb2017 Site engineer Responsible for (Module 4 steam turbine building1200mw) 1.… ...
- 2017 Dec 05
Alexandria, Alexandria Governorate, Egypt
... Wind Turbine. (Bachelor’s Degree) Publications 1. Sherif S. Rashwan, Ahmed M. Shaaban, Fahad Al-Suliman, “A comparative study of a small-scale solar PV power plant in Saudi Arabia,” Renewable and Sustainable Energy Reviews, vol. 80, no. November ...
- 2017 Nov 13
Alexandria, Alexandria Governorate, Egypt
... - Gas Turbine(operation, Troubleshooting and Maintenance). - Machine Alignment Balancing and Mechanical Sealing. - Vibration Monitoring and Analysis for Turbo machinery protection system VOLUNTEERING EXPERIENCE Academic Coach AVAD Club (Alexandria ...
- 2017 Nov 12
Alexandria, Alexandria Governorate, Egypt
... Product Design: New Wind Turbine concept design - Wind trap Designed the basic form of a new type of wind energy turbine using the Environmental-Based Design (EBD) methodology and the theory of inventive problem solving (TRIZ). Project Report: ...
- 2017 Oct 15
Alexandria, Alexandria Governorate, Egypt
... Plant Engineering & Constriction Co.LTD PROJECT : Cairo North Power Station 750 MW Combined Cycle Project ( 1*250 MW STEM TURBINE ) CLIENT : HITCHI LTD, SUMITOMO CORPORATION TITLE : SUPERVISOR RIGGING WORK COMPANY : Hitachi Plant Engineering & ...
- 2017 Apr 03
Alexandria, Alexandria Governorate, Egypt
... EXPERIENCE From 1/4/2016 till now shift charge engineer SIEMENS (SGT5_8000H) the combined cycle power plant 4800 MW divided to 8*400 MW SIEMENS gas turbine plus 4*400 MW SIEMENS steam turbine I started training technical and management for 6 months. ...
- 2017 Jan 09
Alexandria, Alexandria Governorate, Egypt
... Gas Turbine Operation, Selection, Troubleshooting and Maintenance. 7. Vibration Monitoring and Analysis for Turbo Machinery. 8. Machine Alignment, Balancing and Mechanical Sealing. 9. Pipe line Systems Design. AutoCAD course certified from Autodesk. ...
- 2016 Nov 13